05000445/LER-1991-003, Advises That LER 91-003-01 Re Less than Adequate Procedure Review Leading to Failure to Fully Satisfy ASME Section XI Testing Requirements Delayed from 910329 to 0429 | 28 March 1991 | Advises That LER 91-003-01 Re Less than Adequate Procedure Review Leading to Failure to Fully Satisfy ASME Section XI Testing Requirements Delayed from 910329 to 0429 | |
05000445/LER-1993-010, Forwards LER 93-010-00 Re Hot Particle Contamination Resulting in Exposure Exceeding 10CFR20 Skin Dose Limits | 17 December 1993 | Forwards LER 93-010-00 Re Hot Particle Contamination Resulting in Exposure Exceeding 10CFR20 Skin Dose Limits | |
05000445/LER-1995-003, Forwards Suppl 1 to LER 95-003 Re Loss of Both Condensate & Both FW Pumps Due to Failure of non-safety Related Inverter, Resulting in Manual Reactor Trip.Suppl Provides Addl Info on Cause of Event,Corrective Actions & Preventiv | 14 August 1995 | Forwards Suppl 1 to LER 95-003 Re Loss of Both Condensate & Both FW Pumps Due to Failure of non-safety Related Inverter, Resulting in Manual Reactor Trip.Suppl Provides Addl Info on Cause of Event,Corrective Actions & Preventive Actions | |
05000445/LER-1995-004, Forwards Suppl LER 95-004-001 for CPSES Unit 1,because Time Requirements for Action Statements Not Met,Per Enforcement Discretion for Testing Tdafwp at Mode 3,granted by NRC | 8 September 1995 | Forwards Suppl LER 95-004-001 for CPSES Unit 1,because Time Requirements for Action Statements Not Met,Per Enforcement Discretion for Testing Tdafwp at Mode 3,granted by NRC | Enforcement Discretion |
05000445/LER-1996-009, Forwards LER 96-009-00 Re 480 Volt Switchgear Breakers Racked Out in Cubicle in Remove Position Resulting in Seismically Unqualified Condition Outside Design Basis | 10 December 1996 | Forwards LER 96-009-00 Re 480 Volt Switchgear Breakers Racked Out in Cubicle in Remove Position Resulting in Seismically Unqualified Condition Outside Design Basis | |
05000445/LER-1997-004, Forwards LER 97-004-06 Re Issues Discovered During Review of GL 96-01 Associated W/Ts Surveillances.No New Licensing Basis Commitments Re CPSES Contained in Communication | 8 May 1998 | Forwards LER 97-004-06 Re Issues Discovered During Review of GL 96-01 Associated W/Ts Surveillances.No New Licensing Basis Commitments Re CPSES Contained in Communication | |
05000445/LER-1997-005, Forwards LER 97-005-00 Which Declared MSSVs Inoperable When Valves Failed TS Surveillance Testing | 15 September 1997 | Forwards LER 97-005-00 Which Declared MSSVs Inoperable When Valves Failed TS Surveillance Testing | |
05000445/LER-1997-006, Forwards LER 97-006-01 Re Discovery of Control Room HVAC Emergency Pressurization Unit to Be Outside TS Limits.Ler Issued to Document Addl Info Noted During Review of Event | 18 October 1997 | Forwards LER 97-006-01 Re Discovery of Control Room HVAC Emergency Pressurization Unit to Be Outside TS Limits.Ler Issued to Document Addl Info Noted During Review of Event | |
05000445/LER-1997-008, Forwards LER 97-008-01 Re Min Gap for Cold Leg Injection ECCS Throttle Valves Not IAW Design.Suppl Issued to Revise Implementation of Cas.Commitment Made by Util,Provided | 27 February 1998 | Forwards LER 97-008-01 Re Min Gap for Cold Leg Injection ECCS Throttle Valves Not IAW Design.Suppl Issued to Revise Implementation of Cas.Commitment Made by Util,Provided | |
05000445/LER-1997-009, Forwards LER 97-009-00 Re Manual or Automatic Actuation of Reactor Protection Systems.Commitments Made by Util,Encl | 25 November 1997 | Forwards LER 97-009-00 Re Manual or Automatic Actuation of Reactor Protection Systems.Commitments Made by Util,Encl | |
05000445/LER-1998-003, Forwards LER 98-003-00,re SG Tube Plugging Due to Stress Corrosion Cracking.Ltr TXX-98117 Details Plugging & Indication List & Provides Condition Monitoring Rept Is Attached to Supplement Info Herein | 1 May 1998 | Forwards LER 98-003-00,re SG Tube Plugging Due to Stress Corrosion Cracking.Ltr TXX-98117 Details Plugging & Indication List & Provides Condition Monitoring Rept Is Attached to Supplement Info Herein | |
05000445/LER-1998-004, Forwards LER 98-004-00,re Failure to Perform Response Time Testing of Shunt Trip Feature of Reactor Trip Breaker. Commitments Made within Ltr,Listed | 26 May 1998 | Forwards LER 98-004-00,re Failure to Perform Response Time Testing of Shunt Trip Feature of Reactor Trip Breaker. Commitments Made within Ltr,Listed | |
05000445/LER-1998-005, Forwards LER 98-005-00,re Functional Requirements of Hps Not IAW Design.Commitments Made within Ltr,Listed | 17 July 1998 | Forwards LER 98-005-00,re Functional Requirements of Hps Not IAW Design.Commitments Made within Ltr,Listed | |
05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 | 8 June 1999 | Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 | |
05000446/LER-1993-008, Revised Ltr Correcting Docket Number & Rept Date to LER 93-008-00 Re Auto Start of Both Motor Driven Feedwater Pumps Which Caused ESF Actuation | 29 October 1993 | Revised Ltr Correcting Docket Number & Rept Date to LER 93-008-00 Re Auto Start of Both Motor Driven Feedwater Pumps Which Caused ESF Actuation | |
05000446/LER-1994-005, Discusses Info Re LER 94-005-00 for Comanche Peak Steam Electric Station Re Continued Vibration Induced Fatigue Leading to Failure of Addl Welds in Containment Spray Sys | 5 October 1994 | Discusses Info Re LER 94-005-00 for Comanche Peak Steam Electric Station Re Continued Vibration Induced Fatigue Leading to Failure of Addl Welds in Containment Spray Sys | |
05000446/LER-1994-022, Forwards LER 94-022-01 Re Labeling Error Leading to Inoperability of Power Range Instrumentation | 19 May 1995 | Forwards LER 94-022-01 Re Labeling Error Leading to Inoperability of Power Range Instrumentation | |
05000446/LER-1997-001, Forwards LER 97-001-00 Re Auxiliary Feedwater Sys Admission Valve Failed Open Due to Ruptured Diaphragm. Rept Satisfies Reporting Criteria of 10CFR21 | 15 May 1997 | Forwards LER 97-001-00 Re Auxiliary Feedwater Sys Admission Valve Failed Open Due to Ruptured Diaphragm. Rept Satisfies Reporting Criteria of 10CFR21 | |
05000446/LER-1997-003, Forwards LER 97-003-00 Re Core Alterations Performed Before Completing All Prerequisites | 8 December 1997 | Forwards LER 97-003-00 Re Core Alterations Performed Before Completing All Prerequisites | |
05000446/LER-1997-004, Forwards LER 97-004-01,re Gaps in Structural Components of Containment Sump Trash Racks.Supplement Provides Results of follow-up Commitments to Review Similar Past Work & Inspect Unit 1 Containment Sump Trash Racks | 8 June 1998 | Forwards LER 97-004-01,re Gaps in Structural Components of Containment Sump Trash Racks.Supplement Provides Results of follow-up Commitments to Review Similar Past Work & Inspect Unit 1 Containment Sump Trash Racks | |
05000446/LER-1997-005, Forwards LER 97-005-00 Re Inoperability of Containment Personnel Airlock Door During Core Alterations.Commitment Made by Util,Encl | 10 December 1997 | Forwards LER 97-005-00 Re Inoperability of Containment Personnel Airlock Door During Core Alterations.Commitment Made by Util,Encl | |
05000446/LER-1998-002, Forwards LER 98-002-00,re Automatic Reactor Trip Caused Subsequent to Turbine Trip Due to Loss of Turbine Plant Cooling Water. Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 | 6 April 1998 | Forwards LER 98-002-00,re Automatic Reactor Trip Caused Subsequent to Turbine Trip Due to Loss of Turbine Plant Cooling Water. Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 | |
05000456/LER-1986-009, Informs of Typo in LER 86-009-00 Re Issuance of Suppl to Ler.No Suppl Will Be Issued | 21 January 1987 | Informs of Typo in LER 86-009-00 Re Issuance of Suppl to Ler.No Suppl Will Be Issued | |
05000456/LER-1993-007, Resubmits LER 93-007-00 to Correct Incorrect Date on Transmittal Cover Ltr | 11 February 1994 | Resubmits LER 93-007-00 to Correct Incorrect Date on Transmittal Cover Ltr | |
05000456/LER-1997-009, Forwards Supplement to LER 97-009-00,originally Submitted on 971126,IAW 10CFR50.73(a)(2)(ii) | 20 March 1998 | Forwards Supplement to LER 97-009-00,originally Submitted on 971126,IAW 10CFR50.73(a)(2)(ii) | |
05000456/LER-1998-003, Forwards LER 98-003-00 from Braidwood Generating Station,Iaw 10CFR50.73(a)(2)(iv).Listed Commitments Made in LER | 6 October 1998 | Forwards LER 98-003-00 from Braidwood Generating Station,Iaw 10CFR50.73(a)(2)(iv).Listed Commitments Made in LER | |
05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations | 16 June 1999 | Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations | |
05000456/LER-1998-005, Forwards LER 98-005-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed | 3 November 1998 | Forwards LER 98-005-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed | |
05000456/LER-1998-006, Forwards LER 98-006-00 IAW 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Rept.Ler Commitments Listed | 16 December 1998 | Forwards LER 98-006-00 IAW 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Rept.Ler Commitments Listed | |
05000456/LER-1998-007, Forwards LER 98-007-00,IAW 10CFR50.73(a)(2)(v).Commitments Made Listed | 16 December 1998 | Forwards LER 98-007-00,IAW 10CFR50.73(a)(2)(v).Commitments Made Listed | |
05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed | 15 June 1999 | Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed | |
05000457/LER-1988-011, Withdraws LER 88-011-01 Re Reactor Shutdown as Result of Valve 2SI89089B Declared Inoperable Due to non-environ Qualified Motor.Addl Info Submitted Proved Motor Was Environ Qualified to Required Stds & No Shutdown Required | 17 February 1989 | Withdraws LER 88-011-01 Re Reactor Shutdown as Result of Valve 2SI89089B Declared Inoperable Due to non-environ Qualified Motor.Addl Info Submitted Proved Motor Was Environ Qualified to Required Stds & No Shutdown Required | |
05000457/LER-1997-004, Forwards LER 97-004-00 from Braidwood Generating Station IAW Requirement of 10CFR50.73(a)(2)(iv),which Requires 30-day Rept.Ler Was Originally Transmitted W/Error in Reportability Requirements of Cover Ltr Only | 14 November 1997 | Forwards LER 97-004-00 from Braidwood Generating Station IAW Requirement of 10CFR50.73(a)(2)(iv),which Requires 30-day Rept.Ler Was Originally Transmitted W/Error in Reportability Requirements of Cover Ltr Only | |
05000457/LER-1997-005, Forwards LER 97-005-01,supplement Rept for LER 97-005-00 Submitted on 971205,per 10CFR50.73(a)(2)(i)(B) | 25 March 1998 | Forwards LER 97-005-01,supplement Rept for LER 97-005-00 Submitted on 971205,per 10CFR50.73(a)(2)(i)(B) | |
05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below | 16 June 1999 | Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below | |
05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed | 21 May 1999 | Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed | |
BW980057, Forwards MOR for Sept 1998 for Units 1 & 2.Original Sent & Not Available.Distribution Methods to Ascertain Difficulty Being Reviewed | 27 October 1998 | Forwards MOR for Sept 1998 for Units 1 & 2.Original Sent & Not Available.Distribution Methods to Ascertain Difficulty Being Reviewed | |
BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 | 10 June 1999 | Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 | |
BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted | 15 July 1999 | Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted | |
BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 | 16 July 1999 | Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 | Post Accident Monitoring |
BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr | 28 July 1999 | Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr | |
BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle | 4 August 1999 | Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle | Fuel cladding |
BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station | 12 August 1999 | Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station | |
BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 | 13 August 1999 | Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 | |
CLI-88-12, Advises That Jj Macktal 881215 Motion for Limited Intervention & 881230 Motion for Reconsideration of CLI-88-12 May Be Dispositioned by Commission or Referred to Aslb.W/Certificate of Svc.Served on 890315 | 15 March 1989 | Advises That Jj Macktal 881215 Motion for Limited Intervention & 881230 Motion for Reconsideration of CLI-88-12 May Be Dispositioned by Commission or Referred to Aslb.W/Certificate of Svc.Served on 890315 | |
CPSES-199901700, Forwards Rev 15 to CPSES Fire Protection Rept & Description of Changes | 16 April 1999 | Forwards Rev 15 to CPSES Fire Protection Rept & Description of Changes | Safe Shutdown Fire Protection Program Early Warning Fire Detection |
DD-87-10, Informs That Time within Which Commission May Act to Review Director'S Decision DD-87-10 Expired.Commission Declined Review.Decision Became Final Agency Action on 870720.Served on 870728 | 28 July 1987 | Informs That Time within Which Commission May Act to Review Director'S Decision DD-87-10 Expired.Commission Declined Review.Decision Became Final Agency Action on 870720.Served on 870728 | |
DD-87-17, Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 871117 | 17 November 1987 | Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 871117 | |
DD-92-06, Advises of No Adequate Basis in 920519 Petition for Taking Action Requested.Director'S Decision DD-92-06 Responding to Petition Encl | 19 November 1992 | Advises of No Adequate Basis in 920519 Petition for Taking Action Requested.Director'S Decision DD-92-06 Responding to Petition Encl | |
DD-93-01, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-93-01 Expired.Commission Declined Any Review.Decision Became Final Agency Action on 930209.W/Certificate of Svc.Served on 930216 | 16 February 1993 | Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-93-01 Expired.Commission Declined Any Review.Decision Became Final Agency Action on 930209.W/Certificate of Svc.Served on 930216 | |