Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-85-442, Package of Operator Exam Results Summary Sheets18 July 1985Package of Operator Exam Results Summary Sheets
IA-86-445, Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 82013128 July 1986Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131Hydrostatic
ML19259C69924 July 1979Const Deficiency Rept on 790724:Westinghouse Informed Licensee That Seven Barton Steam Generator Level Transmitters Were from Lot That Failed Accuracy Test
ML19259C7243 August 1979Potential Const Deficiency Rept:Holes for Seal Mounting Bolt Exceeded Design Depth for Upper Personnel Air Lock.Repair Procedure Being Prepared by Designer,Wj Wooley Co.Rept Due 790904
ML19337A8924 September 1980Slide Presentation Entitled, Standby Shutdown Sys.
ML20058B5959 August 1993Rev 13 to MCC-1503.13-00-0440, USQ Evaluation for Deletion of Boronometer
ML20058N9419 September 1993Package Containing Listing of Employee Concerns Programs
ML20062H00224 November 1978Vendor Valcor Notified Plant That Control Valves Do Not Meet Spec for Insulation of Lead Wires to Solenoid That Operates Valve.Possible Replacement Will Be Determined for Approx 300 Valves Involved
ML20079N31911 November 1991Response to NUMARC Waste Mgt QuestionsLicense Renewal
ML20079N42325 July 1990Response to NUMARC Aquatic Resource QuestionsBoric Acid
Process Control Program
Eddy Current Testing
License Renewal
ML20129F4839 May 1985Package of Compilations of Results of Operator Licensing & Requalification Exams
ML20129J73030 September 1994Rev 13 to MCC-1227.00-00-0059, Locked Rotor & Single Rod Withdrawal Offsite Dose Analyses for Replacement Sg
ML20133L16710 October 1994Rev 4 to Calculation MCC-1227.00-00-0048, Dose Consequence Impact of Mark-BW Fuel Reload for Accidents Analyzed in Chapter 15 of McGuire FsarBoric Acid
ML20134L58118 July 1985Package of Operator Exam Results Summary Sheets
ML20140E29615 November 1996Rev 14 to MCC-1227.00-00-0064, Analysis of Consequences Following DBLOCA W/Vp in Operation in Mode 3 Following Sgr Outage
ML20203H28528 July 1986Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131Hydrostatic