ML20062H002
| ML20062H002 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 11/24/1978 |
| From: | DUKE POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7903230196 | |
| Download: ML20062H002 (1) | |
Text
l0 L'l G J r
~ ~
'19-O lstD-319 TELEPHONE REPORT
' = _ - -,
{
0-369)'
FACII.ITY:
$cCuire 1 & 2 DOCKET J:
IO D.tTE:
11/24/78 TLME:
4:05 pm LIC. OCC. #:
SC3JEcr:
Improper Insulation on Electrical Leads to Valcor Control Valves 1
L'r 4 he -r-nf.ed ahnne nn11 from Maleco Curtis (nA Mer Vendors) & W. H. Bradely Unef & Service) 704-373-4299 or (8321) 11/24/78 (nt ve.
~
~
DESC2I?IICF OF Cri m EE:
McGuire was notified by Valcor on Thanksgiving that
-the-control valves they produced for McGuire l&2 do not meet specification 8
_for insulation of the lead wires to the solenoid that operates the valve.
(
Determination will be made'if they need to be replaced. There are approximately 300 (totaf) such valves involved in both plants.
4Lw.cM# n/u/n
. 8 WMQf,$
M e
e9*
7903230 %.
e