Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 SiteStart dateEstimated NRC review hours
CAC:ME7522Diablo Canyon22 June 2015
CAC:MF3056Nine Mile Point23 November 2015
CAC:MF5293Catawba24 November 2014
CAC:MF5584Cooper4 May 2015
CAC:MF6065Salem3 April 2015
CAC:MF6363Oconee20 August 2015
CAC:MF6464McGuire9 July 2015
CAC:MF6768Hope Creek21 September 2015
CAC:MF7195Harris14 May 2015
CAC:MF8060Columbia28 June 2016
CAC:MF8118Callaway25 August 2016
CAC:MF9289Peach Bottom17 February 2017145 hours6.042 days <br />0.863 weeks <br />0.199 months <br />
CAC:MF9401Watts Bar20 April 2017360 hours15 days <br />2.143 weeks <br />0.493 months <br />
CAC:MF9491Calvert Cliffs28 March 2017200 hours8.333 days <br />1.19 weeks <br />0.274 months <br />
CAC:MF9544Robinson3 April 2017
CAC:MF9930Hope Creek31 December 2016840 hours35 days <br />5 weeks <br />1.151 months <br />
EPID:L-2017-LLA-0425Turkey Point21 December 2017730 hours30.417 days <br />4.345 weeks <br />1 months <br />
EPID:L-2017-LLS-0001Peach Bottom17 February 2017
EPID:L-2018-LLA-0186Hatch12 June 2019
EPID:L-2018-LLA-0203Harris30 July 2018720 hours30 days <br />4.286 weeks <br />0.986 months <br />
EPID:L-2019-LLA-0007Grand Gulf23 January 2019550 hours22.917 days <br />3.274 weeks <br />0.753 months <br />
EPID:L-2020-LLA-0044Sequoyah13 March 2020
EPID:L-2020-LLA-0262Harris3 December 2020
EPID:L-2021-LLA-0005Clinton20 January 2021
EPID:L-2022-LLA-0026Watts Bar17 February 2022
EPID:L-2023-LLA-0015Oconee
Mcguire
Catawba
Harris
Robinson
McGuire
1 February 2023
EPID:L-2023-LLA-0048Arkansas Nuclear30 March 2023
TAC:MD3462Cook16 January 2007
TAC:MD3992Diablo Canyon11 January 2007
TAC:MD4095Monticello14 November 2006
TAC:MD5249Technical Specifications Task Force24 May 2007
TAC:MD5531Monticello16 May 2007
TAC:MD6311Watts Bar26 November 2007
TAC:MD6561Comanche Peak31 July 2007
TAC:MD6864Monticello31 October 2007
TAC:MD7385Cooper19 November 2007
TAC:MD8111Vermont Yankee12 February 2008
TAC:MD8314Watts Bar1 February 2008
TAC:MD8387Point Beach1 May 2007
TAC:MD8950Duane Arnold30 May 2008
TAC:MD9990Monticello17 February 200896 hours4 days <br />0.571 weeks <br />0.132 months <br />
TAC:ME0933Susquehanna23 February 2009
TAC:ME1044Point Beach25 November 2008
TAC:ME1476Nine Mile Point31 March 2004
TAC:ME1749Mcguire
McGuire
23 April 2010
TAC:ME1872River Bend23 September 2009
TAC:ME2531Grand Gulf3 November 2009
TAC:ME3288LaSalle27 January 2010
TAC:ME3460Kewaunee27 August 2010
TAC:ME3589Limerick18 March 2010