EPID:L-2019-LLA-0007
From kanterella
Jump to navigation
Jump to search
EPID - L-2019-LLA-0007, TSTF-493, TSTF-505 (Approved, Closed) 23 January 2019 - 11 March 2020 | |
|---|---|
Initiation
Questions Answers | |
| From: | |
MONTHYEARGNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019
[table view]Title: Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation ML19053A7622019-02-22022 February 2019 Title: NRR E-mail Capture - Grand Gulf - Acceptance of the LAR Associated with Revising TS 3.3.1.1 (RPS Instrumentation) and TS 3.3.4.1 (EOC-RPT Instrumentation) GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-06-13013 June 2019 Title: Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation ML19339D1872020-01-0606 January 2020 Title: Issuance of Amendment No. 223, Revise Technical Specification (TS) 3.3.1.1,- Reactor Protection System (RPS) Instrumentation,- and TS 3.3.4.1,- End of Cycle Recirculation Pump Trip (EOC-RPT) ML19351E3762020-03-11011 March 2020 Title: Issuance of Amendment Nos. 241 and 204 Revise Technical Specification 6.8.4.g to Extend Containment Integrated Leak Rate Test Frequency (EPID L-2019-LLA-007 2019-06-13 | |