Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateSiteTitle
ML05320016921 November 2005Quad CitiesGeneral Electric Company Request for Withholding Information from Public Disclosure for Quad Cities
ML06031053330 May 2006Peach Bottom
Salem
Hope Creek
Order Approving Transfers of Licenses and Conforming Amendments Relating to Peach Bottom Atomic Power Station, Unit Nos. 2 and 3, Hope Creek Generating Station, and Salem Nuclear Generating Station, Unit Nos. 1 and 2
ML0604004729 August 2006Davis BesseLicense Amendment, Issuance of Amendment Safety Features Actuation System Instrumentation Setpoints and Surveillance Testing Requirements, MC3084
ML06052041928 June 2006Beaver Valley
Davis Besse
Perry
Correction to Conforming Amendments Dated December 16, 2005
ML06108012625 May 2006Davis BesseRequest for Additional Information Related to Tornado Missile Protection
ML06111035825 May 2006Davis BesseDB Withdrawal of an Amendment Request for OTSG Tube Inspections TAC No. MC7049
ML06116057730 June 2006PerryAmendment, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5
ML06117010319 May 2006Davis BesseWithdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2.1 to Permit a Single Inoperable Safety Features Actuation System (Sfas) Instrument String Function Unit to Be Placed in a Bypassed
ML06157026616 June 2006Beaver Valley
Davis Besse
Perry
Withholding from Public Disclosure, Proprietary Versions of Exhibits a & B to FENOC Letter L-06-071 Dated 05/30/2006, Containing Certain Financial Pro Forma Statements Anticipated Revenues from Sales
ML0615903553 July 2006Beaver ValleyNotice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring, and Opportunity for a Hearing
ML0615903883 July 2006Davis BesseNotice of Consideration of Approval for Application Regarding Proposed Corporate Restructuring and Opportunity for a Hearing
ML0615904183 July 2006PerryNotice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring, and Opportunity for a Hearing
ML0617801685 July 2006Davis BesseResponse to GL 2004-01 Requirements for Steam Generator Tube Inspections.
ML06187009630 June 2006PerryTechnical Specification, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5
ML0621505578 September 2006Davis BesseBulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations.
ML0622301989 August 2006PerryDraft Request for Additional Information, License Amendment Request to Increase Surveillance Testing Interval for Intermediate Range Monitor
ML0622805251 September 2006Davis BesseWithdrawal of an Amendment Request to Revise TS 3/4.8.1.1
ML0622806559 August 2006Davis BesseDraft Request for Additional Information Regarding the 2005 (Mid-Cycle 14) Steam Generator Tube Inspections
ML06241047015 September 2006Beaver Valley
Davis Besse
Perry
Firstenergy Nuclear Operating Company (FENOC) Request for Withholding Information from Public Disclosure for Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1 and Perry, Unit 1 - Fenco Letter 8-15-06
ML09212016411 August 2009PerryPM Reassignment Ltr
ML09212017511 August 2009ClintonPM Reassignment Ltr
ML09212018911 August 2009Davis BesseProject Manager Reassignment
ML09225044226 August 2009ClintonRequest for Relief from ASME Code 5-Year Test Interval for Safety Relief Valves
ML09230039424 August 2009ClintonProposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections
ML09230051427 August 2009BraidwoodRelief Request 13R-04 for Reactor Vessel Bottom Penetrations Examination
ML09230058720 August 2009ClintonRelief Request for Use of Subsequent Edition and Addenda or American Society of Mechanical Engineers Code for Inservice Testing
ML09257032121 September 2009LaSalleRelief Request CR-26, Inservice Inspection Program Relief Regarding Examination Coverage for the Second 10-Year Inservice Inspection Interval, MD9817 - MD9818
ML0926406908 October 2009PerryRelief Request, PR-3 for Third 10-Year Pump and Valve Inservice Testing Program, TAC ME0820
ML0928602592 February 2010Quad CitiesRelief, Alternative to Nozzle to Vessel Weld and Inner Radius Examinations
ML09289003222 October 2009PerrySafety Evaluation of Relief Requests for Perry Third 10-Year Pump and Valve Inservice Testing Program
ML0929404363 November 2009DresdenAlternative to Nozzle-to-Vessel Weld and Inner Radius Examinations
ML0930702715 November 2009BraidwoodRisk-Informed Relief Request 13R-01 for Certain Pressure Retaining Piping Welds
ML0934205833 June 2009Oyster CreekEmail from S. Campbell to T. Hipschman, Subj: FW: Oc Status., 6/2
ML1000501785 January 2010ClintonProject Manager Assignment
ML10008057321 January 2010Davis BesseUnit, Relief Request RR-A33 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping
ML10019044312 August 2010Watts BarSafety Evaluation Regarding Generic Letter 1995-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves
ML10021023128 January 2010ByronRelief Request 13R-16 for Reactor Pressure Vessel Head Penetration Examination Frequency
ML10027153129 January 2010Davis BesseRelief Request RR-A32 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping
ML1003216149 June 1982Indian PointStipulation & Agreement That Action Is Discontinued W/ Prejudice & Each Part Bear Own Costs Re Imposition of Civil Penalties
ML1004806998 March 2010BraidwoodRelief Request 12R-50 for Second 10-Year Inservice Inspection Interval
ML10053951530 June 2010Watts BarSafety Evaluation Regarding Bulletins Related to Reactor Pressure Vessel Head Inspections (Tac MD6709,MD6710, and MD6711)
ML10063072622 March 2010PerryProject Manager Reassignment
ML10088012621 April 2010ClintonRelief from the Requirements of the ASME Code
ML10119052711 May 2010BraidwoodRelief Request 13R-06 for Detailed Visual Examination During Appendix J Pnuematic Leakage Testing
ML10123017910 May 2010BraidwoodRelief Request I3R-03 for Examination of Structural Weld Overlays
ML10134069110 June 2010ClintonSafety Evaluation of Relief Request Nos. 2201, 2202, and 3201, for the Third 10-Year Inservice Testing Interval
ML10204001328 July 2010Watts BarStatus of Operating License Application Review
ML1020800174 August 2010Watts BarSafety Evaluation Regarding Bulletin 2004-01,Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors
ML10209001529 July 2010Watts BarSafety Evaluation of Relief Request PV-05 for the Third 10-Year Interval of the Inservice Testing Program
ML10236019130 August 2010Watts BarSafety Evaluation of Relief Request PV-02, Revision 1 for the Second 10-Year Interval of the Inservice Testing Program (Tac No. ME4204)