Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML053200169 | 21 November 2005 | Quad Cities | General Electric Company Request for Withholding Information from Public Disclosure for Quad Cities |
ML060310533 | 30 May 2006 | Peach Bottom Salem Hope Creek | Order Approving Transfers of Licenses and Conforming Amendments Relating to Peach Bottom Atomic Power Station, Unit Nos. 2 and 3, Hope Creek Generating Station, and Salem Nuclear Generating Station, Unit Nos. 1 and 2 |
ML060400472 | 9 August 2006 | Davis Besse | License Amendment, Issuance of Amendment Safety Features Actuation System Instrumentation Setpoints and Surveillance Testing Requirements, MC3084 |
ML060520419 | 28 June 2006 | Beaver Valley Davis Besse Perry | Correction to Conforming Amendments Dated December 16, 2005 |
ML061080126 | 25 May 2006 | Davis Besse | Request for Additional Information Related to Tornado Missile Protection |
ML061110358 | 25 May 2006 | Davis Besse | DB Withdrawal of an Amendment Request for OTSG Tube Inspections TAC No. MC7049 |
ML061160577 | 30 June 2006 | Perry | Amendment, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5 |
ML061170103 | 19 May 2006 | Davis Besse | Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2.1 to Permit a Single Inoperable Safety Features Actuation System (Sfas) Instrument String Function Unit to Be Placed in a Bypassed |
ML061570266 | 16 June 2006 | Beaver Valley Davis Besse Perry | Withholding from Public Disclosure, Proprietary Versions of Exhibits a & B to FENOC Letter L-06-071 Dated 05/30/2006, Containing Certain Financial Pro Forma Statements Anticipated Revenues from Sales |
ML061590355 | 3 July 2006 | Beaver Valley | Notice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring, and Opportunity for a Hearing |
ML061590388 | 3 July 2006 | Davis Besse | Notice of Consideration of Approval for Application Regarding Proposed Corporate Restructuring and Opportunity for a Hearing |
ML061590418 | 3 July 2006 | Perry | Notice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring, and Opportunity for a Hearing |
ML061780168 | 5 July 2006 | Davis Besse | Response to GL 2004-01 Requirements for Steam Generator Tube Inspections. |
ML061870096 | 30 June 2006 | Perry | Technical Specification, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5 |
ML062150557 | 8 September 2006 | Davis Besse | Bulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations. |
ML062230198 | 9 August 2006 | Perry | Draft Request for Additional Information, License Amendment Request to Increase Surveillance Testing Interval for Intermediate Range Monitor |
ML062280525 | 1 September 2006 | Davis Besse | Withdrawal of an Amendment Request to Revise TS 3/4.8.1.1 |
ML062280655 | 9 August 2006 | Davis Besse | Draft Request for Additional Information Regarding the 2005 (Mid-Cycle 14) Steam Generator Tube Inspections |
ML062410470 | 15 September 2006 | Beaver Valley Davis Besse Perry | Firstenergy Nuclear Operating Company (FENOC) Request for Withholding Information from Public Disclosure for Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1 and Perry, Unit 1 - Fenco Letter 8-15-06 |
ML092120164 | 11 August 2009 | Perry | PM Reassignment Ltr |
ML092120175 | 11 August 2009 | Clinton | PM Reassignment Ltr |
ML092120189 | 11 August 2009 | Davis Besse | Project Manager Reassignment |
ML092250442 | 26 August 2009 | Clinton | Request for Relief from ASME Code 5-Year Test Interval for Safety Relief Valves |
ML092300394 | 24 August 2009 | Clinton | Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections |
ML092300514 | 27 August 2009 | Braidwood | Relief Request 13R-04 for Reactor Vessel Bottom Penetrations Examination |
ML092300587 | 20 August 2009 | Clinton | Relief Request for Use of Subsequent Edition and Addenda or American Society of Mechanical Engineers Code for Inservice Testing |
ML092570321 | 21 September 2009 | LaSalle | Relief Request CR-26, Inservice Inspection Program Relief Regarding Examination Coverage for the Second 10-Year Inservice Inspection Interval, MD9817 - MD9818 |
ML092640690 | 8 October 2009 | Perry | Relief Request, PR-3 for Third 10-Year Pump and Valve Inservice Testing Program, TAC ME0820 |
ML092860259 | 2 February 2010 | Quad Cities | Relief, Alternative to Nozzle to Vessel Weld and Inner Radius Examinations |
ML092890032 | 22 October 2009 | Perry | Safety Evaluation of Relief Requests for Perry Third 10-Year Pump and Valve Inservice Testing Program |
ML092940436 | 3 November 2009 | Dresden | Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations |
ML093070271 | 5 November 2009 | Braidwood | Risk-Informed Relief Request 13R-01 for Certain Pressure Retaining Piping Welds |
ML093420583 | 3 June 2009 | Oyster Creek | Email from S. Campbell to T. Hipschman, Subj: FW: Oc Status., 6/2 |
ML100050178 | 5 January 2010 | Clinton | Project Manager Assignment |
ML100080573 | 21 January 2010 | Davis Besse | Unit, Relief Request RR-A33 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping |
ML100190443 | 12 August 2010 | Watts Bar | Safety Evaluation Regarding Generic Letter 1995-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves |
ML100210231 | 28 January 2010 | Byron | Relief Request 13R-16 for Reactor Pressure Vessel Head Penetration Examination Frequency |
ML100271531 | 29 January 2010 | Davis Besse | Relief Request RR-A32 for the Application of Full Structural Weld Overlays on Dissimilar Metal Welds of Reactor Coolant Piping |
ML100321614 | 9 June 1982 | Indian Point | Stipulation & Agreement That Action Is Discontinued W/ Prejudice & Each Part Bear Own Costs Re Imposition of Civil Penalties |
ML100480699 | 8 March 2010 | Braidwood | Relief Request 12R-50 for Second 10-Year Inservice Inspection Interval |
ML100539515 | 30 June 2010 | Watts Bar | Safety Evaluation Regarding Bulletins Related to Reactor Pressure Vessel Head Inspections (Tac MD6709,MD6710, and MD6711) |
ML100630726 | 22 March 2010 | Perry | Project Manager Reassignment |
ML100880126 | 21 April 2010 | Clinton | Relief from the Requirements of the ASME Code |
ML101190527 | 11 May 2010 | Braidwood | Relief Request 13R-06 for Detailed Visual Examination During Appendix J Pnuematic Leakage Testing |
ML101230179 | 10 May 2010 | Braidwood | Relief Request I3R-03 for Examination of Structural Weld Overlays |
ML101340691 | 10 June 2010 | Clinton | Safety Evaluation of Relief Request Nos. 2201, 2202, and 3201, for the Third 10-Year Inservice Testing Interval |
ML102040013 | 28 July 2010 | Watts Bar | Status of Operating License Application Review |
ML102080017 | 4 August 2010 | Watts Bar | Safety Evaluation Regarding Bulletin 2004-01,Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors |
ML102090015 | 29 July 2010 | Watts Bar | Safety Evaluation of Relief Request PV-05 for the Third 10-Year Interval of the Inservice Testing Program |
ML102360191 | 30 August 2010 | Watts Bar | Safety Evaluation of Relief Request PV-02, Revision 1 for the Second 10-Year Interval of the Inservice Testing Program (Tac No. ME4204) |