Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20027A80630 June 1982SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLYImprovements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation ReptRequest
ML20039D37730 December 1981Duke Energy
Mardis D
Forwards Design Details of Mods Re TMI Action Plan Items II.B.3,II.F.1.1,II.F.1.2,II.F.1.4,II.F.1.5 & II.F.1.6,per NRC 801031 Ltr.Mods Meet All Technical RequirementsRequest
ML20042A52617 March 1982Duke Energy
Mardis D
Requests Further Extension Until 820630 to Complete Ongoing Review of Fire Protection Program Based on Justification Presented.Notification of Concurrence Requested by 820330Request
ML20054C28814 April 1982Duke Energy
Mardis D
Forwards Updated Completion Schedule,In Response to 820317 Request,For NUREG-0737 Items I.A.3.1,II.B.2,II.B.3,II.B.4, II.E.1.2,II.E.4.2,II.F.1 & II.K.2.10Request
ML20054G69418 June 1982Duke Energy
Baynard P
Informs of Delay in Completing Installation of Emergency Feedwater Initiation & Control Sys by Spring 1982.Equipment Procurement Not Proceeding at Rate to Assure Scheduled & Safe InstallationOther
ML20054L17730 June 1982Duke Energy
Mardis D
Provides Addl Clarification in Response to NRC Re Status of NUREG-0737,Items II.B.2,II.B.3 & II.F.1.1-6. Analysis to Support Redesign of Refuel III Scheduled for Completion by 820930Other
ML20065B0398 September 1982Duke Energy
Hancock J
Clarifies Completion Schedule & Restates Compensatory Measures for NUREG-0737,Items II.B.2,II.B.3,II.E.1.2, II.F16.1-6.Item II.E.1.2 Completed During Refuel V.Other Items Completed During Refuel IVOther
ML20071L99517 September 1982Duke Energy
Hancock J
Submits Revised Completion Schedules for NUREG-0737,Items I.C.1,II.D.1.2,II.D.1.3,II.K.3.30,II.K.3.31,III.A.1.2 & III.A.2.2Other