Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
CNL-21-016, License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05) | 2 March 2021 | Tennessee Valley Authority Polickoski J | License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05) | Request |
DCL-21-020, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance | 29 March 2021 | Pacific Gas & Electric Gerfen P | Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance | Request |
LR-N21-0036, LR-N21-0036 LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 28 April 2021 | PSEG Sharbaugh D | LR-N21-0036 LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Other |
ML21048A324 | 17 February 2021 | Exelon David Helker | License Amendment Request for Application to Revise Technical Specifications to Adopt TSTF-205 -A Revision of Calibration, Channel Functional Test, and Related Definitions | Request |
ML21089A058 | 30 March 2021 | Michael Mahoney NRC/NRR/DORL/LPL2-2 | NRR E-mail Capture - Acceptance Review - Watts Bar Nuclear Plant, Unit 2 - CNL-21-016 - LAR to Revise TS to Change SG Secondary Side Water Level to Accommodate RSGs (L-2021-LLA-0032) | Acceptance Review |
ML21104A162 | 14 April 2021 | PSEG Nuclear Environmental Affairs Cary R | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Reports: Atlantic Sturgeon 04/13/2021 | Request |
ML21105A033 | 8 March 2021 | Dairyland Power Cooperative Ridge B | ISFSI Emergency Plan License Amendment Request - Public | Request |
ML21119A141 | 29 April 2021 | Exelon David Helker | License Amendment Request, Revise Technical Specifications Administrative Controls Section 5.5.7 Regarding the Frequency for Performing Certain Ventilation Filter Testing | Request |
ML21144A074 | 24 May 2021 | Michael Mahoney NRC/NRR/DORL/LPL2-2 | NRR E-mail Capture - Watts Bar Nuclear Plant, Unit 2 - Audit Plan for SG Water Level Change LAR | Approval |
ML21217A222 | 13 August 2021 | Michael Mahoney Plant Licensing Branch II | Regulatory Audit Summary Related to Request to Revise Technical Specifications to Change the Steam Generator Water Level | Other |
ML21252A091 | 9 September 2021 | Michael Mahoney NRC/NRR/DORL/LPL2-2 | NRR E-mail Capture - Request for Comments on Proposed Issuance of Amendments to Watts Bar Nuclear Plant, Unit 2 - Revise Steam Generator Secondary Side Water Level | Approval |
ML21260A210 | 22 November 2021 | Michael Mahoney Plant Licensing Branch II | Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level | Approval |
RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications | 24 February 2021 | Duke Energy Maza K | License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications | Request |
RA-21-0052, License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency | 24 March 2021 | Duke Energy Maza K | License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency | Request |
RS-21-007, Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev.1 and NSAL-15-1, Rev. 0 | 7 April 2021 | Exelon David Gudger | Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev.1 and NSAL-15-1, Rev. 0 | Request |
WBL-21-020, Annual Non-Radiological Environmental Operating Report - 2020 | 20 April 2021 | Tennessee Valley Authority Anthony Williams | Annual Non-Radiological Environmental Operating Report - 2020 | Request |