ML21144A074

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Watts Bar Nuclear Plant, Unit 2 - Audit Plan for SG Water Level Change LAR
ML21144A074
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/24/2021
From: Michael Mahoney
NRC/NRR/DORL/LPL2-2
To: Wells R
Tennessee Valley Authority
References
L-2021-LLA-0032
Download: ML21144A074 (5)


Text

From: Mahoney, Michael Sent: Monday, May 24, 2021 9:19 AM To: rdwells0@tva.gov Cc: Green, Kimberly

Subject:

Watts Bar Nuclear Plant, Unit 1 and 2 - Audit Plan For SG Water Level Change LAR (EPID L-2021-LLA-0032)

Attachments: Audit Plan_Watts Bar 2 - SG Water Level Change (L-2021-LLA-0032).pdf

Dear Mr. Wells,

By letter CNL-21-016, dated March 2, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21061A347), Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) to revise the Watts Bar Nuclear Plant, Unit 2, Technical Specifications, to change the steam generator (SG) water level requirement in TS Limiting Condition for Operation (LCO) 3.4.7.b, RCS Loops - MODE 5, Loops Filled, and Surveillance Requirements (SR) 3.4.5.2, RCS Loops - MODE 3, SR 3.4.6.3, RCS Loops - MODE 4, and SR 3.4.7.2 from greater than or equal to () 6% to 32%.

The US Nuclear Regulatory Commission staff is reviewing the proposed amendment and has determined that a regulatory audit is necessary to complete its review.

Attached, please find an audit plan containing the basis, scope, NRC staff, and logistics, for the audit.

If you have any questions, please let me know.

Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Desk: (301)-415-3867 Mobile: (301)-250-0450 Email: Michael.Mahoney@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 1202 Mail Envelope Properties (BLAPR09MB6017FC6F49976805780F190CE5269)

Subject:

Watts Bar Nuclear Plant, Unit 1 and 2 - Audit Plan For SG Water Level Change LAR (EPID L-2021-LLA-0032)

Sent Date: 5/24/2021 9:19:07 AM Received Date: 5/24/2021 9:19:00 AM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients:

"Green, Kimberly" <Kimberly.Green@nrc.gov>

Tracking Status: None "rdwells0@tva.gov" <rdwells0@tva.gov>

Tracking Status: None Post Office: BLAPR09MB6017.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1162 5/24/2021 9:19:00 AM Audit Plan_Watts Bar 2 - SG Water Level Change (L-2021-LLA-0032).pdf 122363 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

REGULATORY AUDIT PLAN REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO CHANGE THE STEAM GENERATOR WATER LEVEL TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-391 EPID NO. L-2021-LLA-0032

1.0 BACKGROUND

By application dated March 2, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21061A347), the Tennessee Valley Authority (TVA; the licensee) submitted a license amendment request (LAR) for Watts Bar Nuclear Plant (Watts Bar), Unit 2.

The proposed amendment would amend the Watts Bar, Unit 2 Technical Specifications (TS) to change the steam generator (SG) water level requirement in Watts Bar, Unit 2 TS Limiting Condition for Operation (LCO) 3.4.7.b, RCS Loops - MODE 5, Loops Filled and Surveillance Requirements (SR) 3.4.5.2, RCS Loops - MODE 3, SR 3.4.6.3, RCS Loops - MODE 4, and SR 3.4.7.2 from greater than or equal to ( ) 6 percent (%) to 32%. The proposed change is needed to support the Watts Bar, Unit 2 Replacement SG (RSG) project.

The application references several analyses or documents that are not provided as part of the application or are not provided in the reference section. In order to confirm that the analyses and references support the requested licensing action, the staff of the U.S. Nuclear Regulatory Commission (NRC) plan to perform an audit of the listed documents in the Information Request section below. The NRC staff is continuing to review other aspects of the licensees submittal and may identify the need for additional audit subjects by separate correspondence.

2.0 REGULATORY AUDIT BASIS An audit was determined to be the most efficient approach toward a timely resolution of questions associated with this LAR review, because the NRC staff will have an opportunity to minimize the potential for further rounds of RAIs and ensure no unnecessary burden will be imposed by requiring the licensee to address issues that are no longer necessary to make a safety determination. The NRC staff is requesting an initial set of internal licensee information to be reviewed by the staff using an online electronic reading room. Upon completion of this audit, the NRC staff is expected to achieve the following.

1. Confirm internal licensee information which supports statements made in the LAR.
2. Determine whether the information included in the documents is necessary to be submitted to support a safety conclusion.

The audit information the NRC staff determines to be necessary to support the development of the NRC staffs safety evaluation will be requested to be submitted on the docket.

3.0 REGULATORY AUDIT SCOPE AND METHOD The audit is being conducted to confirm that the analyses and information identified below support the requested licensing action. The audit will be conducted as a desk audit (with teleconferences with the licensee, as needed), to review information made available on an online electronic reading room. The specific areas of focus for the regulatory audit are identified in the information request section, below.

4.0 INFORMATION REQUEST Please provide the following documents (via an online electronic reading room) for the staff to audit:

1. Drawings of the replacement steam generator (RSG) w/dimensions showing location of level taps and top of tubes.
2. The demonstrated accuracy calculation discussed in Section 3.3 of the LAR and any other calculations used to determine the 32% value.
3. Calculation(s) related to control rod withdrawal from subcritical that demonstrate appropriate acceptance criteria are met when the RSG water level is at 32% narrow range level.
4. Given the large change (6% to 32%) to the narrow range level in the proposed LAR, explain why the reactor trip on SG water level low-low setpoint doesnt change (Function 13 in Table 3.3.1-1 of TS, nominal trip setpoint 17% of narrow range span).

5.0 AUDIT TEAM The following are members of the NRC audit team:

x Michael Mahoney, Project Manager, NRR/DORL (Michael.Mahoney@nrc.gov) x Robert Beaton, Nuclear Engineer, NRR/DSS (Robert.Beaton@nrc.gov) x Norbert Carte, Senior Electronics Engineer, NRR/DEX (Norbert.Carte@nrc.gov)

Key licensee personnel involved in the development of the LAR should be made available for interactions on a mutually agreeable schedule to respond to any questions from the NRC staff.

6.0 LOGISTICS The audit will be conducted via electronic reading room, which is requested to be open from June 1 to 30, 2021.

An entrance call will be conducted as soon as practicable toward the beginning of the audit.

The electronic reading room or portal should employ measures to prevent the downloading, copying, or otherwise storing of any online portal documents by the NRC staff accessing the portal.

As necessary, clarification calls will be requested regarding the documents under audit.

7.0 DELIVERABLES The NRC team will develop an audit summary report to convey the results. The report will be placed in ADAMS within 90 days of the completion of the final audit session. The audit information the NRC staff determines to be necessary to support the development of the NRC staffs safety evaluation will be requested to be submitted on the docket.