Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20308A6566 November 2020Michelle Honcharik
NRC/NRR/DSS/STSB
Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube InspectionsRAI
ML21068A35924 March 2021Victor Cusumano
NRC/NRR/DSS/STSB
Draft Traveler SE of TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsDraft Other
ML21068A40124 March 2021Victor Cusumano
NRC/NRR/DSS/STSB
Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsDraft Approval
ML21069A17224 March 2021Victor Cusumano
NRC/NRR/DSS/STSB
Draft Model SE of TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsDraft Other
ML21096A27414 April 2021Victor Cusumano
NRC/NRR/DSS/STSB
Final Model SE of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsOther
ML21097A18730 March 2021Mann B
Excel Services Corp
Email: TSTF Review of Draft Safety Evaluations for TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube InspectionsDraft Other
ML21098A18814 April 2021Victor Cusumano
NRC/NRR/DSS/STSB
Final SE of Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsApproval
ML21098A24214 April 2021Victor Cusumano
NRC/NRR/DSS/STSB
Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsApproval
TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections8 June 2020Technical Specifications Task Force
Joyce R
Miksa J
Vaughan J
Demetrius Murray
Sparkman W
Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube InspectionsRequest