Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
GO2-84-304, Forwards WNP-2 Licensed Operator Requalification Program Description15 May 1984Forwards WNP-2 Licensed Operator Requalification Program Description
GO2-84-385, Requests Extension to 840622 to Respond to Notice of Violation from IE Insp Rept 50-397/84-11 to Complete Internal Review of Violation11 June 1984Requests Extension to 840622 to Respond to Notice of Violation from IE Insp Rept 50-397/84-11 to Complete Internal Review of Violation
GO2-84-424, Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Plant Maint Procedure for Relay Coil Replacement & Contact Adjustment Revised to Prohibit Use of Hfa 51 Relays10 July 1984Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Plant Maint Procedure for Relay Coil Replacement & Contact Adjustment Revised to Prohibit Use of Hfa 51 Relays
GO2-84-426, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-09.Corrective Actions:Air Lock Door Relocked, Air Lock Repaired & Plant Removed from Tech Spec Action Statement 3.6.1.3.9.112 July 1984Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-09.Corrective Actions:Air Lock Door Relocked, Air Lock Repaired & Plant Removed from Tech Spec Action Statement 3.6.1.3.9.1Test box
Scram Discharge Volume
Fire Protection Program
GO2-84-433, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-13.Corrective Actions:Specific Instructions Provided to Operating Crews to Ensure Airlock Operation Performed Per Regulatory Requirements26 July 1984Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-13.Corrective Actions:Specific Instructions Provided to Operating Crews to Ensure Airlock Operation Performed Per Regulatory Requirements
GO2-84-476, Responds to NRC Re Observations Noted in Insp Rept 50-397/84-15.Corrective Actions:Nonessential Activity in Control Room Limited,Personnel Counseled Re Adherence to Procedures & log-keeping Procedure Revised23 August 1984Responds to NRC Re Observations Noted in Insp Rept 50-397/84-15.Corrective Actions:Nonessential Activity in Control Room Limited,Personnel Counseled Re Adherence to Procedures & log-keeping Procedure Revised
GO2-84-480, Forwards Table of Contents & Apps Inadvertently Omitted from Rev 3 to Guard Training & Qualification Plan,Submitted on 840515.Encls Withheld24 August 1984Forwards Table of Contents & Apps Inadvertently Omitted from Rev 3 to Guard Training & Qualification Plan,Submitted on 840515.Encls Withheld
GO2-84-623, Responds to IE Bulletin 84-03, Refueling Cavity Water Seal. Gross Seal Failure Not Expected Because Critical Components Welded or Bolted in Place.Seven Methods Identified to Move Makeup Water to Fuel Pool & Reactor Well30 November 1984Responds to IE Bulletin 84-03, Refueling Cavity Water Seal. Gross Seal Failure Not Expected Because Critical Components Welded or Bolted in Place.Seven Methods Identified to Move Makeup Water to Fuel Pool & Reactor WellTime to boil
Fuel cladding
Scaffolding
GO2-84-624, Responds to IE Bulletin 84-03 Re Refueling Cavity Water Seal.Summary Rept Addressing Potential for & Consequences of Refueling Cavity Water Seal Failure Incident Encl30 November 1984Responds to IE Bulletin 84-03 Re Refueling Cavity Water Seal.Summary Rept Addressing Potential for & Consequences of Refueling Cavity Water Seal Failure Incident EnclTime to boil
Fuel cladding
Scaffolding
GO2-85-207, Forwards Response to Notice of Violation Contained in NRC .Corrective Actions:Diesel Generator Abnormal, Operating & Surveillance Procedures Changed to Include Addl Statement Re Adjustment to Rated Voltage17 April 1985Forwards Response to Notice of Violation Contained in NRC .Corrective Actions:Diesel Generator Abnormal, Operating & Surveillance Procedures Changed to Include Addl Statement Re Adjustment to Rated VoltageUnanalyzed Condition
GO2-85-294, Forwards Annual Emergency Exercise 1985, Providing Objectives & Limitations as 75-day Submittal to Annual Exercise Program.Remaining 45-day Submittal Will Contain Detailed Description of Exercise Scenario5 June 1985Forwards Annual Emergency Exercise 1985, Providing Objectives & Limitations as 75-day Submittal to Annual Exercise Program.Remaining 45-day Submittal Will Contain Detailed Description of Exercise Scenario
GO2-85-409, Responds to Concerns Identified in 850702 Telcon Re Graphic Display Sys & Emergency Dose Protection Sys.Alternative Means of Differentiating Real & Test Data Being Explored. Plant Computer Updated to Improve Response Time2 August 1985Responds to Concerns Identified in 850702 Telcon Re Graphic Display Sys & Emergency Dose Protection Sys.Alternative Means of Differentiating Real & Test Data Being Explored. Plant Computer Updated to Improve Response Time
GO2-86-068, Forwards 1986 Emergency Exercise Representing Complete Scenario Package.W/O Encl24 July 1986Forwards 1986 Emergency Exercise Representing Complete Scenario Package.W/O Encl
GO2-86-069, Discusses Spent Fuel Pool Cooling Sys Identified in Deficiency Rept.Standby Svc Water Connection to Normal Cooling Supply of Fuel Pool Cooling HX Will Be Temporarily Disconnected Until Mods Effected29 July 1986Discusses Spent Fuel Pool Cooling Sys Identified in Deficiency Rept.Standby Svc Water Connection to Normal Cooling Supply of Fuel Pool Cooling HX Will Be Temporarily Disconnected Until Mods Effected
GO2-86-093, Forwards Page Change to Rev 5 of Guard Training & Qualification Plan.Plan Withheld (Ref 10CFR73.21)26 September 1986Forwards Page Change to Rev 5 of Guard Training & Qualification Plan.Plan Withheld (Ref 10CFR73.21)
GO2-86-097, Responds to IE Bulletin 86-003 Re Potential Failure of Multiple ECCS Pumps.Each RHR Sys Has Separate Min Flow Valve & Return Line.Hpcs & Lcps Sys Also Have Separate Min Flow Recirculation Lines27 October 1986Responds to IE Bulletin 86-003 Re Potential Failure of Multiple ECCS Pumps.Each RHR Sys Has Separate Min Flow Valve & Return Line.Hpcs & Lcps Sys Also Have Separate Min Flow Recirculation Lines
GO2-86-101, Forwards 60-day Rept Per IE Bulletin 86-002 Re Static O-Ring (Sor) Differential Pressure Switches.Tests of Four Sor Switches Indicate That Instruments Exhibit well-defined Repeatable Shifts & No Further Special Testing Necessary7 November 1986Forwards 60-day Rept Per IE Bulletin 86-002 Re Static O-Ring (Sor) Differential Pressure Switches.Tests of Four Sor Switches Indicate That Instruments Exhibit well-defined Repeatable Shifts & No Further Special Testing Necessary
GO2-86-105, Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF86A,Spring 1986 & Rev 3 to NDE & I Instruction Qci 6-4, Ultrasonic Exam BWR Nozzle Inner Radius4 December 1986Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF86A,Spring 1986 & Rev 3 to NDE & I Instruction Qci 6-4, Ultrasonic Exam BWR Nozzle Inner Radius
GO2-86-218, Confirms Commitments Made During 860306 Conference Call Re Evacuation Warning in High Noise Areas.Alerting Devices & Strobe Light/Siren Sys Will Be Installed by 860917,as First Phase of Acoustic Study14 March 1986Confirms Commitments Made During 860306 Conference Call Re Evacuation Warning in High Noise Areas.Alerting Devices & Strobe Light/Siren Sys Will Be Installed by 860917,as First Phase of Acoustic StudyHigh Radiation Area
GO2-86-221, Responds to NRC Re Allegation Noted in Insp Rept 50-397/86-02.Corrective Actions:Plant Mgt Meeting Will Be Held to Heighten ALARA Awareness & Addl ALARA Coordinators Assigned to Cover Annual Plant Outage Work Tasks14 March 1986Responds to NRC Re Allegation Noted in Insp Rept 50-397/86-02.Corrective Actions:Plant Mgt Meeting Will Be Held to Heighten ALARA Awareness & Addl ALARA Coordinators Assigned to Cover Annual Plant Outage Work TasksScaffolding
GO2-86-223, Forwards Request for Amend to License NPF-21,revising Physical Security Plan.Request Withheld (Ref 10CFR73.21). Fee Paid20 March 1986Forwards Request for Amend to License NPF-21,revising Physical Security Plan.Request Withheld (Ref 10CFR73.21). Fee Paid
GO2-86-244, Notifies That Plan 55 Will Be Used in Upcoming Refueling Outage for Snubber Testing,In Accordance W/Tech Spec 3/4.7.4.e.319 March 1986Notifies That Plan 55 Will Be Used in Upcoming Refueling Outage for Snubber Testing,In Accordance W/Tech Spec 3/4.7.4.e.3
GO2-86-388, Informs That Visual Exam of Core Spray Spargers Performed During Apr 1986 Refueling Outage,Per Requirements of IE Bulletin 80-13, Cracking in Core Spray Spargers. No Cracking or Other Relevant Conditions Observed1 May 1986Informs That Visual Exam of Core Spray Spargers Performed During Apr 1986 Refueling Outage,Per Requirements of IE Bulletin 80-13, Cracking in Core Spray Spargers. No Cracking or Other Relevant Conditions Observed
GO2-86-418, Responds to NRC Re Violations Noted in Insp Rept 50-397/86-05 & 860415 Enforcement Conference.Corrective Actions:Sample of Changes Made to Fire Protection Items Cross Checked9 May 1986Responds to NRC Re Violations Noted in Insp Rept 50-397/86-05 & 860415 Enforcement Conference.Corrective Actions:Sample of Changes Made to Fire Protection Items Cross CheckedSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
Backfit
GO2-86-493, Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Info Encl Satisfies Items a-e of Bulletin1 October 1986Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Info Encl Satisfies Items a-e of BulletinAnchor Darling
GO2-86-503, Discusses IE Bulletin 85-003.Response Deferred Until 860528,per Determination That Participation in BWR Owners Group Program Warranted.Addl Submittals Will Be Made Re BWR Owners Group Final Rept Scheduled for Sept 198628 May 1986Discusses IE Bulletin 85-003.Response Deferred Until 860528,per Determination That Participation in BWR Owners Group Program Warranted.Addl Submittals Will Be Made Re BWR Owners Group Final Rept Scheduled for Sept 1986
GO2-86-512, Responds to IE Bulletin 86-001 Re Min Flow Logic That Could Disable RHR Pumps.Since No Control cross-connect Exists Between RHR & Valves,Issue Not of Concern for Facility.No Instructions to Shifts or Corrective Actions Needed30 May 1986Responds to IE Bulletin 86-001 Re Min Flow Logic That Could Disable RHR Pumps.Since No Control cross-connect Exists Between RHR & Valves,Issue Not of Concern for Facility.No Instructions to Shifts or Corrective Actions Needed
GO2-86-645, Responds to Equipment Qualification Audit/Insp NRC-IR-86-12 on 860428-0502.Corrective Actions:Ler Re safety-related Motor Operators Being Prepared & Exam & Corrective Action Completed on 147 safety-related Limitorque Motor Operators10 July 1986Responds to Equipment Qualification Audit/Insp NRC-IR-86-12 on 860428-0502.Corrective Actions:Ler Re safety-related Motor Operators Being Prepared & Exam & Corrective Action Completed on 147 safety-related Limitorque Motor Operators
GO2-86-696, Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant29 July 1986Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant
GO2-86-697, Informs That Commitment to Upgrade 1 H Cable Tray Fire Barrier Installation for Safe Shutdown Equipment Cables to 3 H Fire Barrier Capability by Jul 1986 Delayed Until 86082529 July 1986Informs That Commitment to Upgrade 1 H Cable Tray Fire Barrier Installation for Safe Shutdown Equipment Cables to 3 H Fire Barrier Capability by Jul 1986 Delayed Until 860825Safe Shutdown
Fire Barrier
Hourly Fire Watch
GO2-86-811, Responds to NRC Re Violations Noted in Insp Rept 50-397/86-23.Corrective Actions:All Controlled Vacuum Cleaners Removed from Svc & Placed in Controlled Storage as of 860701 & Will Not Be Used Until Actions Completed20 August 1986Responds to NRC Re Violations Noted in Insp Rept 50-397/86-23.Corrective Actions:All Controlled Vacuum Cleaners Removed from Svc & Placed in Controlled Storage as of 860701 & Will Not Be Used Until Actions Completed
GO2-86-943, Forwards Info in Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, Items a-e,per Util 860528 & BWR Owners Group s1 October 1986Forwards Info in Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, Items a-e,per Util 860528 & BWR Owners Group sAnchor Darling
GO2-87-000, Informs That Due to Listed Difficulties,Comprehensive Reevaluation of Fire Protection Program Will Not Be Available as Scheduled.Ebasco Svcs,Inc Retained as Consultant for Review.Final Rept Anticipated by 8702272 January 1987Informs That Due to Listed Difficulties,Comprehensive Reevaluation of Fire Protection Program Will Not Be Available as Scheduled.Ebasco Svcs,Inc Retained as Consultant for Review.Final Rept Anticipated by 870227Fire Protection Program
GO2-87-005, Notifies That Addl Sealed Neutron Sources Will Be Transferred from Units 1 & 3/5 to Unit 2 for Storage. Applicable Portions of 10CFR70 Will Be Applied in Transfer13 February 1987Notifies That Addl Sealed Neutron Sources Will Be Transferred from Units 1 & 3/5 to Unit 2 for Storage. Applicable Portions of 10CFR70 Will Be Applied in Transfer
GO2-87-020, Forwards WNP-2 Annual Emergency Exercise 1987 Objectives & Limitations as First Submittal to Annual Exercise Program. Remaining Submittal Will Contain Detailed Description of Exercise Scenario & Anticipated Actions17 June 1987Forwards WNP-2 Annual Emergency Exercise 1987 Objectives & Limitations as First Submittal to Annual Exercise Program. Remaining Submittal Will Contain Detailed Description of Exercise Scenario & Anticipated Actions
GO2-87-084, Advises That Copies of Jd Martin 841018 & s to JB Martin,Nrc,Being Sent Under Separate Cover to Jo Bradfute Per Request12 March 1987Advises That Copies of Jd Martin 841018 & s to JB Martin,Nrc,Being Sent Under Separate Cover to Jo Bradfute Per Request
GO2-88-052, Reiterates Commitments Made in 880301 Meeting in Walnut Creek,Ca & Provides Results of Util Reactor Bldg Response Analysis & Operability Verification Program Per Gw Knighton Request5 March 1988Reiterates Commitments Made in 880301 Meeting in Walnut Creek,Ca & Provides Results of Util Reactor Bldg Response Analysis & Operability Verification Program Per Gw Knighton Request
GO2-88-078, Forwards Rev 6 to Facility Guard Training & Qualification Plan.Rev Describes Changes Made as Result of in-depth Supervisory Job/Task Analysis & Other Administrative & Procedural Changes.Rev Withheld (10CFR73.21)4 April 1988Forwards Rev 6 to Facility Guard Training & Qualification Plan.Rev Describes Changes Made as Result of in-depth Supervisory Job/Task Analysis & Other Administrative & Procedural Changes.Rev Withheld (10CFR73.21)
GO2-88-095, Advises That Plan 37 Described in Tech Spec 3/4.7.4 Will Be Used in Refueling Outage for Snubber Testing22 April 1988Advises That Plan 37 Described in Tech Spec 3/4.7.4 Will Be Used in Refueling Outage for Snubber Testing
GO2-89-108, Forwards Rev 14 to Plant Physical Security Plan.Rev Withheld (Ref 10CFR73.21)15 June 1989Forwards Rev 14 to Plant Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
GO2-89-131, Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld31 July 1989Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld
GO2-89-142, Forwards Rev 7 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)15 August 1989Forwards Rev 7 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)
GO2-90-195, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld28 November 1990Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld
GO2-91-008, Forwards Rev 8 to Guard Training & Qualification Plan.Rev Withheld17 January 1991Forwards Rev 8 to Guard Training & Qualification Plan.Rev Withheld
GO2-91-070, Forwards Rev 18 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)10 April 1991Forwards Rev 18 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
GO2-91-130, Forwards Rev 19 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)8 July 1991Forwards Rev 19 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
GO2-91-131, Forwards Rev 9 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)8 July 1991Forwards Rev 9 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)
GO2-91-161, Forwards Rev 20 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)5 September 1991Forwards Rev 20 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
GO2-91-162, Forwards Rev 10 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)5 September 1991Forwards Rev 10 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)
GO2-91-176, Forwards Rev 9 to Guard Training & Qualification Plan.Rev Withheld26 September 1991Forwards Rev 9 to Guard Training & Qualification Plan.Rev Withheld