RS-08-075, LTR-CDME-08-11, Rev. 3 Np, Interim Alternate Repair Criterion (ARC) for Cracks in the Lower Region of the Tubesheet Expansion Zone.3 June 2008LTR-CDME-08-11, Rev. 3 Np, Interim Alternate Repair Criterion (ARC) for Cracks in the Lower Region of the Tubesheet Expansion Zone.Finite Element Analysis
RS-12-023, WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5).30 June 2011WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5).Finite Element Analysis
RS-14-082, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report27 February 2014ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
RS-15-267, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)30 November 2015Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds15 March 2016Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove WeldsBoric Acid
RS-17-119, Byron, Units 1 and 2 - Engineering Change EC 366685, Revision 67, OP Eval. 07-006, Aux Feed Tunnel Covers Installation, Redacted1 July 2009Byron, Units 1 and 2 - Engineering Change EC 366685, Revision 67, OP Eval. 07-006, Aux Feed Tunnel Covers Installation, Redacted
RS-17-119, Byron, Units 1 and 2 - Full Action Request Report AR 1284054, Legacy Issues with Main Steam Tunnel Pressurization Calculation, Redacted31 October 2011Byron, Units 1 and 2 - Full Action Request Report AR 1284054, Legacy Issues with Main Steam Tunnel Pressurization Calculation, Redacted
RS-17-119, Byron, Units 1 and 2 - Full Action Request Report AR 1531420, No Actions Tracking Update to Calculation 3C8-0282-001, Redacted1 July 2013Byron, Units 1 and 2 - Full Action Request Report AR 1531420, No Actions Tracking Update to Calculation 3C8-0282-001, Redacted
RS-17-119, Byron, Units 1 and 2 - Full Action Request Report AR 789344, Error in Ms Tunnel Pressurization Calculation, Redacted12 June 2008Byron, Units 1 and 2 - Full Action Request Report AR 789344, Error in Ms Tunnel Pressurization Calculation, RedactedPast operability
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld12 May 2021Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel WeldHydrostatic
VT-2
Finite Element Analysis
RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections1 September 2021R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius SectionsFinite Element Analysis
Aging Management
RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 1020 April 2023Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10Non-Destructive Examination
Code Reconciliation
RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 7529 September 2023Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75Boric Acid
VT-2
Finite Element Analysis
Liquid penetrant
Exclusive Use