RS-08-075, LTR-CDME-08-11, Rev. 3 Np, Interim Alternate Repair Criterion (ARC) for Cracks in the Lower Region of the Tubesheet Expansion Zone. | 3 June 2008 | LTR-CDME-08-11, Rev. 3 Np, Interim Alternate Repair Criterion (ARC) for Cracks in the Lower Region of the Tubesheet Expansion Zone. | Finite Element Analysis |
RS-12-023, WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). | 30 June 2011 | WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). | Finite Element Analysis |
RS-14-082, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report | 27 February 2014 | ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report | |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
RS-15-267, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 30 November 2015 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | 15 March 2016 | Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | Boric Acid |
RS-17-119, Byron, Units 1 and 2 - Engineering Change EC 366685, Revision 67, OP Eval. 07-006, Aux Feed Tunnel Covers Installation, Redacted | 1 July 2009 | Byron, Units 1 and 2 - Engineering Change EC 366685, Revision 67, OP Eval. 07-006, Aux Feed Tunnel Covers Installation, Redacted | |
RS-17-119, Byron, Units 1 and 2 - Full Action Request Report AR 1284054, Legacy Issues with Main Steam Tunnel Pressurization Calculation, Redacted | 31 October 2011 | Byron, Units 1 and 2 - Full Action Request Report AR 1284054, Legacy Issues with Main Steam Tunnel Pressurization Calculation, Redacted | |
RS-17-119, Byron, Units 1 and 2 - Full Action Request Report AR 1531420, No Actions Tracking Update to Calculation 3C8-0282-001, Redacted | 1 July 2013 | Byron, Units 1 and 2 - Full Action Request Report AR 1531420, No Actions Tracking Update to Calculation 3C8-0282-001, Redacted | |
RS-17-119, Byron, Units 1 and 2 - Full Action Request Report AR 789344, Error in Ms Tunnel Pressurization Calculation, Redacted | 12 June 2008 | Byron, Units 1 and 2 - Full Action Request Report AR 789344, Error in Ms Tunnel Pressurization Calculation, Redacted | Past operability |
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Nondestructive Examination |
RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld | 12 May 2021 | Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld | Hydrostatic VT-2 Finite Element Analysis |
RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | 1 September 2021 | R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Finite Element Analysis Aging Management |
RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 | 20 April 2023 | Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 | Non-Destructive Examination Code Reconciliation |
RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 | 29 September 2023 | Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 | Boric Acid VT-2 Finite Element Analysis Liquid penetrant Exclusive Use |