Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19352E77519 December 2019Letter to NuScale Transmitting Final SER TR-0516-49417 Rev 1 Stability
ML19352E77821 January 2020SER NuScale TR_0516_49417 Stability_Public_Encl 1Ultimate heat sink
Anticipated operational occurrence
Fuel cladding
ML20013D43713 January 2020DCA - Safety Evaluation Report with No Open Items for Chapter 1, Introduction and General Discussion.Safe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Emergency Lighting
ML20022A17822 January 2020Design Certification Application - Chapter 9 Phase 4 SER PublicSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Multiple Spurious Operation
Emergency Lighting
Incorporated by reference
Surveillance Frequency Control Program
License Renewal
Exemption Request
Earthquake
Control of Heavy Loads
Turbine Missile
Biofouling
Fire Protection Program
GOTHIC
ML20027A10830 January 2020Accident Source Term TR Final SER PublicProbabilistic Risk Assessment
Fuel cladding
ML20044E34918 February 2020Rod Ejection Accident Methodology SERFuel cladding
ML20049H54218 February 2020NON-LOCA TR SE Final Redacted (Public)Safe Shutdown
Shutdown Margin
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Rod Drop Event
Fuel cladding
ML20049H54418 February 2020Letter to NuScale NON-LOCA TR SER
ML20056C90827 February 2020Final SER for NuScale Power LLC TR-0716-50351, Areva Method for Evaluation of Fuel Assembly Structural Response to External Applied Forces, Revison 1 (Letter) & (Encl. 1 - Public Version)Earthquake
ML20157A2215 June 2020Final SER for NuScale TR-0716-50350-P, Rod Ejection Accident Methodology, Revision 1 (Letter) & (Encl.1 Public Version)Fuel cladding
ML20181A26822 June 2020Final SER for NuScale TR-0516-49422, Rev 2 (Encl. 1_PUBLIC Version)Ultimate heat sink
Stroke time
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Fuel cladding
ML20181A43122 June 2020Final SER for NuScale TR-0516-49416, Rev 3 (Encl. 1_PUBLIC Version)Safe Shutdown
Shutdown Margin
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Rod Drop Event
Fuel cladding
ML20199M40820 July 2020Final SER for NuScale Chapter 15, Transient and Accident Analyses (Public Version)Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Exemption Request
Control of Heavy Loads
Fuel cladding
Coast down
Failure to Scram
ML21012A36311 February 2021Safety Evaluation for NuScale Power, LLC, Control Room Staffing Topical Report TR-0420-69456 PublicExemption Request