 Issue dateTitleTopic
05000364/LER-1982-025, Forwards LER 82-025/03L-09 July 1982Forwards LER 82-025/03L-0
05000364/LER-1982-028, Forwards LER 82-028/01T-024 June 1982Forwards LER 82-028/01T-0
05000364/LER-1982-032, Forwards LER 82-032/03L-019 August 1982Forwards LER 82-032/03L-0
05000364/LER-1982-033, Forwards LER 82-033/03L-119 October 1982Forwards LER 82-033/03L-1
05000364/LER-1982-041, Forwards LER 82-041/03L-028 October 1982Forwards LER 82-041/03L-0
05000364/LER-1982-043, Forwards LER 82-043/01T-010 November 1982Forwards LER 82-043/01T-0
05000364/LER-1982-046, Forwards LER 82-046/03L-01 December 1982Forwards LER 82-046/03L-0
05000364/LER-1982-051, Forwards LER 82-051/03L-029 December 1982Forwards LER 82-051/03L-0
05000364/LER-1983-002, Forwards LER 83-002/03L-017 February 1983Forwards LER 83-002/03L-0
05000364/LER-1983-003, Forwards LER 83-003/03L-016 February 1983Forwards LER 83-003/03L-0
05000364/LER-1983-014, Forwards LER 83-014/03L-08 April 1983Forwards LER 83-014/03L-0
05000364/LER-1983-015, Forwards LER 83-015/03L-024 March 1983Forwards LER 83-015/03L-0
05000364/LER-1983-016, Forwards LER 83-016/03L-014 April 1983Forwards LER 83-016/03L-0
05000364/LER-1983-018, Forwards LER 83-018/03L-022 April 1983Forwards LER 83-018/03L-0
05000364/LER-1983-019, Forwards LER 83-019/03L-03 May 1983Forwards LER 83-019/03L-0
05000364/LER-1983-021, Forwards LER 83-021/03L-05 May 1983Forwards LER 83-021/03L-0
05000364/LER-1983-022, Forwards LERs 83-020/03L-0 & 83-022/03L-0.W/o LER 83-022/03L-020 May 1983Forwards LERs 83-020/03L-0 & 83-022/03L-0.W/o LER 83-022/03L-0
05000364/LER-1995-001, Forwards LER 95-001-01.Rev Provides Corrected Total of in-service Sleeves & Sleeved Tubes in 2C S/G Following U2RF10 & Includes Data Associated W/L* Tubes as Result of Event Described in LER 96-002-00 (Unit 2)14 June 1996Forwards LER 95-001-01.Rev Provides Corrected Total of in-service Sleeves & Sleeved Tubes in 2C S/G Following U2RF10 & Includes Data Associated W/L* Tubes as Result of Event Described in LER 96-002-00 (Unit 2)
05000364/LER-1998-001, Forwards LER 98-001-00 Re Manual Reactor Trip Due to Dropped Control Rod K-2.Two NRC Commitments Contained in Corrective Action Section of LER16 April 1998Forwards LER 98-001-00 Re Manual Reactor Trip Due to Dropped Control Rod K-2.Two NRC Commitments Contained in Corrective Action Section of LER
05000364/LER-1998-002, Forwards LER 98-002-00 Re Discovery of Turbine Auto Stop Oil Pressure Switch Setpoints Being Out of TS Limits.Commitments Made by Util,Discussed4 May 1998Forwards LER 98-002-00 Re Discovery of Turbine Auto Stop Oil Pressure Switch Setpoints Being Out of TS Limits.Commitments Made by Util,Discussed
05000364/LER-1998-004, Forwards LER 98-004-00,IAW 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Listed18 May 1998Forwards LER 98-004-00,IAW 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Listed
05000364/LER-1998-005, Forwards LER 98-005-00 Re TS 3.0.4 Not Being Met During Mode Change Due to Turbine Driven Auxiliary Feedwater Pump Being Inoperable.No NRC Commitments Contained in LER10 June 1998Forwards LER 98-005-00 Re TS 3.0.4 Not Being Met During Mode Change Due to Turbine Driven Auxiliary Feedwater Pump Being Inoperable.No NRC Commitments Contained in LER
05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed2 July 1999Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed
0CAN108807, Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 Meeting17 October 1988Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 MeetingSafe Shutdown
Earthquake
2CAN038910, Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort29 March 1989Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation EffortExemption Request
3F0789-05, Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala7 July 1989Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala
3F1285-12, Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl20 December 1985Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl
A01328, Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-0725 November 1987Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-07Hot Short
A02375, Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring10 June 1982Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring
A02468, Comments on Draft Branch Technical Position Re Radwaste Classification10 May 1982Comments on Draft Branch Technical Position Re Radwaste Classification
A02477, Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-07374 June 1982Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737
A02608, Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests30 July 1982Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests
A02611, Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 82091719 July 1982Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 820917
A02644, Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III30 July 1982Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III
A04790, Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid30 September 1985Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee PaidReactor Vessel Water Level
Anchor Darling
Exemption Request
Backfit
A04820, Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube Integrity25 June 1985Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube IntegrityForeign Material Exclusion
A04824, Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 Provided11 October 1985Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 ProvidedHydrostatic
Backfit
A04858, Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid13 September 1985Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee PaidProbabilistic Risk Assessment
Exemption Request
A04880, Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 25 August 1985Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 2Backfit
A04906, Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed5 July 1985Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities ListedFire Barrier
Systematic Assessment of Licensee Performance
A05276, Forwards Safety & Safeguards Insp Fees for 841223-85033023 October 1985Forwards Safety & Safeguards Insp Fees for 841223-850330
A05394, Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 127 June 1988Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1Boric Acid
Stroke time
A05442, Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 86053018 February 1986Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530Exemption Request
A05610, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl13 June 1986Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering EnclReactor Vessel Water Level
Ultimate heat sink
Fuel cladding
Power change
A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants3 July 1986Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants
A05911, Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring..25 July 1986Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring..
A05959, Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 198712 March 1987Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987High Radiation Area
A06023, Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-141 October 1986Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14
A06150, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants20 November 1986Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants
A06244, Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl7 January 1987Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl