05000364/LER-1982-025, Forwards LER 82-025/03L-0 | 9 July 1982 | Forwards LER 82-025/03L-0 | |
05000364/LER-1982-028, Forwards LER 82-028/01T-0 | 24 June 1982 | Forwards LER 82-028/01T-0 | |
05000364/LER-1982-032, Forwards LER 82-032/03L-0 | 19 August 1982 | Forwards LER 82-032/03L-0 | |
05000364/LER-1982-033, Forwards LER 82-033/03L-1 | 19 October 1982 | Forwards LER 82-033/03L-1 | |
05000364/LER-1982-041, Forwards LER 82-041/03L-0 | 28 October 1982 | Forwards LER 82-041/03L-0 | |
05000364/LER-1982-043, Forwards LER 82-043/01T-0 | 10 November 1982 | Forwards LER 82-043/01T-0 | |
05000364/LER-1982-046, Forwards LER 82-046/03L-0 | 1 December 1982 | Forwards LER 82-046/03L-0 | |
05000364/LER-1982-051, Forwards LER 82-051/03L-0 | 29 December 1982 | Forwards LER 82-051/03L-0 | |
05000364/LER-1983-002, Forwards LER 83-002/03L-0 | 17 February 1983 | Forwards LER 83-002/03L-0 | |
05000364/LER-1983-003, Forwards LER 83-003/03L-0 | 16 February 1983 | Forwards LER 83-003/03L-0 | |
05000364/LER-1983-014, Forwards LER 83-014/03L-0 | 8 April 1983 | Forwards LER 83-014/03L-0 | |
05000364/LER-1983-015, Forwards LER 83-015/03L-0 | 24 March 1983 | Forwards LER 83-015/03L-0 | |
05000364/LER-1983-016, Forwards LER 83-016/03L-0 | 14 April 1983 | Forwards LER 83-016/03L-0 | |
05000364/LER-1983-018, Forwards LER 83-018/03L-0 | 22 April 1983 | Forwards LER 83-018/03L-0 | |
05000364/LER-1983-019, Forwards LER 83-019/03L-0 | 3 May 1983 | Forwards LER 83-019/03L-0 | |
05000364/LER-1983-021, Forwards LER 83-021/03L-0 | 5 May 1983 | Forwards LER 83-021/03L-0 | |
05000364/LER-1983-022, Forwards LERs 83-020/03L-0 & 83-022/03L-0.W/o LER 83-022/03L-0 | 20 May 1983 | Forwards LERs 83-020/03L-0 & 83-022/03L-0.W/o LER 83-022/03L-0 | |
05000364/LER-1995-001, Forwards LER 95-001-01.Rev Provides Corrected Total of in-service Sleeves & Sleeved Tubes in 2C S/G Following U2RF10 & Includes Data Associated W/L* Tubes as Result of Event Described in LER 96-002-00 (Unit 2) | 14 June 1996 | Forwards LER 95-001-01.Rev Provides Corrected Total of in-service Sleeves & Sleeved Tubes in 2C S/G Following U2RF10 & Includes Data Associated W/L* Tubes as Result of Event Described in LER 96-002-00 (Unit 2) | |
05000364/LER-1998-001, Forwards LER 98-001-00 Re Manual Reactor Trip Due to Dropped Control Rod K-2.Two NRC Commitments Contained in Corrective Action Section of LER | 16 April 1998 | Forwards LER 98-001-00 Re Manual Reactor Trip Due to Dropped Control Rod K-2.Two NRC Commitments Contained in Corrective Action Section of LER | |
05000364/LER-1998-002, Forwards LER 98-002-00 Re Discovery of Turbine Auto Stop Oil Pressure Switch Setpoints Being Out of TS Limits.Commitments Made by Util,Discussed | 4 May 1998 | Forwards LER 98-002-00 Re Discovery of Turbine Auto Stop Oil Pressure Switch Setpoints Being Out of TS Limits.Commitments Made by Util,Discussed | |
05000364/LER-1998-004, Forwards LER 98-004-00,IAW 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Listed | 18 May 1998 | Forwards LER 98-004-00,IAW 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Listed | |
05000364/LER-1998-005, Forwards LER 98-005-00 Re TS 3.0.4 Not Being Met During Mode Change Due to Turbine Driven Auxiliary Feedwater Pump Being Inoperable.No NRC Commitments Contained in LER | 10 June 1998 | Forwards LER 98-005-00 Re TS 3.0.4 Not Being Met During Mode Change Due to Turbine Driven Auxiliary Feedwater Pump Being Inoperable.No NRC Commitments Contained in LER | |
05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed | 2 July 1999 | Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed | |
0CAN108807, Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 Meeting | 17 October 1988 | Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 Meeting | Safe Shutdown Earthquake |
2CAN038910, Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort | 29 March 1989 | Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort | Exemption Request |
3F0789-05, Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala | 7 July 1989 | Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala | |
3F1285-12, Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl | 20 December 1985 | Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl | |
A01328, Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-07 | 25 November 1987 | Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-07 | Hot Short |
A02375, Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring | 10 June 1982 | Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring | |
A02468, Comments on Draft Branch Technical Position Re Radwaste Classification | 10 May 1982 | Comments on Draft Branch Technical Position Re Radwaste Classification | |
A02477, Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737 | 4 June 1982 | Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737 | |
A02608, Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests | 30 July 1982 | Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests | |
A02611, Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 820917 | 19 July 1982 | Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 820917 | |
A02644, Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III | 30 July 1982 | Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III | |
A04790, Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid | 30 September 1985 | Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid | Reactor Vessel Water Level Anchor Darling Exemption Request Backfit |
A04820, Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube Integrity | 25 June 1985 | Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube Integrity | Foreign Material Exclusion |
A04824, Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 Provided | 11 October 1985 | Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 Provided | Hydrostatic Backfit |
A04858, Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid | 13 September 1985 | Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid | Probabilistic Risk Assessment Exemption Request |
A04880, Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 2 | 5 August 1985 | Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 2 | Backfit |
A04906, Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed | 5 July 1985 | Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed | Fire Barrier Systematic Assessment of Licensee Performance |
A05276, Forwards Safety & Safeguards Insp Fees for 841223-850330 | 23 October 1985 | Forwards Safety & Safeguards Insp Fees for 841223-850330 | |
A05394, Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1 | 27 June 1988 | Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1 | Boric Acid Stroke time |
A05442, Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 | 18 February 1986 | Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 | Exemption Request |
A05610, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl | 13 June 1986 | Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl | Reactor Vessel Water Level Ultimate heat sink Fuel cladding Power change |
A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | 3 July 1986 | Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | |
A05911, Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | 25 July 1986 | Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | |
A05959, Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | 12 March 1987 | Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | High Radiation Area |
A06023, Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | 1 October 1986 | Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | |
A06150, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | 20 November 1986 | Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | |
A06244, Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | 7 January 1987 | Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | |