Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17233A2266 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 5.0, Containment, Figures, Part 2 of 2
ML17233A2526 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 7.0, Control and Instrumentation, Figures, Part 2 of 2
ML17233A2616 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 8.0, Electrical Power Systems, Figure 8.3.1 Through Figure 8.8.1
ML17233A2626 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 9.0, Radioactive Waste Systems, Figure 9.2.1A Through Figure 9.4.1
ML17233A2676 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 10.0, Auxiliary Systems, Figure 10.3.1 Through Figure 10.24.4
ML17233A2716 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 12.0, Structures and Shielding, Figure 12.1.1 Through Figure 12.3.12
ML17233A2736 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity Piping and Equipment Pressure Parts, Figure A.2.1 Through Figure A.10.17
ML17233A2776 April 2017Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Appendix M, Containment Report, Figures M.1.1 Through M.3.5
ML19114A1238 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 1.0, Section 1.0, Introduction and Summary, Table of ContentsAbnormal operational transient
ML19114A1248 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and Summary, Sections 1 Through 13Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Abnormal operational transient
Scram Discharge Volume
Earthquake
Turbine Missile
Fuel cladding
Accidental discharge
Flow Induced Vibration
ML19114A1258 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 1.0, Figure 1.2.1 Through Figure 1.6.3
ML19114A1268 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 2.0, Site - Table of ContentsSafe Shutdown
High winds
Earthquake
ML19114A1308 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Reactor - Table of ContentsEarthquake
ML19114A1318 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Sections 1 Thru 8Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
Abnormal operational transient
Scram Discharge Volume
Overtravel
Earthquake
Fuel cladding
ML19114A1328 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1 Through Figure 3.8.5
ML19114A1338 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System, Table of ContentsHydrostatic
ML19114A1368 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Containment, Table of Contents
ML19114A1378 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Sections 1 Through 3High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Squib
Scram Discharge Volume
Earthquake
Hardened vent
Fuel cladding
Liquid penetrant
Power Uprate
ML19114A1398 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Core Standby Cooling Systems, Table of Contents
ML19114A1408 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Sections 1 Though 7Reactor Vessel Water Level
Stroke time
Fuel cladding
Coast down
ML19114A1418 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figures
ML19114A1428 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation, Table of ContentsReactor Vessel Water Level
ML19114A1438 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 Through 9Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Half scram
Stroke time
Operating Basis Earthquake
Squib
Abnormal operational transient
Scram Discharge Volume
Excess Flow Check Valve
Spiral reload
Overtravel
Earthquake
Hardened vent
Fuel cladding
Fire Protection Program
Power change
Failure to Scram
ML19114A1448 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Through 23Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Grab sample
Offsite Dose Calculation Manual
Operating Basis Earthquake
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Earthquake
Fire Protection Program
ML19114A1468 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems, Table of ContentsExemption Request
ML19114A1478 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Through 8Safe Shutdown
Emergency Lighting
Open Phase Condition
Earthquake
ML19114A1498 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Radioactive Waste Systems, Table of Contents
ML19114A1508 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 Through 4Loop seal
Offsite Dose Calculation Manual
Anticipated operational occurrence
Process Control Program
Earthquake
Fuel cladding
ML19114A1528 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Table of ContentsFire Protection Program
ML19114A1538 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Sections 1 Thru 24Safe Shutdown
Grab sample
Fire Barrier
Time to boil
Hydrostatic
Emergency Lighting
Incorporated by reference
Finite Element Analysis
FLEX
B.5.b
Tornado-Generated Missile
Spent Fuel Pool Instrumentation
Earthquake
Control of Heavy Loads
Turbine Missile
Fire Protection Program
ML19114A1558 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Power Conversion Systems
ML19114A1568 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Sections 1 Thru 8Safe Shutdown
Stroke time
Abnormal operational transient
Frazil ice
Turbine Missile
ML19114A1578 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figures
ML19114A1588 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Table of Contents
ML19114A1598 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 12, Sections 1 Thru 4Safe Shutdown
High Radiation Area
Tornado Missile
Internal Flooding
Hydrostatic
Earthquake
Deep Dose Equivalent
Power Uprate
ML19114A1618 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. Table of Contents
ML19114A1628 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Sections 1 Thru 8Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Hydrostatic
Squib
ML19114A1638 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Figures
ML19114A1648 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of ContentsSafe Shutdown
Reactor Vessel Water Level
Abnormal operational transient
Feedwater Controller Failure
ML19114A1658 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety AnalysisSafe Shutdown
Reactor Vessel Water Level
Abnormal operational transient
Feedwater Controller Failure
MELLLA
Severe Accident Management Guideline
Overtravel
Deep Dose Equivalent
Fuel cladding
Fire Protection Program
Coast down
ML19114A1668 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 14, FiguresSafe Shutdown
Abnormal operational transient
ML19114A1678 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix a, Table of ContentsSafe Shutdown
Hydrostatic
Liquid penetrant
Dissimilar Metal Weld
ML19114A1688 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure PartsSafe Shutdown
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Scram Discharge Volume
Earthquake
Liquid penetrant
Dissimilar Metal Weld
ML19114A1708 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix B, Technical Specifications
ML19114A1718 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix C, Table of ContentsTornado Generated Missile
Earthquake
Turbine Missile
ML19114A1728 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix C, Structural Design CriteriaSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Tornado Generated Missile
Abnormal operational transient
Design basis earthquake
Earthquake
Turbine Missile
ML19114A1738 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix C, Figures
ML19114A1758 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix D, Table of Contents
ML19114A1768 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix D, Quality Assurance During the Operations Phase
ML19114A1778 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix D, Figures