Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17234A10131 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4A, Tables 4-1 Through 4-24
ML17234A10231 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures 4-1 Through 4-37
ML17234A10431 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5a, Tables 5-1 Through 5-29
ML17234A10731 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Tables 6-1 Through 6-35
ML17234A10931 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML17234A11031 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7A, Tables 7-1 Through 7-6
ML17234A11131 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures 7-1 Through 7-21
ML17234A11231 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 8.0, Electric Power
ML17234A11331 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix a, Tables 8-1 Through 8-7
ML17234A11431 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9
ML17234A11631 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Tables 9-1 Through 9-19
ML17234A11831 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML17234A11931 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A, Tables 10-1 Through 10-2
ML17234A12031 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9
ML17234A12231 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML17234A12331 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11A, Tables 11-1 Through 11-7
ML17234A12431 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6
ML17234A12531 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML17234A12731 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML17234A12831 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13A, Tables 13-1 Through 13-2
ML17234A12931 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8
ML17234A13031 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation
ML17234A13231 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A, Tables 14-1 Through 14-2
ML17234A13331 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML17234A13431 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15A, Tables 15-1 Through 15-68
ML17234A13531 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232
ML17234A13631 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 16, Selected Licensee Commitments
ML17234A13731 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML17234A13831 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and ActivitiesAging Management
ML17234A13931 December 2016Revision 26 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A, Table 18-1
ML17361A40331 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML17361A40431 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures 3-1 Through 3-60
ML17361A40531 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML17361A40631 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures 5-1 Through 5-33
ML17361A40731 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards
ML17361A40831 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures
ML17361A40931 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML17361A41031 December 2016Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted
ML18192A50129 June 2018Submittal of Updated Final Safety Analysis Report, Revision 27Aging Management
ML18192A83829 June 2018Oconee Nuclear Site - Independent Spent Fuel Storage Facility Updated Final Safety Analysis Report, Rev. 27
ML18192A88831 December 2017Revision 27 to Updated Final Safety Analysis Report, Title Page
ML18192A89031 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
Boric Acid
Shutdown Margin
ML18192A89231 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1A, Tables
ML18192A89431 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures (Redacted)
ML18192A89631 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Site CharacteristicsHydrostatic
Earthquake
ML18192A89831 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, TablesEarthquake
ML18192A90131 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, FiguresEarthquake
ML18192A90331 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and SystemsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
FLEX
High Energy Line Break
Tornado-Generated Missile
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Feedwater Heater
Integrated leak rate test
Spent Fuel Pool Instrumentation
License Renewal
Earthquake
Control of Heavy Loads
Turbine Missile
Backfit
Power change
Flow Induced Vibration
Overspeed trip
Thermal fatigue
ML18192A90531 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, TablesSafe Shutdown
Boric Acid
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML18192A90731 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures