ML17234A132
Text
Oconee Nuclear Station UFSAR Appendix 14A. Tables Appendix 14A. Tables
Oconee Nuclear Station UFSAR Table 14-1 (Page 1 of 1)
(31 DEC 2000)
Table 14-1. Tests Prior to Initial Fuel Loading Penetration Room Pressure Drop and Filter Test Reactor Building Structural Integrity Test Reactor Building Leak Tests Reactor Building Cooling System Functional Test Reactor Building Purge System Functional and Operational Test Reactor Internals Vent Valve Inspection Test Core Flooding System Engineered Safeguards Test High Pressure Injection System Engineered Safeguards Test Low Pressure Injection System Functional Test Low Pressure Injection System Engineered Safeguards Test Reactor Building Spray System Functional Test Soluble Poison Control Test Low Pressure Service Water System Test Condenser Circulating Water System Gravity Flow Test Steam Generator Hydrostatic Test Integrated Control Rod Drive System Test Control Rod Drive Trip Test Process Radiation Monitoring System Calibration and Functional Test Area Radiation Monitoring System Calibration and Functional Test Reactor Coolant Hot Leakage Test Control Rod Drive Operational Test Electrical System Normal and Emergency Operation Test Integrated Safeguards Actuation Test Reactor Protective System Functional Test Keowee Hydro Emergency Power Functional Test Control Rod Drive Mechanism Temperature Test
Oconee Nuclear Station UFSAR Table 14-2 (Page 1 of 1)
(31 DEC 2000)
Table 14-2. Postcriticality Tests Zero Power Physics Test Reactor Coolant Flow Test Reactor Coolant Flow Coastdown Test Controlling Procedure for Power Escalation Loss of Control Room Nuclear Instrumentation Power Calibration Biological Shield Survey Test Natural Circulation Test Reactivity Coefficients at Power Xenon Reactivity Worth and Rapid Depletion Test Core Power Distribution Test Reactor/Turbine Trip Test Induced Power Oscillation Test Rod Worth at Power Test Power lmbalance Detector Correlation Test Nuclear Steam Supply System Heat Balance Unit Load Steady-State Test Unit Transient Test