Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000289/LER-1982-016, Forwards LER 82-016/03L-021 January 1983Forwards LER 82-016/03L-0Fire Barrier
05000289/LER-1983-002, Forwards LER 83-002/03L-02 March 1983Forwards LER 83-002/03L-0
05000289/LER-1983-005, Forwards LER 83-005/01T-04 April 1983Forwards LER 83-005/01T-0
05000289/LER-1983-006, Forwards LER 83-006/03L-019 April 1983Forwards LER 83-006/03L-0
05000289/LER-1983-007, Forwards LER 83-007/03L-025 April 1983Forwards LER 83-007/03L-0
05000289/LER-1983-008, Forwards LER 83-008/01T-012 April 1983Forwards LER 83-008/01T-0
05000289/LER-1983-009, Forwards LER 83-009/03L-029 April 1983Forwards LER 83-009/03L-0
05000289/LER-1983-010, Forwards LER 83-010/03L-020 April 1983Forwards LER 83-010/03L-0
05000289/LER-1983-011, Forwards LER 83-011/01T-029 April 1983Forwards LER 83-011/01T-0
05000289/LER-1983-044, Forwards LER 83-044/01T-1.Info Potentially Relevant to Plant Design & Procedures Phase of Proceeding.Svc List Encl9 December 1983Forwards LER 83-044/01T-1.Info Potentially Relevant to Plant Design & Procedures Phase of Proceeding.Svc List Encl
05000289/LER-1984-004, Forwards Corrected LER 84-004-00 Re Misplugged Steam Generator Tubes.Rept Date Corrected & Licensee Contact Changed25 March 1985Forwards Corrected LER 84-004-00 Re Misplugged Steam Generator Tubes.Rept Date Corrected & Licensee Contact Changed
05000289/LER-1991-008, Forwards LER 91-008-00 Re Missed Surveillance for Core Flood Tank Samples.Ler Submitted Per Interim Util Policy Issued in Response to Violations Noted in Insp Rept 50-289/92-2029 January 1993Forwards LER 91-008-00 Re Missed Surveillance for Core Flood Tank Samples.Ler Submitted Per Interim Util Policy Issued in Response to Violations Noted in Insp Rept 50-289/92-20Missed surveillance
05000289/LER-1995-001, Forwards LER 95-001 Re Rc Leak Caused by Failure of Parker Hannifin Instrument Tube Compression Fitting That Was Found Inadequately Tightened6 April 1995Forwards LER 95-001 Re Rc Leak Caused by Failure of Parker Hannifin Instrument Tube Compression Fitting That Was Found Inadequately Tightened
05000289/LER-1996-002, Forwards LER 96-002-01,updating Status of Corrective Actions & Correcting Inaccurate Date Given for Calculation Referred to in LER Which Was Noted During Insp by NRC Region I11 December 1997Forwards LER 96-002-01,updating Status of Corrective Actions & Correcting Inaccurate Date Given for Calculation Referred to in LER Which Was Noted During Insp by NRC Region I
05000289/LER-1997-001, Forwards Corrected Copy of LER 97-001-00 Re Condition Found During Review of GL 96-0617 February 1997Forwards Corrected Copy of LER 97-001-00 Re Condition Found During Review of GL 96-06
05000289/LER-1997-003, Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures29 September 1997Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures
05000289/LER-1997-004, Forwards LER 97-004-00 Re Auxiliary & Fuel Handling Bldg Ventilation Sys Declared Inoperable,Due to Questions on Quality Classification on 9702284 April 1997Forwards LER 97-004-00 Re Auxiliary & Fuel Handling Bldg Ventilation Sys Declared Inoperable,Due to Questions on Quality Classification on 970228
05000289/LER-1997-006, Forwards LER 97-006-00,resulting from Violation of TS 3.3 & Declaring Reactor Bldg fans,AH-E-1B & C,Inoperable on 97042423 May 1997Forwards LER 97-006-00,resulting from Violation of TS 3.3 & Declaring Reactor Bldg fans,AH-E-1B & C,Inoperable on 970424
05000289/LER-1997-007, Forwards LER 97-007-00 Re Loss of Offsite Power Event That Occurred at TMI-1 on 97062121 July 1997Forwards LER 97-007-00 Re Loss of Offsite Power Event That Occurred at TMI-1 on 970621
05000289/LER-1997-008, Forwards LER 97-008-00 Re Failure of Four CRs to Meet TS Section 4.7.1.1 Insertion Requirement of 1.66 Seconds on 97062121 July 1997Forwards LER 97-008-00 Re Failure of Four CRs to Meet TS Section 4.7.1.1 Insertion Requirement of 1.66 Seconds on 970621
05000289/LER-1997-009, Forwards LER 97-009-00,re Condition Which Was Evaluated & Determined to Be Reportable on 970725.Condition Was Identified as Result of Review of Crystal River 3 LER for Applicability at TMI-125 August 1997Forwards LER 97-009-00,re Condition Which Was Evaluated & Determined to Be Reportable on 970725.Condition Was Identified as Result of Review of Crystal River 3 LER for Applicability at TMI-1
05000289/LER-1997-010, Forwards LER 97-010-00,concerning Inoperable PORV Resulting from Violation of TS 4.2.2,in that,post-maintenance Test Was Not Performed on PORV Following Replacement During 11R Refueling12 November 1997Forwards LER 97-010-00,concerning Inoperable PORV Resulting from Violation of TS 4.2.2,in that,post-maintenance Test Was Not Performed on PORV Following Replacement During 11R Refueling
05000289/LER-1998-001, Forwards LER 98-001-00,concerning Flow Instrumentation Allowed to Remain Out of Svc for Greater than 72 H TS Allowable Outage Time.Event Did Not Adversely Affect Health & Safety of Public23 February 1998Forwards LER 98-001-00,concerning Flow Instrumentation Allowed to Remain Out of Svc for Greater than 72 H TS Allowable Outage Time.Event Did Not Adversely Affect Health & Safety of Public
05000289/LER-1998-002, Forwards LER 98-002-01,providing Addl Info Addressing Reason for Event,Extent of Problem Associated W/Missing Operator Aid,Assessment of Safety Consequences of Event & Corrective Actions Taken3 April 1998Forwards LER 98-002-01,providing Addl Info Addressing Reason for Event,Extent of Problem Associated W/Missing Operator Aid,Assessment of Safety Consequences of Event & Corrective Actions Taken
05000289/LER-1998-003, Forwards LER 98-003-00 Re 980218 Occurrence Which Was Evaluated & Determined to Be Reportable,Per 10CFR50.7319 March 1998Forwards LER 98-003-00 Re 980218 Occurrence Which Was Evaluated & Determined to Be Reportable,Per 10CFR50.73
05000289/LER-1998-004, Forwards LER 98-004-00,re Condition Where Both Trains of Reactor Building Spray Were Inoperable for Approximately 5 H Due to Installation of Console Switch Pushbutton Assembly20 March 1998Forwards LER 98-004-00,re Condition Where Both Trains of Reactor Building Spray Were Inoperable for Approximately 5 H Due to Installation of Console Switch Pushbutton Assembly
05000289/LER-1998-005, Forwards LER 98-005-00 Re Inoperable Fire Dampers Determined Reportable on 980416.No New Commitments Made within Ltr18 May 1998Forwards LER 98-005-00 Re Inoperable Fire Dampers Determined Reportable on 980416.No New Commitments Made within Ltr
05000289/LER-1998-006, Forwards LER 98-006-00,re Thermo-Lag Fire Barrier That Was Found Installed Outside Approved Joint Design Arrangement17 July 1998Forwards LER 98-006-00,re Thermo-Lag Fire Barrier That Was Found Installed Outside Approved Joint Design ArrangementFire Barrier
05000289/LER-1998-007, Forwards LER 98-007-00, Inoperable Intake Screen & Pump House Floor Drain Check Valves Due to Lack of Preventive Maint & Periodic Insps, Per 10CFR50.73.Rept Was Evaluated & Determined Reportable on 980720.W/o Encl14 August 1998Forwards LER 98-007-00, Inoperable Intake Screen & Pump House Floor Drain Check Valves Due to Lack of Preventive Maint & Periodic Insps, Per 10CFR50.73.Rept Was Evaluated & Determined Reportable on 980720.W/o Encl
05000289/LER-1998-008, Forwards LER 98-008-00,re Radiation Monitor RM-A8G-High Which Was Inoperable for More than 7 Days Due to Less than Adequate Performance of Calibr Surveillance14 September 1998Forwards LER 98-008-00,re Radiation Monitor RM-A8G-High Which Was Inoperable for More than 7 Days Due to Less than Adequate Performance of Calibr Surveillance
05000289/LER-1998-009, Forwards LER 98-009-00 Re Potential Loss of HPI During Postulated LOCA with Most Limiting Single Failure.Caused by Misapplication of Design Inputs When Operating Procedures Were Changed Prior to Startup for Current Operating Cy18 September 1998Forwards LER 98-009-00 Re Potential Loss of HPI During Postulated LOCA with Most Limiting Single Failure.Caused by Misapplication of Design Inputs When Operating Procedures Were Changed Prior to Startup for Current Operating Cycle
05000289/LER-1998-010, Forwards LER 98-010-00 Re Potential Violation of Design Criteria During Single Auxiliary Transformer Operation Reported on 980825.Second & Associated Issue Was Identified & Reported on 980916,as Suppl Info IAW 10CFR50.72(c)9 October 1998Forwards LER 98-010-00 Re Potential Violation of Design Criteria During Single Auxiliary Transformer Operation Reported on 980825.Second & Associated Issue Was Identified & Reported on 980916,as Suppl Info IAW 10CFR50.72(c)
05000289/LER-1998-011, Forwards LER 98-011-01,which Updates & Replaces Info Re Thermo-Lag Fire Barriers Found Installed Outside Approved Joint Arrangement.Rept Was Determined Reportable on 980825 & Reported Via LER 98-011-00 on 98092312 April 1999Forwards LER 98-011-01,which Updates & Replaces Info Re Thermo-Lag Fire Barriers Found Installed Outside Approved Joint Arrangement.Rept Was Determined Reportable on 980825 & Reported Via LER 98-011-00 on 980923Fire Barrier
05000289/LER-1998-012, Forwards LER 98-012-00 Re CR Damper in Control Bldg Habitability Emergency Ventilation Envelope That Was Discovered Out of Position.Event Did Not Adversely Affect Health & Safety of Public25 September 1998Forwards LER 98-012-00 Re CR Damper in Control Bldg Habitability Emergency Ventilation Envelope That Was Discovered Out of Position.Event Did Not Adversely Affect Health & Safety of Public
05000289/LER-1998-013, Forwards LER 98-013-01 Re Failure to Perform Fire Protection Program Surveillances at Required Frequency.Completed Corrective Actions Described in Section Viii of Attached Rept Constitute Commitments Made to Reduce Occurrence22 January 1999Forwards LER 98-013-01 Re Failure to Perform Fire Protection Program Surveillances at Required Frequency.Completed Corrective Actions Described in Section Viii of Attached Rept Constitute Commitments Made to Reduce OccurrenceFire Protection Program
05000289/LER-1999-001, Forwards LER 99-001-00,re Short Sections of Piping Were Below Temps Specified in FSAR Section 9.2.1.2.LER Is follow-up to Notification Made Via ENS Telephone to NRC on 99012219 February 1999Forwards LER 99-001-00,re Short Sections of Piping Were Below Temps Specified in FSAR Section 9.2.1.2.LER Is follow-up to Notification Made Via ENS Telephone to NRC on 990122Boric Acid
05000289/LER-1999-003, Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC7 May 1999Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC
05000289/LER-1999-004, Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT9 June 1999Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT
05000289/LER-1999-006, Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements23 June 1999Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements
05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface20 August 1999Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface
05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public2 July 1999Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of PublicBoric Acid
05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section22 July 1999Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section
05000320/LER-1982-015, Forwards LER 82-015/01L-018 June 1982Forwards LER 82-015/01L-0
05000320/LER-1982-016, Forwards LER 82-016/03L-018 June 1982Forwards LER 82-016/03L-0
05000320/LER-1982-017, Forwards LER 82-017/03L-024 June 1982Forwards LER 82-017/03L-0
05000320/LER-1982-018, Forwards LER 82-018/03L-030 June 1982Forwards LER 82-018/03L-0
05000320/LER-1982-019, Forwards LER 82-019/03L-030 June 1982Forwards LER 82-019/03L-0
05000320/LER-1982-020, Forwards LER 82-020/01L-026 July 1982Forwards LER 82-020/01L-0
05000320/LER-1982-022, Forwards LER 82-022/03L-012 July 1982Forwards LER 82-022/03L-0
05000320/LER-1982-023, Forwards LER 82-023/03L-029 July 1982Forwards LER 82-023/03L-0