05000289/LER-1982-016, Forwards LER 82-016/03L-0 | 21 January 1983 | Forwards LER 82-016/03L-0 | Fire Barrier |
05000289/LER-1983-002, Forwards LER 83-002/03L-0 | 2 March 1983 | Forwards LER 83-002/03L-0 | |
05000289/LER-1983-005, Forwards LER 83-005/01T-0 | 4 April 1983 | Forwards LER 83-005/01T-0 | |
05000289/LER-1983-006, Forwards LER 83-006/03L-0 | 19 April 1983 | Forwards LER 83-006/03L-0 | |
05000289/LER-1983-007, Forwards LER 83-007/03L-0 | 25 April 1983 | Forwards LER 83-007/03L-0 | |
05000289/LER-1983-008, Forwards LER 83-008/01T-0 | 12 April 1983 | Forwards LER 83-008/01T-0 | |
05000289/LER-1983-009, Forwards LER 83-009/03L-0 | 29 April 1983 | Forwards LER 83-009/03L-0 | |
05000289/LER-1983-010, Forwards LER 83-010/03L-0 | 20 April 1983 | Forwards LER 83-010/03L-0 | |
05000289/LER-1983-011, Forwards LER 83-011/01T-0 | 29 April 1983 | Forwards LER 83-011/01T-0 | |
05000289/LER-1983-044, Forwards LER 83-044/01T-1.Info Potentially Relevant to Plant Design & Procedures Phase of Proceeding.Svc List Encl | 9 December 1983 | Forwards LER 83-044/01T-1.Info Potentially Relevant to Plant Design & Procedures Phase of Proceeding.Svc List Encl | |
05000289/LER-1984-004, Forwards Corrected LER 84-004-00 Re Misplugged Steam Generator Tubes.Rept Date Corrected & Licensee Contact Changed | 25 March 1985 | Forwards Corrected LER 84-004-00 Re Misplugged Steam Generator Tubes.Rept Date Corrected & Licensee Contact Changed | |
05000289/LER-1991-008, Forwards LER 91-008-00 Re Missed Surveillance for Core Flood Tank Samples.Ler Submitted Per Interim Util Policy Issued in Response to Violations Noted in Insp Rept 50-289/92-20 | 29 January 1993 | Forwards LER 91-008-00 Re Missed Surveillance for Core Flood Tank Samples.Ler Submitted Per Interim Util Policy Issued in Response to Violations Noted in Insp Rept 50-289/92-20 | Missed surveillance |
05000289/LER-1995-001, Forwards LER 95-001 Re Rc Leak Caused by Failure of Parker Hannifin Instrument Tube Compression Fitting That Was Found Inadequately Tightened | 6 April 1995 | Forwards LER 95-001 Re Rc Leak Caused by Failure of Parker Hannifin Instrument Tube Compression Fitting That Was Found Inadequately Tightened | |
05000289/LER-1996-002, Forwards LER 96-002-01,updating Status of Corrective Actions & Correcting Inaccurate Date Given for Calculation Referred to in LER Which Was Noted During Insp by NRC Region I | 11 December 1997 | Forwards LER 96-002-01,updating Status of Corrective Actions & Correcting Inaccurate Date Given for Calculation Referred to in LER Which Was Noted During Insp by NRC Region I | |
05000289/LER-1997-001, Forwards Corrected Copy of LER 97-001-00 Re Condition Found During Review of GL 96-06 | 17 February 1997 | Forwards Corrected Copy of LER 97-001-00 Re Condition Found During Review of GL 96-06 | |
05000289/LER-1997-003, Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures | 29 September 1997 | Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures | |
05000289/LER-1997-004, Forwards LER 97-004-00 Re Auxiliary & Fuel Handling Bldg Ventilation Sys Declared Inoperable,Due to Questions on Quality Classification on 970228 | 4 April 1997 | Forwards LER 97-004-00 Re Auxiliary & Fuel Handling Bldg Ventilation Sys Declared Inoperable,Due to Questions on Quality Classification on 970228 | |
05000289/LER-1997-006, Forwards LER 97-006-00,resulting from Violation of TS 3.3 & Declaring Reactor Bldg fans,AH-E-1B & C,Inoperable on 970424 | 23 May 1997 | Forwards LER 97-006-00,resulting from Violation of TS 3.3 & Declaring Reactor Bldg fans,AH-E-1B & C,Inoperable on 970424 | |
05000289/LER-1997-007, Forwards LER 97-007-00 Re Loss of Offsite Power Event That Occurred at TMI-1 on 970621 | 21 July 1997 | Forwards LER 97-007-00 Re Loss of Offsite Power Event That Occurred at TMI-1 on 970621 | |
05000289/LER-1997-008, Forwards LER 97-008-00 Re Failure of Four CRs to Meet TS Section 4.7.1.1 Insertion Requirement of 1.66 Seconds on 970621 | 21 July 1997 | Forwards LER 97-008-00 Re Failure of Four CRs to Meet TS Section 4.7.1.1 Insertion Requirement of 1.66 Seconds on 970621 | |
05000289/LER-1997-009, Forwards LER 97-009-00,re Condition Which Was Evaluated & Determined to Be Reportable on 970725.Condition Was Identified as Result of Review of Crystal River 3 LER for Applicability at TMI-1 | 25 August 1997 | Forwards LER 97-009-00,re Condition Which Was Evaluated & Determined to Be Reportable on 970725.Condition Was Identified as Result of Review of Crystal River 3 LER for Applicability at TMI-1 | |
05000289/LER-1997-010, Forwards LER 97-010-00,concerning Inoperable PORV Resulting from Violation of TS 4.2.2,in that,post-maintenance Test Was Not Performed on PORV Following Replacement During 11R Refueling | 12 November 1997 | Forwards LER 97-010-00,concerning Inoperable PORV Resulting from Violation of TS 4.2.2,in that,post-maintenance Test Was Not Performed on PORV Following Replacement During 11R Refueling | |
05000289/LER-1998-001, Forwards LER 98-001-00,concerning Flow Instrumentation Allowed to Remain Out of Svc for Greater than 72 H TS Allowable Outage Time.Event Did Not Adversely Affect Health & Safety of Public | 23 February 1998 | Forwards LER 98-001-00,concerning Flow Instrumentation Allowed to Remain Out of Svc for Greater than 72 H TS Allowable Outage Time.Event Did Not Adversely Affect Health & Safety of Public | |
05000289/LER-1998-002, Forwards LER 98-002-01,providing Addl Info Addressing Reason for Event,Extent of Problem Associated W/Missing Operator Aid,Assessment of Safety Consequences of Event & Corrective Actions Taken | 3 April 1998 | Forwards LER 98-002-01,providing Addl Info Addressing Reason for Event,Extent of Problem Associated W/Missing Operator Aid,Assessment of Safety Consequences of Event & Corrective Actions Taken | |
05000289/LER-1998-003, Forwards LER 98-003-00 Re 980218 Occurrence Which Was Evaluated & Determined to Be Reportable,Per 10CFR50.73 | 19 March 1998 | Forwards LER 98-003-00 Re 980218 Occurrence Which Was Evaluated & Determined to Be Reportable,Per 10CFR50.73 | |
05000289/LER-1998-004, Forwards LER 98-004-00,re Condition Where Both Trains of Reactor Building Spray Were Inoperable for Approximately 5 H Due to Installation of Console Switch Pushbutton Assembly | 20 March 1998 | Forwards LER 98-004-00,re Condition Where Both Trains of Reactor Building Spray Were Inoperable for Approximately 5 H Due to Installation of Console Switch Pushbutton Assembly | |
05000289/LER-1998-005, Forwards LER 98-005-00 Re Inoperable Fire Dampers Determined Reportable on 980416.No New Commitments Made within Ltr | 18 May 1998 | Forwards LER 98-005-00 Re Inoperable Fire Dampers Determined Reportable on 980416.No New Commitments Made within Ltr | |
05000289/LER-1998-006, Forwards LER 98-006-00,re Thermo-Lag Fire Barrier That Was Found Installed Outside Approved Joint Design Arrangement | 17 July 1998 | Forwards LER 98-006-00,re Thermo-Lag Fire Barrier That Was Found Installed Outside Approved Joint Design Arrangement | Fire Barrier |
05000289/LER-1998-007, Forwards LER 98-007-00, Inoperable Intake Screen & Pump House Floor Drain Check Valves Due to Lack of Preventive Maint & Periodic Insps, Per 10CFR50.73.Rept Was Evaluated & Determined Reportable on 980720.W/o Encl | 14 August 1998 | Forwards LER 98-007-00, Inoperable Intake Screen & Pump House Floor Drain Check Valves Due to Lack of Preventive Maint & Periodic Insps, Per 10CFR50.73.Rept Was Evaluated & Determined Reportable on 980720.W/o Encl | |
05000289/LER-1998-008, Forwards LER 98-008-00,re Radiation Monitor RM-A8G-High Which Was Inoperable for More than 7 Days Due to Less than Adequate Performance of Calibr Surveillance | 14 September 1998 | Forwards LER 98-008-00,re Radiation Monitor RM-A8G-High Which Was Inoperable for More than 7 Days Due to Less than Adequate Performance of Calibr Surveillance | |
05000289/LER-1998-009, Forwards LER 98-009-00 Re Potential Loss of HPI During Postulated LOCA with Most Limiting Single Failure.Caused by Misapplication of Design Inputs When Operating Procedures Were Changed Prior to Startup for Current Operating Cy | 18 September 1998 | Forwards LER 98-009-00 Re Potential Loss of HPI During Postulated LOCA with Most Limiting Single Failure.Caused by Misapplication of Design Inputs When Operating Procedures Were Changed Prior to Startup for Current Operating Cycle | |
05000289/LER-1998-010, Forwards LER 98-010-00 Re Potential Violation of Design Criteria During Single Auxiliary Transformer Operation Reported on 980825.Second & Associated Issue Was Identified & Reported on 980916,as Suppl Info IAW 10CFR50.72(c) | 9 October 1998 | Forwards LER 98-010-00 Re Potential Violation of Design Criteria During Single Auxiliary Transformer Operation Reported on 980825.Second & Associated Issue Was Identified & Reported on 980916,as Suppl Info IAW 10CFR50.72(c) | |
05000289/LER-1998-011, Forwards LER 98-011-01,which Updates & Replaces Info Re Thermo-Lag Fire Barriers Found Installed Outside Approved Joint Arrangement.Rept Was Determined Reportable on 980825 & Reported Via LER 98-011-00 on 980923 | 12 April 1999 | Forwards LER 98-011-01,which Updates & Replaces Info Re Thermo-Lag Fire Barriers Found Installed Outside Approved Joint Arrangement.Rept Was Determined Reportable on 980825 & Reported Via LER 98-011-00 on 980923 | Fire Barrier |
05000289/LER-1998-012, Forwards LER 98-012-00 Re CR Damper in Control Bldg Habitability Emergency Ventilation Envelope That Was Discovered Out of Position.Event Did Not Adversely Affect Health & Safety of Public | 25 September 1998 | Forwards LER 98-012-00 Re CR Damper in Control Bldg Habitability Emergency Ventilation Envelope That Was Discovered Out of Position.Event Did Not Adversely Affect Health & Safety of Public | |
05000289/LER-1998-013, Forwards LER 98-013-01 Re Failure to Perform Fire Protection Program Surveillances at Required Frequency.Completed Corrective Actions Described in Section Viii of Attached Rept Constitute Commitments Made to Reduce Occurrence | 22 January 1999 | Forwards LER 98-013-01 Re Failure to Perform Fire Protection Program Surveillances at Required Frequency.Completed Corrective Actions Described in Section Viii of Attached Rept Constitute Commitments Made to Reduce Occurrence | Fire Protection Program |
05000289/LER-1999-001, Forwards LER 99-001-00,re Short Sections of Piping Were Below Temps Specified in FSAR Section 9.2.1.2.LER Is follow-up to Notification Made Via ENS Telephone to NRC on 990122 | 19 February 1999 | Forwards LER 99-001-00,re Short Sections of Piping Were Below Temps Specified in FSAR Section 9.2.1.2.LER Is follow-up to Notification Made Via ENS Telephone to NRC on 990122 | Boric Acid |
05000289/LER-1999-003, Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC | 7 May 1999 | Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC | |
05000289/LER-1999-004, Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT | 9 June 1999 | Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT | |
05000289/LER-1999-006, Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements | 23 June 1999 | Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements | |
05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface | 20 August 1999 | Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface | |
05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public | 2 July 1999 | Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public | Boric Acid |
05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section | 22 July 1999 | Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section | |
05000320/LER-1982-015, Forwards LER 82-015/01L-0 | 18 June 1982 | Forwards LER 82-015/01L-0 | |
05000320/LER-1982-016, Forwards LER 82-016/03L-0 | 18 June 1982 | Forwards LER 82-016/03L-0 | |
05000320/LER-1982-017, Forwards LER 82-017/03L-0 | 24 June 1982 | Forwards LER 82-017/03L-0 | |
05000320/LER-1982-018, Forwards LER 82-018/03L-0 | 30 June 1982 | Forwards LER 82-018/03L-0 | |
05000320/LER-1982-019, Forwards LER 82-019/03L-0 | 30 June 1982 | Forwards LER 82-019/03L-0 | |
05000320/LER-1982-020, Forwards LER 82-020/01L-0 | 26 July 1982 | Forwards LER 82-020/01L-0 | |
05000320/LER-1982-022, Forwards LER 82-022/03L-0 | 12 July 1982 | Forwards LER 82-022/03L-0 | |
05000320/LER-1982-023, Forwards LER 82-023/03L-0 | 29 July 1982 | Forwards LER 82-023/03L-0 | |