05000352/LER-1995-002, Forwards LER 95-002 Re Automatic RPS Actuations on Both Units Resulted from Offsite Electrical Transmission Sys Disturbance15 June 1995Forwards LER 95-002 Re Automatic RPS Actuations on Both Units Resulted from Offsite Electrical Transmission Sys Disturbance
05000352/LER-1995-003, Forwards LER 95-003 Re Unit 1 Maximum Power Level of 100% Was Exceeded by Approx 3.4%18 August 1995Forwards LER 95-003 Re Unit 1 Maximum Power Level of 100% Was Exceeded by Approx 3.4%
05000352/LER-1995-007, Forwards LER 95-007,discussing Condition Prohibited by TS Due to Personnel Error2 October 1995Forwards LER 95-007,discussing Condition Prohibited by TS Due to Personnel Error
05000352/LER-1996-006, Forwards LER 96-006-01 Re Multiple Instances of Loss of Safety Function of Control Room Emergency Fresh Air Sys, Resulting in Operating Conditions Prohibited by Tech Specs19 March 1996Forwards LER 96-006-01 Re Multiple Instances of Loss of Safety Function of Control Room Emergency Fresh Air Sys, Resulting in Operating Conditions Prohibited by Tech Specs
05000352/LER-1996-018, Forwards LER 96-018-01 Which Discusses Event That Occurred on 960925 Re Inoperability of HPCI Sys Due to Loss of HPCI Turbine Speed Signal Caused by Loose Speed Sensor Connector3 February 1997Forwards LER 96-018-01 Which Discusses Event That Occurred on 960925 Re Inoperability of HPCI Sys Due to Loss of HPCI Turbine Speed Signal Caused by Loose Speed Sensor Connector
05000352/LER-1996-019, Forwards LER 96-019 Which Repts Operation Prohibited by TS in That Certain Previously Established Surveillance Testing for EDG Did Not Fully Verify Capability to Reject Specified Electrical Load of RHR Pump Motor11 November 1996Forwards LER 96-019 Which Repts Operation Prohibited by TS in That Certain Previously Established Surveillance Testing for EDG Did Not Fully Verify Capability to Reject Specified Electrical Load of RHR Pump Motor
05000352/LER-1996-021, Forwards LER 96-021-01 Re Ability to Achieve Safe Shutdown in Event of Fire as Provided by Fire Protection Program11 April 1997Forwards LER 96-021-01 Re Ability to Achieve Safe Shutdown in Event of Fire as Provided by Fire Protection ProgramSafe Shutdown
Fire Protection Program
05000352/LER-1996-022, Forwards LER 96-022-01 Re Event Which Occurred on 961102 Re Amount of Fuel Oil Contained in D14 EDG Fuel Oil Storage Tank.Challenging Method for Determining Tank Oil Level Resulted in Operator Obtaining an Incorrect Level Readi30 January 1997Forwards LER 96-022-01 Re Event Which Occurred on 961102 Re Amount of Fuel Oil Contained in D14 EDG Fuel Oil Storage Tank.Challenging Method for Determining Tank Oil Level Resulted in Operator Obtaining an Incorrect Level Reading
05000352/LER-1997-003, Forwards Rev 1 to LER 97-003 Re Degraded Back Pressure Dampers Needed for Pipe Rupture Mitigation Resulted in Operation Being Outside Design Basis.Cause & Corrective Action Discussed12 May 1997Forwards Rev 1 to LER 97-003 Re Degraded Back Pressure Dampers Needed for Pipe Rupture Mitigation Resulted in Operation Being Outside Design Basis.Cause & Corrective Action Discussed
05000352/LER-1997-005, Forwards LER 97-005-01 Which Documents Two Separate Unit 1 Primary Containment & Reactor Vessel Isolation Control Sys Actuations.Changes to Corrective Actions Indicated by Rev Bar in Left Hand Margin9 June 1997Forwards LER 97-005-01 Which Documents Two Separate Unit 1 Primary Containment & Reactor Vessel Isolation Control Sys Actuations.Changes to Corrective Actions Indicated by Rev Bar in Left Hand Margin
05000352/LER-1997-006, Forwards LER 97-006-01 Re Discovery That Fire Protection Sys Deluge Valve May Not Have Functioned Per Design Since Issuance of License.Revised LER Provides Cause & Corrective Actions for Event.Changes Indicated by Rev Bars17 September 1997Forwards LER 97-006-01 Re Discovery That Fire Protection Sys Deluge Valve May Not Have Functioned Per Design Since Issuance of License.Revised LER Provides Cause & Corrective Actions for Event.Changes Indicated by Rev Bars
05000352/LER-1997-007, Forwards LER 97-007-00 Reporting Unit 1 Primary Containment & Reactor Vessel Isolation Control Sys Actuation Resulting in RWCU Sys Isolation.Rwcu Sys Isolation Was Caused by Lifting of 'B' RWCU Filter Demineralizer Influent Psv9 October 1997Forwards LER 97-007-00 Reporting Unit 1 Primary Containment & Reactor Vessel Isolation Control Sys Actuation Resulting in RWCU Sys Isolation.Rwcu Sys Isolation Was Caused by Lifting of 'B' RWCU Filter Demineralizer Influent Psv
05000352/LER-1997-008, Forwards LER 97-008-00 Which Reports Event That Occurred on 841026 Re Failure to Perform Annual Maint Insps of Portable Fire Extinguishers IAW NFPA 1015 October 1997Forwards LER 97-008-00 Which Reports Event That Occurred on 841026 Re Failure to Perform Annual Maint Insps of Portable Fire Extinguishers IAW NFPA 10
05000352/LER-1997-009, Forwards LER 97-009-00 Which Documents Event That Occurred at Lgs,Units 1 & 2 on 97101517 November 1997Forwards LER 97-009-00 Which Documents Event That Occurred at Lgs,Units 1 & 2 on 971015
05000352/LER-1997-010, Forwards LER 97-010-00 Re Condition Outside Design Basis Involving Suppression Chamber Steam Bypass Leakage Path, Which Occurred on 841026 & 89081219 November 1997Forwards LER 97-010-00 Re Condition Outside Design Basis Involving Suppression Chamber Steam Bypass Leakage Path, Which Occurred on 841026 & 890812
05000352/LER-1997-011, Forwards LER 97-011-01,re Condition Prohibited by TS in That There Was Not Enough Assurance That Valve Would Continue to Meet TS Required Stroke Time When Restoring Valve to Operable Status.No New Commitments Made within Ltr10 June 1998Forwards LER 97-011-01,re Condition Prohibited by TS in That There Was Not Enough Assurance That Valve Would Continue to Meet TS Required Stroke Time When Restoring Valve to Operable Status.No New Commitments Made within LtrStroke time
05000352/LER-1997-012, Forwards LER 97-012-00 Re Event Which Resulted from Closure of Instrument Gas Transversing Incore Probe Purge PCIV, Per 10CFR50.73(a)(2)(iv)19 December 1997Forwards LER 97-012-00 Re Event Which Resulted from Closure of Instrument Gas Transversing Incore Probe Purge PCIV, Per 10CFR50.73(a)(2)(iv)
05000352/LER-1997-013, Forwards LER 97-013-01,re Failure to Adequately Test Control Logic for Various Pcivs.No New Commitments Made within Ltr20 July 1998Forwards LER 97-013-01,re Failure to Adequately Test Control Logic for Various Pcivs.No New Commitments Made within Ltr
05000352/LER-1997-014, Forwards LER 97-014-00 Re Trip of RHRSW Sys Due to Spurious Trip Signal Generated by B Radiation Monitor21 January 1998Forwards LER 97-014-00 Re Trip of RHRSW Sys Due to Spurious Trip Signal Generated by B Radiation Monitor
05000352/LER-1998-001, Forwards LER 98-001-00 Re Actuation Occurred in Response to Removal of Banana Jack During Rhrs Troubleshooting.Ler Submitted,Per Requirements of 10CFR50.73(a)(2)(v)23 February 1998Forwards LER 98-001-00 Re Actuation Occurred in Response to Removal of Banana Jack During Rhrs Troubleshooting.Ler Submitted,Per Requirements of 10CFR50.73(a)(2)(v)
05000352/LER-1998-002, Forwards LER 98-002-00,re Primary Containment & Reactor Vessel Isolation Control Sys Actuation Which Occurred on 9802069 March 1998Forwards LER 98-002-00,re Primary Containment & Reactor Vessel Isolation Control Sys Actuation Which Occurred on 980206
05000352/LER-1998-003, Forwards LER 98-003-00,re Primary Containment & Rv Isolation Control Sys,Engineered Safety Feature on 98021313 March 1998Forwards LER 98-003-00,re Primary Containment & Rv Isolation Control Sys,Engineered Safety Feature on 980213
05000352/LER-1998-004, Forwards LER 98-004-00,re Missing Fire Dampers in Ventilation Ductwork Required to Comply W/Fire Protection Program.Ler Being Submitted Per 10CFR50.73(a)(2)(ii)(b) Requirements20 April 1998Forwards LER 98-004-00,re Missing Fire Dampers in Ventilation Ductwork Required to Comply W/Fire Protection Program.Ler Being Submitted Per 10CFR50.73(a)(2)(ii)(b) RequirementsFire Protection Program
05000352/LER-1998-005, Forwards LER 98-005-00 Re Primary Containment & Reactor Vessel Isolation Control Sys Actuation on 98032221 April 1998Forwards LER 98-005-00 Re Primary Containment & Reactor Vessel Isolation Control Sys Actuation on 980322
05000352/LER-1998-006, Forwards LER 98-006-00,re Condition Prohibited by TSs in That TS SR Was Not Completed Following Replacement of Agastat Relay.Rept Is Being Submitted Per 10CFR50.73(a)(2) (I)(B)4 May 1998Forwards LER 98-006-00,re Condition Prohibited by TSs in That TS SR Was Not Completed Following Replacement of Agastat Relay.Rept Is Being Submitted Per 10CFR50.73(a)(2) (I)(B)
05000352/LER-1998-007, Forwards LER 98-007-00 Re 980422 Discovery of Three Inoperable Itt Barton Model 580A Differential Switches Which Caused Two or More Independent Trains of Single Safety Sys to Be Inoperable21 May 1998Forwards LER 98-007-00 Re 980422 Discovery of Three Inoperable Itt Barton Model 580A Differential Switches Which Caused Two or More Independent Trains of Single Safety Sys to Be Inoperable
05000352/LER-1998-008, Forwards LER 98-008-01 Re Pressure Setpoint Drift of Thirteen Main Steam Sys SRVs Primarily Caused by Corrosion Induced Bonding within SRVs16 June 1998Forwards LER 98-008-01 Re Pressure Setpoint Drift of Thirteen Main Steam Sys SRVs Primarily Caused by Corrosion Induced Bonding within SRVs
05000352/LER-1998-009, Forwards LER 98-009-00 Re Condition Being Considered to Be Outside of Design Basis,Per 10CFR50.73(a)(2)(ii)(B)5 June 1998Forwards LER 98-009-00 Re Condition Being Considered to Be Outside of Design Basis,Per 10CFR50.73(a)(2)(ii)(B)
05000352/LER-1998-010, Forwards LER 98-010-00 Re Failure to Perform Two Surveillance Tests Related to Rc Recirculation Sys Prior to TS Due Dates.Event Resulted in Condition Prohibited by Tech Specs for Failure to Meet Surveillance Requirements25 June 1998Forwards LER 98-010-00 Re Failure to Perform Two Surveillance Tests Related to Rc Recirculation Sys Prior to TS Due Dates.Event Resulted in Condition Prohibited by Tech Specs for Failure to Meet Surveillance Requirements
05000352/LER-1998-011, Forwards LER 98-011-00,reporting Condition Prohibited by TS Since Failure Investigation Determined That There Was Not Reasonable Assurance That 1B RHR Pump Would Be Able to Perform Intended Safety Function.No New Commitments Ma10 June 1998Forwards LER 98-011-00,reporting Condition Prohibited by TS Since Failure Investigation Determined That There Was Not Reasonable Assurance That 1B RHR Pump Would Be Able to Perform Intended Safety Function.No New Commitments Made
05000352/LER-1998-012, Forwards LER 98-012-00 Re Inoperability of HPCIS,single- Train Safety Sys,Due to Presence of Condensation in Steam Driven Turbine in Standby Condition30 June 1998Forwards LER 98-012-00 Re Inoperability of HPCIS,single- Train Safety Sys,Due to Presence of Condensation in Steam Driven Turbine in Standby Condition
05000352/LER-1998-013, Forwards LER 98-013-00 Re Failure to Meet Max Travel Distance Limitation & Guidance for Class a Extinguisher Replacement W/Hose Stations,For Portable Fire Extinguishers IAW NFPA 10-19756 July 1998Forwards LER 98-013-00 Re Failure to Meet Max Travel Distance Limitation & Guidance for Class a Extinguisher Replacement W/Hose Stations,For Portable Fire Extinguishers IAW NFPA 10-1975
05000352/LER-1998-014, Forwards LER 98-014-00,re Primary Containment & Rv Isolation Control Sys Actuations Which Resulted in RWCU Sys Isolations.Caused by Spurious High Differential Flow Condition While Placing Sys in Svc20 July 1998Forwards LER 98-014-00,re Primary Containment & Rv Isolation Control Sys Actuations Which Resulted in RWCU Sys Isolations.Caused by Spurious High Differential Flow Condition While Placing Sys in Svc
05000352/LER-1998-015, Forwards LER 98-015-00 Re 950216 Determination That Calibr Error for Core Spray Internal Line Break Detection Instrumentation Resulted in Setpoints Being Outside Required TS Limit7 August 1998Forwards LER 98-015-00 Re 950216 Determination That Calibr Error for Core Spray Internal Line Break Detection Instrumentation Resulted in Setpoints Being Outside Required TS Limit
05000352/LER-1998-016, Forwards LER 98-016-00 Re Manual Initiation of CR Ventilation Isolation & Associated CR Emergency Fresh Air Sys Initiation in Response to Small Drywell Chiller Freon Leak That Occurred on 98072826 August 1998Forwards LER 98-016-00 Re Manual Initiation of CR Ventilation Isolation & Associated CR Emergency Fresh Air Sys Initiation in Response to Small Drywell Chiller Freon Leak That Occurred on 980728
05000352/LER-1998-017, Forwards LER 98-017-00 Re Design Deficiency That Rendered Six Fire Protection Sys Hatchway Flow Control Valves Inoperable27 August 1998Forwards LER 98-017-00 Re Design Deficiency That Rendered Six Fire Protection Sys Hatchway Flow Control Valves Inoperable
05000352/LER-1998-018, Forwards LER 98-018-00,reporting Condition Outside Design Basis of Plant & Violation of License Condition 2.C.(3) in That Local Emergency DG Control May Not Be Available to Support Safe Shutdown of Plant in Event of Fire9 October 1998Forwards LER 98-018-00,reporting Condition Outside Design Basis of Plant & Violation of License Condition 2.C.(3) in That Local Emergency DG Control May Not Be Available to Support Safe Shutdown of Plant in Event of FireSafe Shutdown
05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv19 May 1999Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv
05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1 July 1999Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys
05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error12 July 1999Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel ErrorGrab sample
05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator23 July 1999Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator
05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1 September 1999Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed
05000353/LER-1995-003, Forwards LER 95-003,reporting Automatic Closure of Four Unit 2 Drywell Chilled Water Sys Inboard Containment Isolation Valves Due to Inadvertent Loss of Power to Interposing Relay in Closure Circuit for Valves27 February 1995Forwards LER 95-003,reporting Automatic Closure of Four Unit 2 Drywell Chilled Water Sys Inboard Containment Isolation Valves Due to Inadvertent Loss of Power to Interposing Relay in Closure Circuit for Valves
05000353/LER-1995-004, Forwards LER 95-004 Re Engineered Safety Sys Actuation Due to Momentary Spurious Low Rv Water Level Isolation Signal16 March 1995Forwards LER 95-004 Re Engineered Safety Sys Actuation Due to Momentary Spurious Low Rv Water Level Isolation SignalReactor Vessel Water Level
05000353/LER-1995-005, Forwards LER 95-005 Re Blowing of Primary Conatinment & Rv Isolation Control Sys Fuse Due to Malfunctioning +20 Vdc Power Supply16 March 1995Forwards LER 95-005 Re Blowing of Primary Conatinment & Rv Isolation Control Sys Fuse Due to Malfunctioning +20 Vdc Power Supply
05000353/LER-1995-009, Forwards LER 95-009 Concerning Pressure Setpoint Drift of Mss SRV Due to Corrosion Induced Bonding within Valves9 September 1995Forwards LER 95-009 Concerning Pressure Setpoint Drift of Mss SRV Due to Corrosion Induced Bonding within Valves
05000353/LER-1996-008, Forwards LER 96-008-00 Which Documents Event That Occurred at Lgs,Unit 2 on 961214.Commitment Made within Ltr,Listed15 January 1997Forwards LER 96-008-00 Which Documents Event That Occurred at Lgs,Unit 2 on 961214.Commitment Made within Ltr,ListedFire Protection Program
05000353/LER-1996-009, Forwards LER 96-009-00,documenting Event That Occurred at Limerick Generating Station,Unit 2 on 961224.LER Is Being Submitted Pursuant to Requirements of 10CFR50.73(a)(2)(iv)23 January 1997Forwards LER 96-009-00,documenting Event That Occurred at Limerick Generating Station,Unit 2 on 961224.LER Is Being Submitted Pursuant to Requirements of 10CFR50.73(a)(2)(iv)
05000353/LER-1997-004, Forwards LER 97-004-00 Re Failure to Obtain Offgas Sys Grab Sample within TS Time Limit on 930316.Delayed Submittal of LER Is Due to Incorrect Assessment of Reportability at Time of Event7 July 1997Forwards LER 97-004-00 Re Failure to Obtain Offgas Sys Grab Sample within TS Time Limit on 930316.Delayed Submittal of LER Is Due to Incorrect Assessment of Reportability at Time of EventGrab sample
05000353/LER-1997-005, Forwards LER 97-005-00 Re Plant Transient Which Resulted in Exceeding Licensed Thermal Power by 2.4% on 9706057 July 1997Forwards LER 97-005-00 Re Plant Transient Which Resulted in Exceeding Licensed Thermal Power by 2.4% on 970605