GO2-84-047, Responds to NRC Noting Unacceptability of Corrective Action Proposed for Violation a in Insp Rept 50-397/84-09.Containment Entry Will Be Made W/One Air Lock Door Closed at All Times | 24 August 1984 | Responds to NRC Noting Unacceptability of Corrective Action Proposed for Violation a in Insp Rept 50-397/84-09.Containment Entry Will Be Made W/One Air Lock Door Closed at All Times | |
GO2-84-049, Responds to NRC Re Violations Noted in Insp Rept 50-397/84-18.Corrective Actions:Procedure PPM 1.3.9 Revised & Automatic Depressurization Sys Permissive Annunciator Trip Setpoint Changed | 6 September 1984 | Responds to NRC Re Violations Noted in Insp Rept 50-397/84-18.Corrective Actions:Procedure PPM 1.3.9 Revised & Automatic Depressurization Sys Permissive Annunciator Trip Setpoint Changed | |
GO2-84-076, Forwards Amend 34 to FSAR | 15 February 1984 | Forwards Amend 34 to FSAR | |
GO2-84-110, Advises That Insp Item 83-50-04 (from 831214 Insp of Fire Protection Sys) Re Lack of Thermal Lagging on Redundant Electrical Distribution Panels Providing Safe Shutdown Capability Closed.Panels Lagged Prior to Fuel Loading | 5 March 1984 | Advises That Insp Item 83-50-04 (from 831214 Insp of Fire Protection Sys) Re Lack of Thermal Lagging on Redundant Electrical Distribution Panels Providing Safe Shutdown Capability Closed.Panels Lagged Prior to Fuel Loading | Safe Shutdown Exemption Request |
GO2-84-304, Forwards WNP-2 Licensed Operator Requalification Program Description | 15 May 1984 | Forwards WNP-2 Licensed Operator Requalification Program Description | |
GO2-84-385, Requests Extension to 840622 to Respond to Notice of Violation from IE Insp Rept 50-397/84-11 to Complete Internal Review of Violation | 11 June 1984 | Requests Extension to 840622 to Respond to Notice of Violation from IE Insp Rept 50-397/84-11 to Complete Internal Review of Violation | |
GO2-84-424, Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Plant Maint Procedure for Relay Coil Replacement & Contact Adjustment Revised to Prohibit Use of Hfa 51 Relays | 10 July 1984 | Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Plant Maint Procedure for Relay Coil Replacement & Contact Adjustment Revised to Prohibit Use of Hfa 51 Relays | |
GO2-84-426, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-09.Corrective Actions:Air Lock Door Relocked, Air Lock Repaired & Plant Removed from Tech Spec Action Statement 3.6.1.3.9.1 | 12 July 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-09.Corrective Actions:Air Lock Door Relocked, Air Lock Repaired & Plant Removed from Tech Spec Action Statement 3.6.1.3.9.1 | Test box Scram Discharge Volume Fire Protection Program |
GO2-84-433, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-13.Corrective Actions:Specific Instructions Provided to Operating Crews to Ensure Airlock Operation Performed Per Regulatory Requirements | 26 July 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-397/84-13.Corrective Actions:Specific Instructions Provided to Operating Crews to Ensure Airlock Operation Performed Per Regulatory Requirements | |
GO2-84-476, Responds to NRC Re Observations Noted in Insp Rept 50-397/84-15.Corrective Actions:Nonessential Activity in Control Room Limited,Personnel Counseled Re Adherence to Procedures & log-keeping Procedure Revised | 23 August 1984 | Responds to NRC Re Observations Noted in Insp Rept 50-397/84-15.Corrective Actions:Nonessential Activity in Control Room Limited,Personnel Counseled Re Adherence to Procedures & log-keeping Procedure Revised | |
GO2-84-480, Forwards Table of Contents & Apps Inadvertently Omitted from Rev 3 to Guard Training & Qualification Plan,Submitted on 840515.Encls Withheld | 24 August 1984 | Forwards Table of Contents & Apps Inadvertently Omitted from Rev 3 to Guard Training & Qualification Plan,Submitted on 840515.Encls Withheld | |
GO2-84-533, Advises of Plans to Restart Unit 3 in Jul 1985 & Unit 1 in Jul 1986,per 840925 Meeting Re Const Restart.Prior to Meeting,Bpa Released Draft Rept Requesting Addl 27-month Restart Delay.Program Developed for Activity Verification | 8 October 1984 | Advises of Plans to Restart Unit 3 in Jul 1985 & Unit 1 in Jul 1986,per 840925 Meeting Re Const Restart.Prior to Meeting,Bpa Released Draft Rept Requesting Addl 27-month Restart Delay.Program Developed for Activity Verification | |
GO2-84-623, Responds to IE Bulletin 84-03, Refueling Cavity Water Seal. Gross Seal Failure Not Expected Because Critical Components Welded or Bolted in Place.Seven Methods Identified to Move Makeup Water to Fuel Pool & Reactor Well | 30 November 1984 | Responds to IE Bulletin 84-03, Refueling Cavity Water Seal. Gross Seal Failure Not Expected Because Critical Components Welded or Bolted in Place.Seven Methods Identified to Move Makeup Water to Fuel Pool & Reactor Well | Time to boil Fuel cladding Scaffolding |
GO2-84-624, Responds to IE Bulletin 84-03 Re Refueling Cavity Water Seal.Summary Rept Addressing Potential for & Consequences of Refueling Cavity Water Seal Failure Incident Encl | 30 November 1984 | Responds to IE Bulletin 84-03 Re Refueling Cavity Water Seal.Summary Rept Addressing Potential for & Consequences of Refueling Cavity Water Seal Failure Incident Encl | Time to boil Fuel cladding Scaffolding |
GO2-85-207, Forwards Response to Notice of Violation Contained in NRC .Corrective Actions:Diesel Generator Abnormal, Operating & Surveillance Procedures Changed to Include Addl Statement Re Adjustment to Rated Voltage | 17 April 1985 | Forwards Response to Notice of Violation Contained in NRC .Corrective Actions:Diesel Generator Abnormal, Operating & Surveillance Procedures Changed to Include Addl Statement Re Adjustment to Rated Voltage | Unanalyzed Condition |
GO2-85-294, Forwards Annual Emergency Exercise 1985, Providing Objectives & Limitations as 75-day Submittal to Annual Exercise Program.Remaining 45-day Submittal Will Contain Detailed Description of Exercise Scenario | 5 June 1985 | Forwards Annual Emergency Exercise 1985, Providing Objectives & Limitations as 75-day Submittal to Annual Exercise Program.Remaining 45-day Submittal Will Contain Detailed Description of Exercise Scenario | |
GO2-85-409, Responds to Concerns Identified in 850702 Telcon Re Graphic Display Sys & Emergency Dose Protection Sys.Alternative Means of Differentiating Real & Test Data Being Explored. Plant Computer Updated to Improve Response Time | 2 August 1985 | Responds to Concerns Identified in 850702 Telcon Re Graphic Display Sys & Emergency Dose Protection Sys.Alternative Means of Differentiating Real & Test Data Being Explored. Plant Computer Updated to Improve Response Time | |
GO2-86-068, Forwards 1986 Emergency Exercise Representing Complete Scenario Package.W/O Encl | 24 July 1986 | Forwards 1986 Emergency Exercise Representing Complete Scenario Package.W/O Encl | |
GO2-86-069, Discusses Spent Fuel Pool Cooling Sys Identified in Deficiency Rept.Standby Svc Water Connection to Normal Cooling Supply of Fuel Pool Cooling HX Will Be Temporarily Disconnected Until Mods Effected | 29 July 1986 | Discusses Spent Fuel Pool Cooling Sys Identified in Deficiency Rept.Standby Svc Water Connection to Normal Cooling Supply of Fuel Pool Cooling HX Will Be Temporarily Disconnected Until Mods Effected | |
GO2-86-093, Forwards Page Change to Rev 5 of Guard Training & Qualification Plan.Plan Withheld (Ref 10CFR73.21) | 26 September 1986 | Forwards Page Change to Rev 5 of Guard Training & Qualification Plan.Plan Withheld (Ref 10CFR73.21) | |
GO2-86-097, Responds to IE Bulletin 86-003 Re Potential Failure of Multiple ECCS Pumps.Each RHR Sys Has Separate Min Flow Valve & Return Line.Hpcs & Lcps Sys Also Have Separate Min Flow Recirculation Lines | 27 October 1986 | Responds to IE Bulletin 86-003 Re Potential Failure of Multiple ECCS Pumps.Each RHR Sys Has Separate Min Flow Valve & Return Line.Hpcs & Lcps Sys Also Have Separate Min Flow Recirculation Lines | |
GO2-86-101, Forwards 60-day Rept Per IE Bulletin 86-002 Re Static O-Ring (Sor) Differential Pressure Switches.Tests of Four Sor Switches Indicate That Instruments Exhibit well-defined Repeatable Shifts & No Further Special Testing Necessary | 7 November 1986 | Forwards 60-day Rept Per IE Bulletin 86-002 Re Static O-Ring (Sor) Differential Pressure Switches.Tests of Four Sor Switches Indicate That Instruments Exhibit well-defined Repeatable Shifts & No Further Special Testing Necessary | |
GO2-86-105, Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF86A,Spring 1986 & Rev 3 to NDE & I Instruction Qci 6-4, Ultrasonic Exam BWR Nozzle Inner Radius | 4 December 1986 | Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF86A,Spring 1986 & Rev 3 to NDE & I Instruction Qci 6-4, Ultrasonic Exam BWR Nozzle Inner Radius | |
GO2-86-106, Advises That Listed Ref Matls for Use in Preparing Operator License Exam for Ja Landon,Scheduled for 870219,shipped to Recipient on 861124 | 5 December 1986 | Advises That Listed Ref Matls for Use in Preparing Operator License Exam for Ja Landon,Scheduled for 870219,shipped to Recipient on 861124 | |
GO2-86-218, Confirms Commitments Made During 860306 Conference Call Re Evacuation Warning in High Noise Areas.Alerting Devices & Strobe Light/Siren Sys Will Be Installed by 860917,as First Phase of Acoustic Study | 14 March 1986 | Confirms Commitments Made During 860306 Conference Call Re Evacuation Warning in High Noise Areas.Alerting Devices & Strobe Light/Siren Sys Will Be Installed by 860917,as First Phase of Acoustic Study | High Radiation Area |
GO2-86-221, Responds to NRC Re Allegation Noted in Insp Rept 50-397/86-02.Corrective Actions:Plant Mgt Meeting Will Be Held to Heighten ALARA Awareness & Addl ALARA Coordinators Assigned to Cover Annual Plant Outage Work Tasks | 14 March 1986 | Responds to NRC Re Allegation Noted in Insp Rept 50-397/86-02.Corrective Actions:Plant Mgt Meeting Will Be Held to Heighten ALARA Awareness & Addl ALARA Coordinators Assigned to Cover Annual Plant Outage Work Tasks | Scaffolding |
GO2-86-223, Forwards Request for Amend to License NPF-21,revising Physical Security Plan.Request Withheld (Ref 10CFR73.21). Fee Paid | 20 March 1986 | Forwards Request for Amend to License NPF-21,revising Physical Security Plan.Request Withheld (Ref 10CFR73.21). Fee Paid | |
GO2-86-244, Notifies That Plan 55 Will Be Used in Upcoming Refueling Outage for Snubber Testing,In Accordance W/Tech Spec 3/4.7.4.e.3 | 19 March 1986 | Notifies That Plan 55 Will Be Used in Upcoming Refueling Outage for Snubber Testing,In Accordance W/Tech Spec 3/4.7.4.e.3 | |
GO2-86-388, Informs That Visual Exam of Core Spray Spargers Performed During Apr 1986 Refueling Outage,Per Requirements of IE Bulletin 80-13, Cracking in Core Spray Spargers. No Cracking or Other Relevant Conditions Observed | 1 May 1986 | Informs That Visual Exam of Core Spray Spargers Performed During Apr 1986 Refueling Outage,Per Requirements of IE Bulletin 80-13, Cracking in Core Spray Spargers. No Cracking or Other Relevant Conditions Observed | |
GO2-86-418, Responds to NRC Re Violations Noted in Insp Rept 50-397/86-05 & 860415 Enforcement Conference.Corrective Actions:Sample of Changes Made to Fire Protection Items Cross Checked | 9 May 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-397/86-05 & 860415 Enforcement Conference.Corrective Actions:Sample of Changes Made to Fire Protection Items Cross Checked | Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program Backfit |
GO2-86-493, Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Info Encl Satisfies Items a-e of Bulletin | 1 October 1986 | Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Info Encl Satisfies Items a-e of Bulletin | Anchor Darling |
GO2-86-503, Discusses IE Bulletin 85-003.Response Deferred Until 860528,per Determination That Participation in BWR Owners Group Program Warranted.Addl Submittals Will Be Made Re BWR Owners Group Final Rept Scheduled for Sept 1986 | 28 May 1986 | Discusses IE Bulletin 85-003.Response Deferred Until 860528,per Determination That Participation in BWR Owners Group Program Warranted.Addl Submittals Will Be Made Re BWR Owners Group Final Rept Scheduled for Sept 1986 | |
GO2-86-512, Responds to IE Bulletin 86-001 Re Min Flow Logic That Could Disable RHR Pumps.Since No Control cross-connect Exists Between RHR & Valves,Issue Not of Concern for Facility.No Instructions to Shifts or Corrective Actions Needed | 30 May 1986 | Responds to IE Bulletin 86-001 Re Min Flow Logic That Could Disable RHR Pumps.Since No Control cross-connect Exists Between RHR & Valves,Issue Not of Concern for Facility.No Instructions to Shifts or Corrective Actions Needed | |
GO2-86-645, Responds to Equipment Qualification Audit/Insp NRC-IR-86-12 on 860428-0502.Corrective Actions:Ler Re safety-related Motor Operators Being Prepared & Exam & Corrective Action Completed on 147 safety-related Limitorque Motor Operators | 10 July 1986 | Responds to Equipment Qualification Audit/Insp NRC-IR-86-12 on 860428-0502.Corrective Actions:Ler Re safety-related Motor Operators Being Prepared & Exam & Corrective Action Completed on 147 safety-related Limitorque Motor Operators | |
GO2-86-696, Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant | 29 July 1986 | Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant | |
GO2-86-697, Informs That Commitment to Upgrade 1 H Cable Tray Fire Barrier Installation for Safe Shutdown Equipment Cables to 3 H Fire Barrier Capability by Jul 1986 Delayed Until 860825 | 29 July 1986 | Informs That Commitment to Upgrade 1 H Cable Tray Fire Barrier Installation for Safe Shutdown Equipment Cables to 3 H Fire Barrier Capability by Jul 1986 Delayed Until 860825 | Safe Shutdown Fire Barrier Hourly Fire Watch |
GO2-86-811, Responds to NRC Re Violations Noted in Insp Rept 50-397/86-23.Corrective Actions:All Controlled Vacuum Cleaners Removed from Svc & Placed in Controlled Storage as of 860701 & Will Not Be Used Until Actions Completed | 20 August 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-397/86-23.Corrective Actions:All Controlled Vacuum Cleaners Removed from Svc & Placed in Controlled Storage as of 860701 & Will Not Be Used Until Actions Completed | |
GO2-86-943, Forwards Info in Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, Items a-e,per Util 860528 & BWR Owners Group s | 1 October 1986 | Forwards Info in Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, Items a-e,per Util 860528 & BWR Owners Group s | Anchor Darling |
GO2-87-000, Informs That Due to Listed Difficulties,Comprehensive Reevaluation of Fire Protection Program Will Not Be Available as Scheduled.Ebasco Svcs,Inc Retained as Consultant for Review.Final Rept Anticipated by 870227 | 2 January 1987 | Informs That Due to Listed Difficulties,Comprehensive Reevaluation of Fire Protection Program Will Not Be Available as Scheduled.Ebasco Svcs,Inc Retained as Consultant for Review.Final Rept Anticipated by 870227 | Fire Protection Program |
GO2-87-005, Notifies That Addl Sealed Neutron Sources Will Be Transferred from Units 1 & 3/5 to Unit 2 for Storage. Applicable Portions of 10CFR70 Will Be Applied in Transfer | 13 February 1987 | Notifies That Addl Sealed Neutron Sources Will Be Transferred from Units 1 & 3/5 to Unit 2 for Storage. Applicable Portions of 10CFR70 Will Be Applied in Transfer | |
GO2-87-020, Forwards WNP-2 Annual Emergency Exercise 1987 Objectives & Limitations as First Submittal to Annual Exercise Program. Remaining Submittal Will Contain Detailed Description of Exercise Scenario & Anticipated Actions | 17 June 1987 | Forwards WNP-2 Annual Emergency Exercise 1987 Objectives & Limitations as First Submittal to Annual Exercise Program. Remaining Submittal Will Contain Detailed Description of Exercise Scenario & Anticipated Actions | |
GO2-87-084, Advises That Copies of Jd Martin 841018 & s to JB Martin,Nrc,Being Sent Under Separate Cover to Jo Bradfute Per Request | 12 March 1987 | Advises That Copies of Jd Martin 841018 & s to JB Martin,Nrc,Being Sent Under Separate Cover to Jo Bradfute Per Request | |
GO2-88-052, Reiterates Commitments Made in 880301 Meeting in Walnut Creek,Ca & Provides Results of Util Reactor Bldg Response Analysis & Operability Verification Program Per Gw Knighton Request | 5 March 1988 | Reiterates Commitments Made in 880301 Meeting in Walnut Creek,Ca & Provides Results of Util Reactor Bldg Response Analysis & Operability Verification Program Per Gw Knighton Request | |
GO2-88-078, Forwards Rev 6 to Facility Guard Training & Qualification Plan.Rev Describes Changes Made as Result of in-depth Supervisory Job/Task Analysis & Other Administrative & Procedural Changes.Rev Withheld (10CFR73.21) | 4 April 1988 | Forwards Rev 6 to Facility Guard Training & Qualification Plan.Rev Describes Changes Made as Result of in-depth Supervisory Job/Task Analysis & Other Administrative & Procedural Changes.Rev Withheld (10CFR73.21) | |
GO2-88-095, Advises That Plan 37 Described in Tech Spec 3/4.7.4 Will Be Used in Refueling Outage for Snubber Testing | 22 April 1988 | Advises That Plan 37 Described in Tech Spec 3/4.7.4 Will Be Used in Refueling Outage for Snubber Testing | |
GO2-89-108, Forwards Rev 14 to Plant Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | 15 June 1989 | Forwards Rev 14 to Plant Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
GO2-89-131, Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld | 31 July 1989 | Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld | |
GO2-89-142, Forwards Rev 7 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) | 15 August 1989 | Forwards Rev 7 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) | |
GO2-90-195, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld | 28 November 1990 | Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld | |
GO2-91-008, Forwards Rev 8 to Guard Training & Qualification Plan.Rev Withheld | 17 January 1991 | Forwards Rev 8 to Guard Training & Qualification Plan.Rev Withheld | |