Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000254/FIN-2015201-01 | Security | ||
05000254/FIN-2015405-01 | Security | ||
05000254/FIN-2016001-01 | Failure to Control Deviation from EQ Standard Results in Limit Switch Submergence | Significance Determination Process | |
05000254/FIN-2016001-02 | Failure to Identify Structures, Systems, and Components as Safety-Related | Significance Determination Process | |
05000254/FIN-2016002-01 | Failure to Maintain Parameters within Limits of TS 3.6.2.5 and 3.6.3.1 | Significance Determination Process | |
05000254/FIN-2016002-02 | Failure to Identify Conditions Adverse to Quality | Condition Adverse to Quality | |
05000254/FIN-2016004-01 | Failure to Implement Foreign Materials Exclusion Controls | Foreign Material Exclusion | |
05000254/FIN-2016008-01 | Failure to Provide Appropriate Operating Instructions for Aligning a Battery Charger to the Station Black-Out Diesel Generator | ||
05000254/FIN-2016008-02 | Failure to Evaluate the Target Rock Relief Valve Accumulator per ASME Code | ||
05000254/FIN-2017001-01 | Failure to Ensure Hardware Secure for Breaker MOC Switch Linkage | Significance Determination Process | |
05000254/FIN-2017002-01 | Failure to Establish aProcedure Appropriate for Calibration of RCIC Governor | Significance Determination Process | |
05000254/FIN-2017002-02 | Failure to Ensure Two Low Pressure ECCS Systems Operable in MODE 4 | Significance Determination Process | |
05000254/FIN-2017002-03 | Failure to Justify MSIV Maintenance Deferral | Significance Determination Process | |
05000254/FIN-2017002-04 | Failure to have Adequate Guidance in the Fire/Explosion Response Procedure | Significance Determination Process | |
05000254/FIN-2017004-01 | Repeat Use of Written Exams during Licensed Operator Requalification Examinations | Job Performance Measure | |
05000254/FIN-2018001-01 | Repeat Use of Written Exams During Licensed Operator Requalification Examinations | ||
05000254/FIN-2018001-03 | Half Scram Due to Low Voltage on 24/48 Vdc System | Half scram | |
05000254/FIN-2018001-04 | Enforcement Action: EA18021: EDG Non-conformance for Tornado Missiles (EGM 15002) | Unanalyzed Condition High winds Tornado Missile Enforcement Discretion FLEX Tornado Generated Missile Tornado Missile Protection Earthquake | |
05000254/FIN-2018002-01 | Failure to Have a Procedure Appropriate to Circumstances for Degraded Voltage Relays | ||
05000254/FIN-2018003-01 | Failure to Maintain the Design Basis for Residual Heat Removal Torus Suction Valve | ||
05000254/FIN-2018003-02 | Failure to Follow Procedures for Forced Helium Dehydration of a Multipurpose Canister | ||
05000254/FIN-2018010-01 | Minor Violation | ||
05000254/FIN-2018010-02 | Minor Violation | ||
05000254/LER-1976-002, Updated LER 76-002/03L Re Excessive Leakage from Double Gasketed Seal X-4.Initially Reported on 760202.Caused by Equipment Failure & Insufficient Compression.Hatch Bolts Tightened | 3 March 1976 | Updated LER 76-002/03L Re Excessive Leakage from Double Gasketed Seal X-4.Initially Reported on 760202.Caused by Equipment Failure & Insufficient Compression.Hatch Bolts Tightened | |
05000254/LER-1978-027, Forwards LER 78-027/03L-0 | 5 October 1978 | Forwards LER 78-027/03L-0 | |
05000254/LER-1982-009, Forwards LER 82-009/03L-0 | 21 May 1982 | Forwards LER 82-009/03L-0 | |
05000254/LER-1982-010, Forwards LER 82-010/03L-0 | 4 June 1982 | Forwards LER 82-010/03L-0 | |
05000254/LER-1982-012, Forwards LER 82-012/01T-0 | 1 July 1982 | Forwards LER 82-012/01T-0 | |
05000254/LER-1982-013, Forwards LER 82-013/03L-0 | 14 July 1982 | Forwards LER 82-013/03L-0 | |
05000254/LER-1982-014, Forwards LER 82-014/03L-0 | 3 August 1982 | Forwards LER 82-014/03L-0 | |
05000254/LER-1982-015, Forwards LER 82-015/03L-0 | 22 July 1982 | Forwards LER 82-015/03L-0 | |
05000254/LER-1982-016, Forwards LER 82-016/03L-0 | 21 July 1982 | Forwards LER 82-016/03L-0 | |
05000254/LER-1982-017, Forwards LER 82-017/03L-0 | 30 July 1982 | Forwards LER 82-017/03L-0 | |
05000254/LER-1982-018, Forwards LER 82-018/03L-0 | 2 August 1982 | Forwards LER 82-018/03L-0 | |
05000254/LER-1982-019, Forwards LER 82-019/03L-0 | 2 August 1982 | Forwards LER 82-019/03L-0 | |
05000254/LER-1982-020, Forwards LER 82-020/03L-0 | 4 October 1982 | Forwards LER 82-020/03L-0 | |
05000254/LER-1982-021, Forwards LER 82-021/03L-0 | 23 August 1982 | Forwards LER 82-021/03L-0 | |
05000254/LER-1982-022, Supplemental LER 82-022/03L-1:on 820816,maint Outage for 1/2B Diesel Fire Pump Exceeded 7-day Limit.Cause Not Stated. Diesel Pump Wear Rings Replaced | 7 October 1982 | Supplemental LER 82-022/03L-1:on 820816,maint Outage for 1/2B Diesel Fire Pump Exceeded 7-day Limit.Cause Not Stated. Diesel Pump Wear Rings Replaced | |
05000254/LER-1982-023, Forwards LER 82-023/03L-0 | 7 September 1982 | Forwards LER 82-023/03L-0 | |
05000254/LER-1982-024, Forwards LER 82-024/03L-0 | 9 September 1982 | Forwards LER 82-024/03L-0 | |
05000254/LER-1982-025, Forwards LER 82-025/03L-0 | 29 September 1982 | Forwards LER 82-025/03L-0 | |
05000254/LER-1982-026, Forwards Revised LER 82-026/03L-2 | 18 March 1983 | Forwards Revised LER 82-026/03L-2 | |
05000254/LER-1982-027, Forwards LER 82-027/03L-0 | 29 September 1982 | Forwards LER 82-027/03L-0 | |
05000254/LER-1982-028, Forwards LER 82-028/03L-0 | 16 September 1982 | Forwards LER 82-028/03L-0 | |
05000254/LER-1982-029, Forwards LER 82-029/01T-0 | 28 September 1982 | Forwards LER 82-029/01T-0 | |
05000254/LER-1982-030, Forwards LER 82-030/03L-0 | 1 October 1982 | Forwards LER 82-030/03L-0 | |
05000254/LER-1982-031, Forwards LER 82-031/03L-0 | 30 September 1982 | Forwards LER 82-031/03L-0 | |
05000254/LER-1982-032, Forwards LER 82-032/03L-0 | 30 September 1982 | Forwards LER 82-032/03L-0 | |
05000254/LER-1982-034, Forwards LER 82-034/03L-0 | 1 November 1982 | Forwards LER 82-034/03L-0 | |
05000254/LER-1982-035, Forwards LER 82-035/03L-0 | 16 November 1982 | Forwards LER 82-035/03L-0 |