Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20073J22726 September 1994Application for Amend to License DPR-46,consisting of Proposed Change 136,revising TS LCOs 3.5.C.1 & 3.5.C.4 to Increase Min Pressure at Which HPCI Sys Required to Be Operable
ML20079J21530 September 1991Proposed Tech Specs Clarifying Terms Sys & Subsystems as Terms Apply to Core & Containment Cooling Sys,Addl Safety Related Plant Capabilities & Reactor Water Level Trip Settings
ML20082G25231 May 1991Technical Evaluation Rept,Cooper Nuclear Station,Station Blackout Evaluation, Final Rept
ML20106C04628 September 1992Forwards Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in Bwrs. Util Endorses BWR Owners Group Plans.Hardware & Software Mods Should Not Be Implemented Until Significance Determined
ML20107D5234 February 1985Detailed Control Room Design Review Summary Rept
ML20115J98918 July 1996Forwards Summary Rept of Facility Changes,Tests & Experiments Completed IAW 10CFR50.59(b) Requirements for 1995 Period.Rept Includes Changes Incorporated in Rev 14 of USAR
ML20128N14619 February 1993Ack Receipt of Util Response to Generic Ltr 92-04, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWR,
ML20132G16520 December 1996Insp Rept 50-298/96-30 on 961104-1204.No Violations Noted. Major Areas Inspected:Assess Significance of Design Deficiency Described in LER 94-018 & Supplements & Determine If Corrective Actions Sufficient
ML20134L59014 February 1997Provides Corrected Response to 961009,request for Addl Info Re Adequacy & Availability of Design Bases Info for Cooper Nuclear Station
ML20135C30125 February 1997Insp Rept 50-298/96-24 on 961007-970219.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Safety Sys
ML20138L03110 February 1997Forwards Response to 961009 Request for Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info
ML20138R8888 November 1985Exam Rept 50-298/OL-85-04 on 850923-26.Exam Results:Four Senior Reactor Operators Passed Exam & One Failed & Two Reactor Operators Passed Exam & One Failed
ML20148N22228 March 1988Insp Rept 50-298/88-06 on 880201-29.Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings, Operational Safety Verification,Ler Followup,Ie Bulletin 84-02 Followup,Monthly Surveillance & Maint Observations
ML20151E83611 April 1988SALP Rept 50-298/88-01 for 860801-880131
ML20151Q06228 July 1998Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS
ML20151X19017 August 1988Responds to NRC Re Violations Noted in Insp Rept 50-298/88-20.Corrective actions:H-300 Door Closed,Thereby Correcting Violating Condition & Step Added to Shift Supervisor Responsibilities in Procedure 0.16
ML20154R48014 March 1986Insp Rept 50-298/86-01 on 860106-10.Potential Violations Noted:Failure to Have Adequate Procedures for Preventive Maint & Failure to Establish Training Program for Electrical & Mechanical Personnel
ML20196B38517 June 1999Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also Encl
ML20196B47417 June 1999Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610
ML20203P68022 April 1986Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda Encl
ML20207N3668 January 1987Requests Info Sufficient to Demonstrate Adequacy of Sys, Including Alternate Rod Insertion,Standby Liquid Control & Recirculation Pump Trip Sys,Per 10CFR50.62.Safety Evaluation of NEDE-31096-P Encl for Ref
ML20213F06410 November 1986Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl
ML20235H27431 May 1987Mechanical Level Instrument Availability Analysis
ML20236F80224 June 1998Forwards Draft Safety Evaluation on Proposed Conversion of Current TS for CNS to Improved TS (Its).Se Based on Staff Review 970327 Application
ML20236Q06413 July 1998Proposed Tech Specs Re Rev B to Conversion to Improved STS
ML20236Q76614 July 1998Forwards Draft SE Comments Re Proposed Conversion to Improved Std Tech Specs for Plant.Numerous Randomly Numbered Pages of Incoming Submittal Not Included
ML20247L27215 May 1998Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20288A19829 September 2020CN-2020-09-FINAL Written Exam
ML20307A10321 October 2020Report of Change and Summary of 50.54(q) Analyses for Emergency Plan Implementing Procedure 5.7.1, Revision 66
ML20318A16821 October 2020Report of Change and Summary of 50.54( Q) Analyses Emergency Plan Implementing Procedure 5.7.1, Revision 66
ML20324A03929 September 2020CN-2020-09-DRAFT Outlines
ML20324A04129 September 2020CN-2020-09-DRAFT Written Exam
ML21130A06421 April 20210 to Updated Final Safety Analysis Report, USAR Appendix G, Nuclear Safety Operational Analysis
ML21130A06721 April 20210 to Updated Final Safety Analysis Report, Section I, Introduction and Summary
ML21130A06821 April 20210 to Updated Final Safety Analysis Report, USAR Section VII, Control and Instrumentation
ML21130A07021 April 20210 to Updated Final Safety Analysis Report, Section VI, Emergency Core Cooling Systems
ML21130A08321 April 20210 to Updated Final Safety Analysis Report, Section IV, Reactor Coolant System
ML21130A10121 April 20210 to Updated Final Safety Analysis Report, USAR Section Xiv, Station Safety Analysis
ML21208A42225 June 2021CN-2021-06 Final Written Exam
ML21230A34925 June 2021CN-2021-06 Draft Written Exam
ML21340A23620 December 2021Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements
ML23129A26620 April 20231 to Updated Safety Analysis Report, Appendix G, Nuclear Safety Operational Analysis
ML23129A26920 April 20231 to Updated Safety Analysis Report, Section I, Introduction and Summary
ML23129A27020 April 20231 to Updated Safety Analysis Report, Section VII, Control and Instrumentation
ML23129A27220 April 20231 to Updated Safety Analysis Report, Section VI, Emergency Core Cooling Systems
ML23129A28620 April 20231 to Updated Safety Analysis Report, Section IV, Reactor Coolant System
ML23129A30320 April 20231 to Updated Safety Analysis Report, Section Xiv, Station Safety Analysis
NLS2002129, License Amendment Request to Revise TS-Safety Limit Minimum Critical Power Ratio, Cooper Nuclear Station15 November 2002License Amendment Request to Revise TS-Safety Limit Minimum Critical Power Ratio, Cooper Nuclear Station
NLS2004007, License Amendment Request - One-Time Extension of Surveillance Requirements30 January 2004License Amendment Request - One-Time Extension of Surveillance Requirements
NLS2004099, License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio25 October 2004License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio