Issue date | Title | |
---|---|---|
HNP-04-005, Supplemental Information to the RAI Regarding Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. | 19 January 2004 | Supplemental Information to the RAI Regarding Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions. |
HNP-07-119, License Renewal Application, Amendment 2: Changes Resulting from Responses to Site Audit Questions Regarding Time-Limited Aging Analyses | 31 August 2007 | License Renewal Application, Amendment 2: Changes Resulting from Responses to Site Audit Questions Regarding Time-Limited Aging Analyses |
HNP-07-122, Responses to Requests for Additional Information License Renewal Application - Additional Questions Related to Scooping and Screening Methodology & Results | 18 September 2007 | Responses to Requests for Additional Information License Renewal Application - Additional Questions Related to Scooping and Screening Methodology & Results |
HNP-08-015, Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors | 28 February 2008 | Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors |
HNP-08-049, Request for License Amendment Technical Specification 3.7.5a | 30 April 2008 | Request for License Amendment Technical Specification 3.7.5a |
HNP-08-075, Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks | 29 September 2008 | Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks |
HNP-08-119, Non-Security Sensitive Version of Supplement to Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001) Edition | 5 February 2009 | Non-Security Sensitive Version of Supplement to Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001) Edition |
HNP-09-014, Calculation HI-971760, Licensing Report for Expanding Storage Capacity in Harris Spent Fuel Pools C and D. | 22 December 2004 | Calculation HI-971760, Licensing Report for Expanding Storage Capacity in Harris Spent Fuel Pools C and D. |
HNP-09-067, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum Level | 30 June 2009 | Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum Level |
HNP-10-008, Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. | 4 February 2010 | Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. |
HNP-11-038, License Amendment Request for Extension of Refueling Water Storage Tank Allowed Outage Time | 2 September 2011 | License Amendment Request for Extension of Refueling Water Storage Tank Allowed Outage Time |
HNP-12-119, Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 27 November 2012 | Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
HNP-14-035, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 | 27 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 |
HNP-15-086, License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement | 29 October 2015 | License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement |
HNP-15-091, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors | 19 November 2015 | Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors |
HNP-15-102, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. | 17 December 2015 | High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. |
HNP-16-004, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of Nuclear Energy Institute 99-01, Development of Emergency.... | 28 January 2016 | Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of Nuclear Energy Institute 99-01, Development of Emergency.... |
HNP-16-047, Supplement to Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and with Order EA-12-051, Order.... | 29 June 2016 | Supplement to Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and with Order EA-12-051, Order.... |
HNP-16-081, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS 6; SSE with High Frequency Exceedances | 13 October 2016 | Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ˂ SSE with High Frequency Exceedances |
HNP-16-083, Mitigating Strategies Assessment Report for Flooding Hazard Information | 21 December 2016 | Mitigating Strategies Assessment Report for Flooding Hazard Information |
HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis | 19 October 2017 | License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis |
HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses | 18 January 2018 | Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses |
Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites | 5 June 1995 | Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites |
ML021700049 | 4 June 2002 | Joint Appendix Volume II: Pages 542 - 767, Petition to Review a Final Decision of the Nrc. Case Scheduled for Oral Argument September 5, 2002 |
ML063310386 | 7 November 2006 | NFPA 805 Trip Report Handout References |
ML063350276 | 30 November 2006 | Applicant'S Environmental Report - Operating License Renewal Stage |
ML080280567 | 7 January 2008 | January 2008 - Transition to National Fire Protection Association (NFPA) 805 - Example Table B-1, Shearon Harris Nuclear Power Plant, Unit 1, January 7, 2008 |
ML090020420 | 30 November 2008 | NUREG-1916 Vol. 2, Safety Evaluation Report - Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1. |
ML090050172 | 30 November 2008 | NUREG-1916, Volume 1, (1:2) Cover - Chpt 2, Safety Evaluation Report Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1 |
ML100130254 | 14 January 2010 | Second Request for Additional Information Regarding the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plant |
ML101750604 | 28 June 2010 | Redacted - Regarding Adoption of National Fire Protection Association Standard 805 |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A047 | 12 March 2012 | Enclosure 1 - Recommendation 2.1: Seismic |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML13112A020 | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (Order Number EA-12-049) |
ML13364A214 | 12 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML14030A102 | 29 January 2014 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Shearon Harris Nuclear Power Plant, Unit 1, TAC No.: MF0874 |
ML14111A147 | 9 May 2014 | Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights |
ML15022A653 | 26 January 2015 | Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 3, 2015 |
ML15083A024 | 14 April 2015 | Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
ML15126A089 | 30 April 2015 | EAL Bases |
ML15349A149 | 18 December 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluation for Recommendation 2.1 of the Near-Term Task Force Review |
ML15364A544 | 18 February 2016 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific Licensees |
ML16215A227 | 3 August 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 |
ML16291A158 | 19 October 2016 | Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter |
ML17250B238 | 30 August 2017 | TMRE Presubmittal NRC |
ML18003A356 | 18 December 1978 | Forwards Limited Appearance Statement of 781211 Prepared & Submitted by R Pollard of Union of Concerned Scientists. Purpose of Statement to Identify Technical Subjects That Deserve Addl Board Inquiry |
ML18003B153 | 19 July 1985 | Forwards Table Listing Clearances Between Various Bldgs & Max Displacements of Two Adjacent Bldgs,In Response to ACRS Question Re Adequacy of Bldg Clearances During SSE |
ML18003B242 | 31 March 1986 | Sqrt Visit Rept, Informal Rept |
ML18003B307 | 6 June 1986 | Responds to Confirmatory Items Identified in Sser 3 (NUREG-1038),Section 3.10.1, Operability Qualification of Mechanical Equipment. Draft Revised List of Active Valves Expected by 860612.Justification for Qualification Encl |