| Site: | Harris |
| Issue date: | 07/19/1985 |
| From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NLS-85-241, NUDOCS 8507230213 | |
| Download: ML18003B153 (6) | |
Text
3>
Og REGUL 0
INFORMATION DISTRIBUT N
STEM (RIDS)
ACCESSION NBR;8507230213.
DOC,DATES 85/07/19 NOTARIZED'O DOCKET FACIL:50-400 Shear on Harris Nuclear Po~er Planti Unit 1, Carolina 05000400 AUTH,NAME AUTHOR AFFILIATION ZIMtlERMANiS,R, Carolina Power 8, Light Co, REC IP ~ NAME>>
RECIPIENT AFFIL'IATION DENTONiH ~ Re Office, of Nuclear Reactor Regulationi Director V
SUBJECT:
Forwards table listing clearances between various bldgs 8
max displacements of two adjacent bldgsiin response to ACRS question re adequacy of bldg clearances during
- SSE, DISTRIBUTION CODE:
8001D COPIES RECEIVED;LTR ENCL SIZEo TITLE'. Licensing Submittal:
PSAR/FSAR Amdts 8,
R lated Correspondence NOTES!
RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ACRS 41 ELD/HDS1 IE/DEPER/EPB 36 NRR ROEiM ~ L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRA/DS1/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23, RGN2 EXTERNAL: 24X DMB/DSS (AMDTS)
NRC PDR 02-PNL GRUEL'iR COPIES LTTR ENCL' 1
0 6
6 1
0 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
3 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYiB 01 ADM/LFMB IE FILE IE/DQAVT/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 NRR D
RAB 22 E,
04 Rta/DDAMI/MIB BNL(AMDTS ONLY)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
0 1
1 1
0, 1
1 1
1 1
0 1
1 2
2 1
1 1
1 1
1 1
0 1
~
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 TOTAL NUt1BER OF COPIES REQUIRED:
LTTR 52 ENCL
4 R f
~
R d
41, f
Il R I>>, III W 4f, 4 '<<R
~
s 1
<
> '1 f I '4>> 4'tg Ilr I 4 <<Clt '<<!>>'I f 4 'fat'44 >>t>>a j ltt( al I >> f P ) Iall f <<% <<I 'a<<>>'>> I*l If I V >><<<<<< ~ ~ >><<<<>>>><< ~ ~ 41 ~) 4>> 5 I C' <<,jt~, ','ll yt $ 'I R 4 ,4<<P(>> I>>, 'I 'P.',l 'g l g>>>> ftt>>4 1' R f,>>>> fit jf f f fa<<~J ) R ,a t 4 >>R 4 lr I>> jf f t>> l f I I tt a 4 5 f "'<< ftj 1>>t 44>> a I 4 R l tip ~ 1 ao CXQtL Carolina Power & Light Company JUL 1 9 1985 SERIAL: NLS-85-201 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulat on United States Nuclear Regulatory Commission ttVashington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. I - DOCKET NO.50-000 ADEQUACYOF CLEARANCES BETWEEN BUILDINGS
Dear Mr. Denton:
Carolina Power k Light Company hereby submits information demonstrating the adequacy of clearances between adjacent buildings at the Shearon Harris Nuclear Power Plant.
This information is submitted in response to an NRC Advisory Committee on Reactor Safeguards question concerning the adequacy of building clearances during a Safe Shutdown Earthquake (SSE).
The attached table lists the clearances between various buildings and the maximum displacements of two adjacent buildings added together at the interface during a SSE.
The comparison'f numbers in this table demonstrates that adequate clearances exist between the adjacent buildings.
If you have any questions concerning this subject or require additional information, please contact me.
Yours very truly, 3HE/ccc (1675GAS)
Attachment S. R. Zimm rman Manager Nuclear Licensing Section Cct Mr. B. C. Buckley (NRC)
Mr. S. B. Kim (NRC-SGEB)
Mr. G. F. Maxwell (NRC-SHNPP)
Dr. 3. Nelson Grace (NRC-RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F. Read (CHANGE/ELP) ttVake County Public Library Mr. Wells Eddleman Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. O. Bright (ASLB)
Dr. 3. H. Carpenter (ASLB)
Mr. 3. L. Kelley (ASLB) 8507230213 850719 PDR ADOCK 05000400 F
PDR 411 Fayettevilte Street o P. O. Box 1551
~ Raleigh, N. C. 27602
OO f
ATTACHMENT CLEARANCE BETWEEN AD3ACENT BUILDINGS Building Interface Clearance Maximum Displacement Inch Inch RAB Nl - RAB @1@2 RAB Nl - Containment 1
RAB PPI - FHB RAB Nl - Tank Building 1
RAB jjl - Waste Processing Building RAB N IR2 FHB RAB jjlk2-Turbine Building 1
WPB FHB WPB Tank Building 1 FHB Containment 1
FHB - FHB Unloading Building RAB NI - Turbine Building 1 Q El.
286.0'AB NIR2 - Turbine Building 1 Q El.
286.0'ank Building 1 - Turbine Building Q El.
286.0'.21 0.37 0.32 0.18 0.23 0.20 0.71 0.20 0.10 0.28 0.13 0.00 0.39 0.36 (1675GAS/ccc)
0 ~
'