Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000461/20040036 May 2004IR 05000461-04-003, on 03/15/2004 - 04/07/2004, for Clinton Power Station; Identification and Resolution of Problems
IR 05000461/20190102 July 2019Biennial Problem Identification and Resolution Inspection Report 05000461/2019010
IR 05000461/20230038 November 2023Integrated Inspection Report 05000461/2023003
Information Notice 1986-47, Erratic Behavior of Static O Ring Differential Pressure Switches10 June 1986Erratic Behavior of Static O Ring Differential Pressure Switches
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems25 November 1994Inadequate DC Ground Detection in Direct Current Distribution Systems
ML04121091622 April 2004Technical Evaluation of Extending Division 1 and 2 Inverter Completion Time (CT)
ML09294048822 October 2009Ro/Sro August 2009 Written Exam
ML10071046424 August 20092009 Clinton Power Station Initial License Examination ES-401-9 Form
ML12046A87729 August 20112011 Clinton Power Station Administered In-Plant JPMs
ML12047A28329 August 20112011 Clinton Power Station Initial License Examination Proposed JPMs
ML12047A34129 August 20112011 Clinton Power Station Initial License Examination Proposed Written Exam
ML13255A11721 June 20132013 Clinton Power Station Initial License Examination Proposed Control Room and In-Plant Systems JPMs
ML13291A03327 August 20132013 Clinton Power Station Initial License Examination As-Administered Control Room and In-Plant Systems JPMs
ML15217A04519 August 20152015 Clinton Power Station Initial License Examination Re-Take Proposed Control Room JPMs
ML15272A14521 August 20152015 Clinton Power Station Initial License Examination Administered JPMs
ML17108A4289 February 20172017 Clinton Power Station Initial Licensed Operator Examination Proposed Written Exam
ML17116A0819 February 20172017 Clinton Power Station Initial Licensed Operator Examination As-Administered Written Exam
ML20134L42127 August 1985Exam Rept 50-461/OL-85-01 on 850430 & 0624-28.Exam Results: All 18 Candidates Successfully Completed Exams
ML21144A25413 April 2021RO Written Exam
ML21144A26413 April 2021Sim JPM
ML21144A30313 April 2021Administered RO Written Exam
NRC Generic Letter 1991-0927 June 1991NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System
RS-11-054, Additional Information Related to License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing8 April 2011Additional Information Related to License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing
U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included8 October 1999Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included