DCL-03-077, Response to NRC Questions Regarding License Amendment Request 02-03, Spent Fuel Cask Handling24 June 2003Response to NRC Questions Regarding License Amendment Request 02-03, Spent Fuel Cask HandlingSafe Shutdown
Hydrostatic
Earthquake
Control of Heavy Loads
Affidavit
DCL-04-031, Supplement to Special Report 03-04: San Simeon Earthquake of December 22, 200329 March 2004Supplement to Special Report 03-04: San Simeon Earthquake of December 22, 2003Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Scaffolding
DCL-04-046, CFR 50.59 Report of Changes. Tests, and Experiments for the Period January 1, 2002, Through December 31, 200323 April 2004CFR 50.59 Report of Changes. Tests, and Experiments for the Period January 1, 2002, Through December 31, 2003Safe Shutdown
Boric Acid
Non-Destructive Examination
Hydrostatic
Probabilistic Risk Assessment
Control of Heavy Loads
Turbine Missile
DCL-04-165, Special Report 04-02: Steam Generator Tube Plugging During Unit 2 Twelfth Refueling Outage30 November 2004Special Report 04-02: Steam Generator Tube Plugging During Unit 2 Twelfth Refueling Outage
DCL-05-024, Special Report 05-01 - Results of Steam Generator (SG) Tube Inspections Twelfth Refueling Outage for Diablo Canyon Power Plant Unit 216 March 2005Special Report 05-01 - Results of Steam Generator (SG) Tube Inspections Twelfth Refueling Outage for Diablo Canyon Power Plant Unit 2Nondestructive Examination
DCL-06-029, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Unit 1 Thirteenth Refueling Outage24 February 2006Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Unit 1 Thirteenth Refueling OutageBoric Acid
Nondestructive Examination
Finite Element Analysis
DCL-07-061, Pressure and Temperature Limits Report, Revision 78 June 2007Pressure and Temperature Limits Report, Revision 7Stroke time
Hydrostatic
Pressure and Temperature Limits Report
DCL-10-003, Submittal of Progress Report on Shoreline Fault Zone, Central Coastal California13 January 2010Submittal of Progress Report on Shoreline Fault Zone, Central Coastal CaliforniaProbabilistic Risk Assessment
Earthquake
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Cultural Resources Overview for the Diablo Relicensing Study, San Luis Obispo, Monterey, Fresno, Kings and Kern Counties, California28 February 2009Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Cultural Resources Overview for the Diablo Relicensing Study, San Luis Obispo, Monterey, Fresno, Kings and Kern Counties, California
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock31 December 2008Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat ShockVeliger
Biofouling
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish31 December 2009Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish
DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix J, Analysis of Inhibition of Faulting at Fault Branches7 January 2011Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix J, Analysis of Inhibition of Faulting at Fault BranchesEarthquake
DCL-11-097, License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake20 October 2011License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown EarthquakeSafe Shutdown Earthquake
DCL-11-104, Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines.6 June 2008Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines.
DCL-11-104, Attachment 8: Revision 4 to Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related.31 August 2011Attachment 8: Revision 4 to Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related.Safe Shutdown
DCL-11-104, Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification.9 March 2011Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification.
DCL-11-127, Submittal of Control Room Envelope Testing2 December 2011Submittal of Control Room Envelope TestingUnanalyzed Condition
DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 516 April 20122011 Annual Radiological Environmental Operating Report. Part 4 of 5Annual Radiological Environmental Operating Report
DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 5 of 516 April 20122011 Annual Radiological Environmental Operating Report. Part 5 of 5Annual Radiological Environmental Operating Report
DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related.9 May 2012Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related.Cyber Security
Earthquake
DCL-12-069, Diablo Canyon, Units 1 and 2 - 08-0015-SP-001, Functional Requirements Specification, Revision 5, Attachment 230 April 2012Diablo Canyon, Units 1 and 2 - 08-0015-SP-001, Functional Requirements Specification, Revision 5, Attachment 2Safe Shutdown
Anticipated operational occurrence
Earthquake
Fire Protection Program
DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 57 June 2012Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5Cyber Security
DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 67 June 2012Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6
DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-916, V10 Tricon Reference Design Change Analysis, Revision 0, Attachment 419 March 2012Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-916, V10 Tricon Reference Design Change Analysis, Revision 0, Attachment 4
DCL-12-069, Diablo Canyon, Units 1 and 2 - Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 37 June 2012Diablo Canyon, Units 1 and 2 - Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3Safe Shutdown
DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 711 July 2012Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7
DCL-13-016, Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System.31 January 2013Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System.
DCL-13-016, Attachment 5 to DCL-13-016 - WCAP-17706-NP, Revision 0, Westinghouse Setpoint Methodology as Applied to the Diablo Canyon Power Plant.31 January 2013Attachment 5 to DCL-13-016 - WCAP-17706-NP, Revision 0, Westinghouse Setpoint Methodology as Applied to the Diablo Canyon Power Plant.
DCL-13-023, Reactor Coolant System Pressure and Temperature Limits Report12 March 2013Reactor Coolant System Pressure and Temperature Limits ReportStroke time
Hydrostatic
Pressure and Temperature Limits Report
DCL-13-061, PG&E Document, Scm 36-01, Revision 1, Process Protection System Replacement Software Configuration Management Plan (Scmp), Enclosure, Attachment 118 March 2013PG&E Document, Scm 36-01, Revision 1, Process Protection System Replacement Software Configuration Management Plan (Scmp), Enclosure, Attachment 1Post Accident Monitoring
Cyber Security
Earthquake
DCL-13-065, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, (Volume 1 of 2)26 June 2013Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, (Volume 1 of 2)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Mission time
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Fire impairment
Operator Manual Action
NFPA 805
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Large early release frequency
Time Critical Operator Action
Earthquake
Maintenance Rule Program
Fuel cladding
Fire Protection Program
Very Early Warning Fire Detection
DCL-14-011, Reactor Coolant System Pressure and Temperature Limits Report13 February 2014Reactor Coolant System Pressure and Temperature Limits ReportStroke time
Hydrostatic
Pressure and Temperature Limits Report
DCL-14-034, 993754-1-811 (-NP), Revision 1, Failure Modes and Effects Analysis21 February 2014993754-1-811 (-NP), Revision 1, Failure Modes and Effects AnalysisShutdown Margin
Process Control Program
DCL-14-034, 993754-1-812 (-NP), Revision 1, DCPP PPS Validation Test Specification4 April 2014993754-1-812 (-NP), Revision 1, DCPP PPS Validation Test Specification
DCL-14-034, 993754-1-819 (-NP), Revision 0, Reliability Analysis11 October 2013993754-1-819 (-NP), Revision 0, Reliability AnalysisShutdown Margin
Mission time
DCL-14-034, 993754-1-868 (-NP), Revision 1, Software Verification Test Plan3 April 2014993754-1-868 (-NP), Revision 1, Software Verification Test PlanShutdown Margin
DCL-14-081, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 8, Fugro.PGEQ-PR-21 R0 Figures Incl App a 07-31-1410 September 2014Central Coastal California Seismic Imaging Project (Cccsip) Chapter 8, Fugro.PGEQ-PR-21 R0 Figures Incl App a 07-31-14
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction, Figures10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction, Figures
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Figures Incl App A-B 08-05-1410 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Figures Incl App A-B 08-05-14
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Txt.W.Itr10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Txt.W.Itr
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0 Figures 08-10-1410 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0 Figures 08-10-14
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0.Txt.w.ITR10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0.Txt.w.ITR
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0 Figures 08-01-1410 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0 Figures 08-01-14Earthquake
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0.Txt.w.ITRs10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0.Txt.w.ITRsEarthquake
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0 Figures 08-10-1410 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0 Figures 08-10-14
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0.Txt.w.ITR10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0.Txt.w.ITR
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 14, Findings and Conclusions10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 14, Findings and ConclusionsEarthquake
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 App a10 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 App a
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-1410 September 2014Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14Earthquake