DCL-03-077, Response to NRC Questions Regarding License Amendment Request 02-03, Spent Fuel Cask Handling | 24 June 2003 | Response to NRC Questions Regarding License Amendment Request 02-03, Spent Fuel Cask Handling | Safe Shutdown Hydrostatic Earthquake Control of Heavy Loads Affidavit |
DCL-04-031, Supplement to Special Report 03-04: San Simeon Earthquake of December 22, 2003 | 29 March 2004 | Supplement to Special Report 03-04: San Simeon Earthquake of December 22, 2003 | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Scaffolding |
DCL-04-046, CFR 50.59 Report of Changes. Tests, and Experiments for the Period January 1, 2002, Through December 31, 2003 | 23 April 2004 | CFR 50.59 Report of Changes. Tests, and Experiments for the Period January 1, 2002, Through December 31, 2003 | Safe Shutdown Boric Acid Non-Destructive Examination Hydrostatic Probabilistic Risk Assessment Control of Heavy Loads Turbine Missile |
DCL-04-165, Special Report 04-02: Steam Generator Tube Plugging During Unit 2 Twelfth Refueling Outage | 30 November 2004 | Special Report 04-02: Steam Generator Tube Plugging During Unit 2 Twelfth Refueling Outage | |
DCL-05-024, Special Report 05-01 - Results of Steam Generator (SG) Tube Inspections Twelfth Refueling Outage for Diablo Canyon Power Plant Unit 2 | 16 March 2005 | Special Report 05-01 - Results of Steam Generator (SG) Tube Inspections Twelfth Refueling Outage for Diablo Canyon Power Plant Unit 2 | Nondestructive Examination |
DCL-06-029, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Unit 1 Thirteenth Refueling Outage | 24 February 2006 | Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Unit 1 Thirteenth Refueling Outage | Boric Acid Nondestructive Examination Finite Element Analysis |
DCL-07-061, Pressure and Temperature Limits Report, Revision 7 | 8 June 2007 | Pressure and Temperature Limits Report, Revision 7 | Stroke time Hydrostatic Pressure and Temperature Limits Report |
DCL-10-003, Submittal of Progress Report on Shoreline Fault Zone, Central Coastal California | 13 January 2010 | Submittal of Progress Report on Shoreline Fault Zone, Central Coastal California | Probabilistic Risk Assessment Earthquake |
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Cultural Resources Overview for the Diablo Relicensing Study, San Luis Obispo, Monterey, Fresno, Kings and Kern Counties, California | 28 February 2009 | Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Cultural Resources Overview for the Diablo Relicensing Study, San Luis Obispo, Monterey, Fresno, Kings and Kern Counties, California | |
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock | 31 December 2008 | Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock | Veliger Biofouling |
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish | 31 December 2009 | Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish | |
DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix J, Analysis of Inhibition of Faulting at Fault Branches | 7 January 2011 | Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix J, Analysis of Inhibition of Faulting at Fault Branches | Earthquake |
DCL-11-097, License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake | 20 October 2011 | License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake | Safe Shutdown Earthquake |
DCL-11-104, Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines. | 6 June 2008 | Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines. | |
DCL-11-104, Attachment 8: Revision 4 to Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related. | 31 August 2011 | Attachment 8: Revision 4 to Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related. | Safe Shutdown |
DCL-11-104, Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification. | 9 March 2011 | Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification. | |
DCL-11-127, Submittal of Control Room Envelope Testing | 2 December 2011 | Submittal of Control Room Envelope Testing | Unanalyzed Condition |
DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 | 16 April 2012 | 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 | Annual Radiological Environmental Operating Report |
DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 5 of 5 | 16 April 2012 | 2011 Annual Radiological Environmental Operating Report. Part 5 of 5 | Annual Radiological Environmental Operating Report |
DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related. | 9 May 2012 | Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related. | Cyber Security Earthquake |
DCL-12-069, Diablo Canyon, Units 1 and 2 - 08-0015-SP-001, Functional Requirements Specification, Revision 5, Attachment 2 | 30 April 2012 | Diablo Canyon, Units 1 and 2 - 08-0015-SP-001, Functional Requirements Specification, Revision 5, Attachment 2 | Safe Shutdown Anticipated operational occurrence Earthquake Fire Protection Program |
DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 | 7 June 2012 | Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 | Cyber Security |
DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 | 7 June 2012 | Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 | |
DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-916, V10 Tricon Reference Design Change Analysis, Revision 0, Attachment 4 | 19 March 2012 | Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-916, V10 Tricon Reference Design Change Analysis, Revision 0, Attachment 4 | |
DCL-12-069, Diablo Canyon, Units 1 and 2 - Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 | 7 June 2012 | Diablo Canyon, Units 1 and 2 - Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 | Safe Shutdown |
DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 | 11 July 2012 | Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 | |
DCL-13-016, Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System. | 31 January 2013 | Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System. | |
DCL-13-016, Attachment 5 to DCL-13-016 - WCAP-17706-NP, Revision 0, Westinghouse Setpoint Methodology as Applied to the Diablo Canyon Power Plant. | 31 January 2013 | Attachment 5 to DCL-13-016 - WCAP-17706-NP, Revision 0, Westinghouse Setpoint Methodology as Applied to the Diablo Canyon Power Plant. | |
DCL-13-023, Reactor Coolant System Pressure and Temperature Limits Report | 12 March 2013 | Reactor Coolant System Pressure and Temperature Limits Report | Stroke time Hydrostatic Pressure and Temperature Limits Report |
DCL-13-061, PG&E Document, Scm 36-01, Revision 1, Process Protection System Replacement Software Configuration Management Plan (Scmp), Enclosure, Attachment 1 | 18 March 2013 | PG&E Document, Scm 36-01, Revision 1, Process Protection System Replacement Software Configuration Management Plan (Scmp), Enclosure, Attachment 1 | Post Accident Monitoring Cyber Security Earthquake |
DCL-13-065, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, (Volume 1 of 2) | 26 June 2013 | Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, (Volume 1 of 2) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Coatings Fire impairment Operator Manual Action NFPA 805 Multiple Spurious Operation Emergency Lighting Significance Determination Process Large early release frequency Time Critical Operator Action Earthquake Maintenance Rule Program Fuel cladding Fire Protection Program Very Early Warning Fire Detection |
DCL-14-011, Reactor Coolant System Pressure and Temperature Limits Report | 13 February 2014 | Reactor Coolant System Pressure and Temperature Limits Report | Stroke time Hydrostatic Pressure and Temperature Limits Report |
DCL-14-034, 993754-1-811 (-NP), Revision 1, Failure Modes and Effects Analysis | 21 February 2014 | 993754-1-811 (-NP), Revision 1, Failure Modes and Effects Analysis | Shutdown Margin Process Control Program |
DCL-14-034, 993754-1-812 (-NP), Revision 1, DCPP PPS Validation Test Specification | 4 April 2014 | 993754-1-812 (-NP), Revision 1, DCPP PPS Validation Test Specification | |
DCL-14-034, 993754-1-819 (-NP), Revision 0, Reliability Analysis | 11 October 2013 | 993754-1-819 (-NP), Revision 0, Reliability Analysis | Shutdown Margin Mission time |
DCL-14-034, 993754-1-868 (-NP), Revision 1, Software Verification Test Plan | 3 April 2014 | 993754-1-868 (-NP), Revision 1, Software Verification Test Plan | Shutdown Margin |
DCL-14-081, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 8, Fugro.PGEQ-PR-21 R0 Figures Incl App a 07-31-14 | 10 September 2014 | Central Coastal California Seismic Imaging Project (Cccsip) Chapter 8, Fugro.PGEQ-PR-21 R0 Figures Incl App a 07-31-14 | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction, Figures | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction, Figures | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Figures Incl App A-B 08-05-14 | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Figures Incl App A-B 08-05-14 | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Txt.W.Itr | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Txt.W.Itr | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0 Figures 08-10-14 | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0 Figures 08-10-14 | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0.Txt.w.ITR | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0.Txt.w.ITR | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0 Figures 08-01-14 | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0 Figures 08-01-14 | Earthquake |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0.Txt.w.ITRs | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0.Txt.w.ITRs | Earthquake |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0 Figures 08-10-14 | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0 Figures 08-10-14 | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0.Txt.w.ITR | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0.Txt.w.ITR | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 14, Findings and Conclusions | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 14, Findings and Conclusions | Earthquake |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 App a | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 App a | |
DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 | 10 September 2014 | Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 | Earthquake |