Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns | 31 March 1997 | TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure boundary leak Through Wall Leak |
ML19269C666 | 31 August 1978 | Recommendations to NRC on SER for Inservice Insp & Testing Program,Revision 1. Discusses Relief Requests & Specific Evaluations.Concludes Program,As Modified by Rept,Complies W/Asme Standards | Safe Shutdown Loop seal Hydrostatic Exemption Request Liquid penetrant |
ML19327A676 | 31 May 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1-Equipment Classification for All Other Safety-Related Components: Cooper, Technical Evaluation Rept | |
ML19341A333 | 31 October 1980 | Examination of Cracked Turbine Disc from Cooper Nuclear Power Station, Informal Rept | |
ML20023D717 | 2 September 1982 | Inservice Insp Program, Technical Evaluation Rept | Hydrostatic Nondestructive Examination Incorporated by reference Liquid penetrant |
ML20038A769 | 31 October 1981 | Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations | Grab sample Biofouling |
ML20052F666 | 2 March 1982 | Technical Evaluation of Monitoring of Electric Power to Reactor Protection Sys for Cooper Nuclear Station. | |
ML20054E851 | 30 June 1982 | Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Overside of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Cooper Nuclear Power Station | |
ML20065U275 | 1 July 1982 | Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1) for Cooper Nuclear Station, Final Technical Evaluation Rept | |
ML20070Q778 | 31 December 1988 | Nuclear Power Plant Sys Sourcebook,Cooper | |
ML20072A158 | 30 December 1982 | Control of Heavy Loads (C-10),Nebraska Public Power District,Cooper Nuclear Station, Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20076B660 | 28 September 1982 | ECCS Repts (F-47) TMI Action Plan Requirements,Cooper Nuclear Station, Technical Evaluation Rept | |
ML20077M100 | 8 September 1983 | Control of Heavy Loads (C-10),Cooper Nuclear Station, Technical Evaluation Rept | Safe Shutdown Nondestructive Examination Finite Element Analysis Control of Heavy Loads Liquid penetrant |
ML20082G252 | 31 May 1991 | Technical Evaluation Rept,Cooper Nuclear Station,Station Blackout Evaluation, Final Rept | Safe Shutdown Reactor Vessel Water Level Battery sizing |
ML20083A321 | 30 June 1993 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01, Technical Evaluation Rept | |
ML20093M794 | 31 July 1983 | Technical Evaluation of Integrity of Cooper Nuclear Station Reactor Coolant Boundary Piping Sys | |
ML20097F687 | 18 May 1995 | Plant Technical Evaluation Rept on IPE Front End Analysis | Mission time Internal Flooding Probabilistic Risk Assessment |
ML20097F712 | 31 May 1995 | Plant Technical Evaluation Rept on IPE Back-End Submittal | Probabilistic Risk Assessment Hardened vent |
ML20097F727 | 31 May 1995 | Plant Technical Evaluation on IPE Submittal Human Reliability Analysis, Final Rept | Internal Flooding Job Performance Measure Hardened vent |
ML20106F391 | 28 December 1984 | Human Factors Engineering Detailed Control Room Design Review In-Progress Audit,Cooper Nuclear Station | |
ML20112B747 | 31 December 1984 | Conformance to Reg Guide 1.97,Cooper Nuclear Station, Interim Rept | Shutdown Margin Squib |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20132G033 | 26 March 1985 | Dcrdr,Nebraska Public Power District Cooper Nuclear Station, Technical Evaluation Rept | |
ML20151T583 | 9 November 1987 | Technical Evaluation Rept for Spds | |
ML20151Y280 | 30 September 1985 | Second Interval Inservice Insp Program,Cooper Nuclear Station, Technical Evaluation Rept | Hydrostatic Dissimilar Metal Weld |
ML20212A824 | 24 July 1986 | Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Cooper Nuclear Station, Supplementary Technical Evaluation Rept | |
ML20214G408 | 31 March 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Selected GE BWR Plants (Cooper,Dresden 2 & 3,Fermi 2 & Fitzpatrick) | |
ML20214R538 | 31 March 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, Cooper, Informal Rept | |
ML20215M504 | 31 January 1986 | Conformance to Reg Guide 1.97,Cooper Nuclear Station | Squib Fuel cladding |
ML20215N598 | 29 September 1986 | Technical Evaluation Rept of Dcrdr for Cooper Nuclear Station | Emergency Lighting |