 Issue dateTitleTopic
ML20126B43430 January 1980RO 80-001/01T:during Review of Steam Line Break Analysis, Incorrect Assumption Utilized in Zero or Low Power Steam Line Break Analysis Discovered.Cause Unstated.Necessary Mods to Be Implemented Prior to Startup
ML20126L7813 June 1981Ro:On 810603,at Completion of Fuel Handling Activities & W/ Greater than 23 Ft of Water in Reactor Cavity,Svc Water Cooling to Secondary Component Coolers Interrupted for Approx 30 Minutes.No Significant Increase in Temp
ML20155A85924 March 1986Ro:On 860222,dose Equivalent Iodine (I-131) Levels Exceeded 1 Uci/G for 7.5 H After Unit Shutdown on 860221 to Repair Hydrogen Leak in turbine-generator Unit.Peak Activity Spike 1.96 Was Uci/G.Cause Not Stated
ML20198R30520 May 1986Ro:On 860416,dose Equivalent I-131 Activity Exceeded 1.0 Uci/G & Remained Above Level All Day.Letdown Flow Increased Upon Reactor Shut Down in Order to Increase Coolant Cleanup & Reduce I-131 Level
ML20210U87814 May 1986Ro:On 860429,Mensor High Precision Quartz Manometer,Which Provides Containment Pressure Info to Plant Computer,Failed. Mensor Repaired & Returned to Svc.Alternate Calculations Will Continue
ML20212C63815 July 1986Ro:On 860612,plant Tripped When Excess Flow Check Valve Inadvertently Closed.Dose Equivalent Iodine (Dei) Activity Also Exceeded 1 Uci/G.Dei Activity & Plant Operating Characteristics Presented in Tables 1 & 2,respectively
ML20214V7978 September 1986Ro:On 860810,plant Tripped Due to Low Steam Generator Level Following Loss of Static Inverter.On 860811,dose Equivalent I-131 Activity Exceeded 1.0 Uci/G.Dose Equivalent Iodine Activity & Plant Operating Characteristics Encl
ML20234F23626 June 1987Special Rept:Cardox Sys Inoperable for 26 Days Due to Failed Relay in Cable Vault Zone Discovered on 870519.Fire Watch Established.Replacement Relay Installed & Tested on 870611. Cardox Sys Functionally Tested on 870613Fire Watch