ML20024J3083 October 1994Cajun Electric Power Cooperative,Inc Motion to Compel Responses to Interrogatories & Production of Documents.* Requests Board to Issue Order Against Gsu Compelling Production of Listed Items.W/Certificate of SvcSafe Shutdown
ML20041F07711 March 1982Response Opposing La Consumer League 820224 Submittal Re Litigable Interest in Evacuation Plans.Aslb Already Properly Determined Scope of League Interest.No New Info Presented to Justify Different Ruling
ML20056G51526 August 1993NRC Staff Response to Cajun Electric Power Cooperative,Inc Comments,Petition & Amended Petition for Leave to Intervene & Request for Hearing & Conditions,On Notice of Consideration of Issuance of Amend.* W/Certificate of Svc
ML20057A1577 September 1993Reply of Cajun Electric Power Cooperative,Inc to Response of Gulf State Utils Co on Staff Proposed Determination That Requested License Amends Do Not Involve Significant Hazards Consideration within 10CFR50.92.* W/Certificate of Svc
ML20067C5612 December 1982Motion for Extension of Time Until 840115 to File Contentions.Util Requested Extension of CP Until 851231 So That Scedule for OL Hearing Will Probably Slip.Ser Will Not Be Issued Until 831202.Certificate of Svc Encl
ML20072P23826 August 1994Licensee Request for Board Approval of Written Interrogatories to Be Answered by NRC Personnel.* W/Certificate of SvcSafe Shutdown
ML20073H09329 September 1994Gulf States Utils Co Motion to Compel Answers to Interrogatories & Document Production Requests & for Other Relief*. Requests That Board Grant Util Addl Time to Conduct follow-up Discovery Based on Responses.W/Certificate of Svc
ML20073H20730 September 1994Answer of Util to Motion to Compel Production & Provide for Addl Info Discovery.* Informs That Motion Should Be Denied. W/Certificate of Svc
ML20073H21221 September 1994Gulf States Util Co Responses to Cajun First Request for Production of Documents Dtd 940822.W/Certificate of Svc. Related Correspondence
ML20073T1023 May 1983Response to NRC Answer to State of La Contentions 1-6. Reasonable Specificity Requirements of 10CFR2.714(b) Satisfied.Contentions 2 & 5 Premature & Should Be Accepted Conditionally.Certificate of Svc EnclAccidental discharge
ML20076N3147 November 1994Util Motion to Compel Responses to follow-up Discovery Requests & Answer to Motion for Protective Order.* Util Requests That ASLB Issue Order Against Gsu/Eoi Re Discovery Responses.W/Certificate of SvcSafe Shutdown
Zebra Mussel
Emergency Lighting
ML20077C09117 November 1994Gsu Co Answer to Cajun Electric Power Cooperative 941107 Motion to Compel.* Requests Denial of Cajun Electric Power 941107 Motion for Reasons as Stated.W/Certificate of Svc
ML20077P1629 September 1983Objections to 830826 Special Prehearing Conference Order. ASLB Ruling on & Restatement of Designated Contention 2 on Failure of Old River Control Structure May Be Misinterpreted.Certificate of Svc Encl
ML20078C78223 January 1995Cajun Electric Power Cooperative,Inc Concise Statement of Matl Facts to Which Genuine Issue Exists Accompanying & Supporting Answer to Gulf State Utilities Company Motion for Summary Disposition.W/Certificate of SvcSafe Shutdown
ML20078C97528 October 1994Gsu Objections to Cajun Electric Power Cooperative,Inc Followup Discovery Requests & Motion for Protective Order.* Cajun Electric Power Discovery Requests Relate to Matters Outside Proper Scope.W/Certificate of Svc
ML20080G8246 February 1995Cajun Electric Power Cooperative,Inc Answer in Opposition to NRC Staff Response in Support of Gsu Motion for Summary Disposition.* Requests That Aslp Find Staff Response Inadequate.W/Certificate of SvcSafe Shutdown
ML20086P65017 July 1995Joint Motion to Extend Hearing Date & Amend Scheduling Order.* Requests That Prehearing Schedule & Hearing Schedule Be Revised.W/Certificate of Svc
ML20092P2452 July 1984Motion for Withdrawal of OL Application.Rept on Termination of Const Activities & Certificate of Svc Encl
ML20092P7435 July 1984Motion to Compel State of La & Joint Intervenors to Respond to Applicant Interrogatories of Safety Contentions 1 & 2. Certificate of Svc Encl.Related Correspondence
ML20093E46312 July 1984Request for Extension of Time Until 840725 to Answer Applicant First Set of Interrogatories.Certificate of Svc Encl.Related Correspondence
ML20093G34610 October 1995Joint Motion to Extend Hearing Date & Scheduling Order.* Trustee & Gsu Request That Prehearing Schedule & Hearing Schedule Be Revised So That All Depositions Be Completed by 960623.W/Certificate of Svc
ML20096G49916 January 1996Joint Motion to Suspend Procedural Schedule.* Requests That Procedural Schedule in Proceeding Be Suspended,Pending Action by Bankruptcy Court at Following Scheduled Hearing on 960122.W/Certificate of Svc
ML20127M34519 August 1992Response of Gulf States Utilities Co to Nirs 2.206 Petition to Shut Down River Bend Station.* Plant Maintains Fire Protection Which Allows Plant to Operate within NRC Requirements.Request Should Be Denied.W/Certificate of SvcSafe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Emergency Lighting
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML20127M4092 October 1992CP&L Response to Appeal to NRC Commissioners of NRC Staff Denial of Nirs Petitions for Immediate Enforcement Action of 920721 & 0812.* Commission Should Affirm NRR Denial of Nirs Petitions.Certificate of Svc EnclSafe Shutdown
Fire Barrier
Fire Protection Program
ML20155E16325 September 1998Petition Per 10CFR2.206 Requesting That Plant Be Immediately Shut Down & OL Suspended or Modified Until Such Time That Facility Design & Licensing Bases Properly Updated to Permit Operation with Failed Fuel AssembliesUnanalyzed Condition
Anticipated operational occurrence
Feedwater Controller Failure
Earthquake
Fuel cladding