Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-96-491, Oig Event Inquiry - NRC Failure to Adequately Regulate Millstone 1 - Case 95-77I - 951221 | 21 December 1995 | Oig Event Inquiry - NRC Failure to Adequately Regulate Millstone 1 - Case 95-77I - 951221 | |
ML20125A965 | 21 June 1965 | Rept to Advisory Committee on Reactor Safeguards in Matter of Connecticut Light & Power Co-Preliminary Site Evaluation Millstone Point Reactor | |
ML20125B006 | 1 February 1966 | Rept to ACRS in Matter of Connecticut Light & Power Co, Hartford Electric Light Co,Western Massachusetts Electric Co & Millstone Point Co as Participants in Millstone Nuclear Power Station | Earthquake |
ML20129G583 | 30 September 1996 | Handling of Employee Concerns & Allegations at Millstone Nuclear Power Station Units 1,2 & 3 from 1985 - Present | Systematic Assessment of Licensee Performance |
ML20138A799 | 30 November 1985 | Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-MILLSTONE Nuclear Power Station,Unit 1. Docket No. 50-245. (Northeast Nuclear Energy Company) | Hot Short Safe Shutdown Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Earthquake Turbine Missile Pressure Boundary Leakage |
ML20148B329 | 14 March 1988 | Headquarters Daily Rept for 880314 | |
ML20149M338 | 3 September 1996 | OIG Event Inquiry - NRC Staff Actions to Address CU-29 Isolation Valve Issue - Case 96-06S - 960903 | |
ML20149M347 | 21 December 1995 | OIG Event Inquiry - NRC Failure to Adequately Regulate Millstone 1 - Case 95-77I - 951221 | |
ML20205M744 | 12 March 1999 | Rept of Review,Allegations of Discrimination in NRC Ofc of Investigations Cases 1-96-002,1-96-007 & 1-97-007, & Associated Lessons Learned | Enforcement Discretion |
ML20205S060 | 31 March 1999 | Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 | Fuel cladding |
ML20205S066 | 31 March 1999 | Rept on Status of Public Petitions Under 10CFR2.206 with No Status Change from Previous Update,990331, Atlas Corp | |
ML20210U841 | 15 September 1997 | NRC Insp of Unauthorized Access Incident at Millstone Nuclear Power Station | |
ML20211L953 | 30 June 1986 | Risk Evaluation Report:An Overall Review and Evaluation of the Millstone Unit 3 Probabilistic Safety Study | High winds Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake Grace period Backfit Fatality |
ML20212R398 | 30 April 1987 | Integrated Safety Assessment Report,Integrated Safety Assessment Program - Millstone Nuclear Power Station,Unit 1. Docket No. 50-245.(Northeast Nuclear Energy Co).Draft Report | |
ML20214T221 | 25 November 1985 | Initial OL Review Rept:Millstone Point Unit 3 | Coatings Nondestructive Examination Systematic Assessment of Licensee Performance |
ML20216F514 | 31 August 1999 | Rept on Status of Public Petitions Under 10CFR2.206 | Unanalyzed Condition Hydrostatic |
ML20217F998 | 25 March 1998 | Status of Allegation Program FY97 Annual Rept | Systematic Assessment of Licensee Performance |
ML20237L300 | 24 August 1987 | AEOD/E709 Engineering Evaluation Rept Re Auxiliary Feedwater Trips Caused by Low Suction Pressure.Draft Info Notice Encl | Earthquake |