Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-01-112, Registration of Use of Cask to Store Spent Fuel at Dresden, Units 1, 2 & 311 June 2002Registration of Use of Cask to Store Spent Fuel at Dresden, Units 1, 2 & 3
RS-02-002, Registration of Use of Cask to Store Spent Fuel28 January 2002Registration of Use of Cask to Store Spent Fuel
RS-02-009, Completion of Power Uprate Modifications15 March 2002Completion of Power Uprate Modifications
RS-02-015, Communications with NRC Re Quad Cities, Unit 1 Jet Pump Hold Down Beam Replacement Activities & Continued Operation of Quad Cities, Unit 2 & Dresden, Units 2 & 318 January 2002Communications with NRC Re Quad Cities, Unit 1 Jet Pump Hold Down Beam Replacement Activities & Continued Operation of Quad Cities, Unit 2 & Dresden, Units 2 & 3
RS-02-026, Update Concerning Jet Pump Hold Down Beam Activities6 February 2002Update Concerning Jet Pump Hold Down Beam Activities
RS-02-033, Relief Request for Alternative Rules for Corrective Measures If Leakage Occurs at Bolted Connections During System Pressure Tests14 February 2002Relief Request for Alternative Rules for Corrective Measures If Leakage Occurs at Bolted Connections During System Pressure Tests
RS-02-034, Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes13 February 2002Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes
RS-02-035, Supplemental Information Supporting the Request for Exemption from the Secondary Offsite Accident Liability Insurance Requirement of 10 CFR 140.11(a)(4)13 February 2002Supplemental Information Supporting the Request for Exemption from the Secondary Offsite Accident Liability Insurance Requirement of 10 CFR 140.11(a)(4)
RS-02-055, Response to Commission Order to Modify License for Interim Safeguards & Security Measures15 March 2002Response to Commission Order to Modify License for Interim Safeguards & Security Measures
RS-02-067, Power Uprate Ascension Test Report25 March 2002Power Uprate Ascension Test ReportShutdown Margin
Flow Induced Vibration
RS-02-071, Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power Plants9 April 2002Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power PlantsSafe Shutdown
Shutdown Margin
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Temporary Modification
Incorporated by reference
Condition Adverse to Quality
Process Control Program
Operability Determination
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Early Warning Fire Detection
RS-02-082, Station'S Response to Request for Additional Information Re Heavy Loads Handling12 April 2002Station'S Response to Request for Additional Information Re Heavy Loads Handling
RS-02-093, Registration of Use of Cask to Store Spent Fuel15 May 2002Registration of Use of Cask to Store Spent Fuel
RS-02-104, Registration of Use of Cask to Store Spent Fuel3 June 2002Registration of Use of Cask to Store Spent Fuel
RS-02-111, Registration of Use of Cask to Store Spent Fuel11 June 2002Registration of Use of Cask to Store Spent Fuel
RS-02-123, Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.18 July 2002Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-02-124, Additional Information Regarding Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Reactor Vessel Steam Dome Pressure - High)8 July 2002Additional Information Regarding Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Reactor Vessel Steam Dome Pressure - High)Reactor Vessel Water Level
RS-02-125, Letter from Patrick R. Simpson Subject: Supplement to Response to Request for Additional Information Regarding Heavy Loads Handling8 July 2002Letter from Patrick R. Simpson Subject: Supplement to Response to Request for Additional Information Regarding Heavy Loads HandlingSafe Shutdown Earthquake
Operating Basis Earthquake
Control of Heavy Loads
RS-02-128, Request for Exemption from Certain Requirements of 10 CFR 55.592 July 2002Request for Exemption from Certain Requirements of 10 CFR 55.59Job Performance Measure
Exemption Request
RS-02-129, Revision to Request for Exemption from 10CFR 55.598 July 2002Revision to Request for Exemption from 10CFR 55.59Enforcement Discretion
Job Performance Measure
Exemption Request
RS-02-140, Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e1 August 2002Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e
RS-02-146, Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e14 August 2002Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e
RS-02-148, Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan27 August 2002Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan
RS-02-151, Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High)16 August 2002Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High)Reactor Vessel Water Level
Scram Discharge Volume
RS-02-155, Response to NRC Inspection Items Regarding Concrete Expansion Anchors11 September 2002Response to NRC Inspection Items Regarding Concrete Expansion Anchors
RS-02-158, Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures12 September 2002Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures
RS-02-168, Request for License Amendment Related to Heavy Loads Handling26 September 2002Request for License Amendment Related to Heavy Loads HandlingSafe Shutdown
Design basis earthquake
Control of Heavy Loads
Affidavit
RS-02-175, Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements10 October 2002Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements
RS-02-187, Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)25 October 2002Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)VT-2
Liquid penetrant
Through-Wall Leak
RS-02-197, Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads Handling11 November 2002Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads HandlingSafe Shutdown
RS-02-208, Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 113 December 2002Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 1
RS-02-215, Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode20 December 2002Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup ModeScram Discharge Volume
Fuel cladding
RS-03-014, Power Uprate Ascension Test Report23 January 2003Power Uprate Ascension Test ReportShutdown Margin
Flow Induced Vibration
RS-03-016, Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization27 January 2003Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-023, Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit31 January 2003Request for License Amendment Regarding Minimum Critical Power Ratio Safety LimitReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
RS-03-026, Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System31 January 2003Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System
RS-03-036, Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing14 February 2003Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve TestingHydrostatic
Squib
RS-03-038, Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function28 March 2003Request for Amendment to TS for Main Steam Line Low Pressure Isolation FunctionReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
RS-03-051, Additional Information Supporting Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit7 March 2003Additional Information Supporting Request for License Amendment Regarding Minimum Critical Power Ratio Safety LimitAnticipated operational occurrence
Minimum Critical Power Ratio
RS-03-053, Additional Information Supporting the Request for License Amendment Related to Application of Alternatives Source Term28 March 2003Additional Information Supporting the Request for License Amendment Related to Application of Alternatives Source TermBoric Acid
RS-03-061, Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure24 March 2003Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan ProcedureFitness for Duty
Nuclear Accident Reporting System
Severe Accident Management Guideline
RS-03-063, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term21 March 2003Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source TermSevere Accident Management Guideline
RS-03-068, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization26 March 2003Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-070, Additional Information Supporting the Request for License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode28 March 2003Additional Information Supporting the Request for License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode
RS-03-073, Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units31 March 2003Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units
RS-03-088, Clarification of Commitment Regarding Request for Relief30 April 2003Clarification of Commitment Regarding Request for Relief
RS-03-095, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization6 May 2003Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-101, Additional Information Regarding Inservice Inspection Program Relief Request I4R-0229 May 2003Additional Information Regarding Inservice Inspection Program Relief Request I4R-02Probabilistic Risk Assessment
Large early release frequency
RS-03-105, Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode16 May 2003Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode
RS-03-110, Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty3 June 2003Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty