Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ET 09-0026, Notification of Deviation from EPRI Pressurized Water Reactor Secondary Water Chemistry Guidelines | 25 October 2009 | Notification of Deviation from EPRI Pressurized Water Reactor Secondary Water Chemistry Guidelines | |
ET 09-0031, Supplemental Information Regarding NRC Request for Additional Information for Responses to Generic Letter (GL) 2004-02 | 4 November 2009 | Supplemental Information Regarding NRC Request for Additional Information for Responses to Generic Letter (GL) 2004-02 | |
ET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 26 February 2014 | Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Boric Acid Tornado Missile Time to boil FLEX |
ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components | 17 May 2023 | CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components | |
ML042610113 | 13 September 2004 | Plant Engineering Branch Open Items Interim Safety Basis (URI 2002003-01) | Fire Barrier |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML101680659 | 16 June 2010 | 6/16/10 Construction Reactor Oversight Process Category 2 Public Meeting Handout: Baseline Risk Values for Wolf Creek | |
ML101900418 | 28 June 2010 | Quick View Chart | Safe Shutdown Ultimate heat sink Annual Radiological Environmental Operating Report |
ML14307B707 | 10 December 2014 | Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T | Probabilistic Risk Assessment Fukushima Dai-Ichi |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
WM 13-0014, Commitment to NRC Regarding Actions Necessary to Increase Safety Margins Through Ongoing Actions to Resolve Substantive Cross-Cutting Issues (Sccis) | 27 June 2013 | Commitment to NRC Regarding Actions Necessary to Increase Safety Margins Through Ongoing Actions to Resolve Substantive Cross-Cutting Issues (Sccis) | |
WM 14-0013, Voluntary Commitment Regarding Containment Coolers at Wolf Creek Generating Station | 8 May 2014 | Voluntary Commitment Regarding Containment Coolers at Wolf Creek Generating Station | |
WO 14-0032, Supplemental Information for Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis | 26 March 2014 | Supplemental Information for Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis | Boric Acid |