Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000000/LER-1975-004, Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept13 January 1975Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept
05000000/LER-1985-035, Forwards LER 85-035-00 Re Physical Security Event5 June 1985Forwards LER 85-035-00 Re Physical Security Event
05000000/LER-1985-078, Forwards Revised LER 85-078-01 Re Physical Security Event22 November 1985Forwards Revised LER 85-078-01 Re Physical Security Event
05000000/LER-1985-083, Forwards LER 85-083-01.Rept Contains Safeguards Info3 October 1986Forwards LER 85-083-01.Rept Contains Safeguards Info
05000000/LER-1986-008, Forwards LER 86-008-0016 October 1986Forwards LER 86-008-00
05000000/LER-1986-018, Forwards LER 86-018-0014 March 1986Forwards LER 86-018-00
05000000/LER-1986-031, Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)13 June 1986Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-045, Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)8 September 1986Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)
05000000/LER-1986-049, Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)29 September 1986Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)
05000000/LER-1986-054, Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)7 October 1986Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-055, Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)10 October 1986Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)
05000277/LER-1979-002, Forwards LER 79-002/01T-022 January 1979Forwards LER 79-002/01T-0Fire Watch
05000277/LER-1981-002, Forwards LER 81-002/01T-019 January 1981Forwards LER 81-002/01T-0
05000277/LER-1981-013, Forwards LER 81-013/01T-0.Provides Narrative Description of 810203 Occurrence Re Failure of Valves to Meet Seismic Qualification Requirements18 February 1981Forwards LER 81-013/01T-0.Provides Narrative Description of 810203 Occurrence Re Failure of Valves to Meet Seismic Qualification Requirements
05000277/LER-1981-028, Forwards LER 81-028/01T-0.Detailed Event Analysis Also Submitted11 May 1981Forwards LER 81-028/01T-0.Detailed Event Analysis Also SubmittedEarthquake
05000277/LER-1982-011, Forwards LER 82-011/01T-0.Detailed Event Analysis Submitted11 June 1982Forwards LER 82-011/01T-0.Detailed Event Analysis Submitted
05000277/LER-1982-021, Forwards LER 82-021/03L-0.Detailed Event Analysis Encl25 August 1982Forwards LER 82-021/03L-0.Detailed Event Analysis EnclFuel cladding
05000277/LER-1982-027, Forwards LER 82-027/01T-0.Detailed Event Analysis Encl24 September 1982Forwards LER 82-027/01T-0.Detailed Event Analysis Encl
05000277/LER-1982-035, Forwards Revised LER 82-035/01X-1.Revised Detailed Event Analysis Encl8 December 1982Forwards Revised LER 82-035/01X-1.Revised Detailed Event Analysis Encl
05000277/LER-1982-036, Forwards LER 82-036/01T-0.Detailed Event Analysis Submitted8 November 1982Forwards LER 82-036/01T-0.Detailed Event Analysis Submitted
05000277/LER-1982-041, Forwards LER 82-041/01T-0.Detailed Event Analysis Submitted22 December 1982Forwards LER 82-041/01T-0.Detailed Event Analysis Submitted
05000277/LER-1983-001, Forwards LER 83-001/01T-0.Detailed Event Analysis Submitted18 January 1983Forwards LER 83-001/01T-0.Detailed Event Analysis Submitted
05000277/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted8 April 1983Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted
05000277/LER-1993-013, Forwards LER 93-013-00.LER Originally Distributed to All Individuals & Organizations Except DCD Due to Administrative Oversight5 April 1994Forwards LER 93-013-00.LER Originally Distributed to All Individuals & Organizations Except DCD Due to Administrative Oversight
05000277/LER-1997-003, Forwards LER 97-003-00,concerning Inoperability of Hpcis When Wire Lug Was Lifted in Control Circuit on 97060127 June 1997Forwards LER 97-003-00,concerning Inoperability of Hpcis When Wire Lug Was Lifted in Control Circuit on 970601
05000277/LER-1997-004, Forwards LER 97-004-00 Re non-compliance of MCR Emergency Ventilation Sys TS Which Occurred on 97071031 July 1997Forwards LER 97-004-00 Re non-compliance of MCR Emergency Ventilation Sys TS Which Occurred on 970710
05000277/LER-1997-006, Forwards LER-97-006-00,concerning Unplanned ESF Actuation During 4-kV Electrical Bus Relay Testing Activities on 97092321 October 1997Forwards LER-97-006-00,concerning Unplanned ESF Actuation During 4-kV Electrical Bus Relay Testing Activities on 970923
05000277/LER-1997-007, Forwards LER 97-007-00 Which Documents Event That Occurred at Peach Bottom Atomic Power Station,Units 2 & 3 on 74070519 November 1997Forwards LER 97-007-00 Which Documents Event That Occurred at Peach Bottom Atomic Power Station,Units 2 & 3 on 740705Unanalyzed Condition
05000277/LER-1997-008, Forwards LER 97-008-00,reporting Discovery of safety-related Logic Components That Were Not Tested Per TS Surveillance Requirements on 74070526 November 1997Forwards LER 97-008-00,reporting Discovery of safety-related Logic Components That Were Not Tested Per TS Surveillance Requirements on 740705
05000277/LER-1997-009, Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys10 June 1998Forwards LER 97-009-01,reporting Reactor Scram on 971109, Resulting from Generator Lockout Condition & Subsequent Turbine Trip.Rev to Original Submittal & Discussion Anomalies Found w/2A Reactor Feedpump Turbine Trip Sys
05000277/LER-1997-010, Forwards LER 97-010-01,reporting 971229 Failure of 2A Reactor Feedpump Turbine to Trip in Timely Manner10 June 1998Forwards LER 97-010-01,reporting 971229 Failure of 2A Reactor Feedpump Turbine to Trip in Timely Manner
05000277/LER-1998-001, Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump22 April 1998Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump
05000277/LER-1998-002, Forwards Details of LER 98-002-00 Re 980505 Loss of Both Trains of Main CR Emergency Ventilation Sys,Per Requirements of 10CFR50.73(a)(2)(i)(B)4 June 1998Forwards Details of LER 98-002-00 Re 980505 Loss of Both Trains of Main CR Emergency Ventilation Sys,Per Requirements of 10CFR50.73(a)(2)(i)(B)
05000277/LER-1998-003, Forwards LER 98-003-00,which Reports 980513 Failure to Meet TS for Main Crev,Per 10CFR50.73(a)(2)(i)(B)15 June 1998Forwards LER 98-003-00,which Reports 980513 Failure to Meet TS for Main Crev,Per 10CFR50.73(a)(2)(i)(B)
05000277/LER-1998-004, Forwards LER 98-004-00,reporting Failure to Meet TS Surveillance Requirements for One off-site Source Being Inoperable & 10CFR50.73(a)(2)(i)(B)22 July 1998Forwards LER 98-004-00,reporting Failure to Meet TS Surveillance Requirements for One off-site Source Being Inoperable & 10CFR50.73(a)(2)(i)(B)
05000277/LER-1998-005, Forwards LER 98-005-00 Re 980824 Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated29 September 1998Forwards LER 98-005-00 Re 980824 Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated
05000277/LER-1999-003, Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of Flooding16 April 1999Forwards LER 99-003-00 Re 990318 Failure to Maintain Provisions of Fire Protection Program to Properly Address Effects of FloodingFire Protection Program
05000277/LER-1999-004, Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities20 June 1999Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities
05000278/LER-1978-019, Forwards LER 78-019/01T-016 October 1978Forwards LER 78-019/01T-0
05000278/LER-1980-026, Forwards LER 80-026/01T-026 November 1980Forwards LER 80-026/01T-0
05000278/LER-1982-008, Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted18 June 1982Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Submitted8 February 1983Forwards LER 83-002/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted25 March 1983Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted10 February 1983Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-007, Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted17 March 1983Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-011, Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted21 April 1983Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-012, Forwards LER 83-012/-01T-0.Detailed Event Analysis Encl9 May 1983Forwards LER 83-012/-01T-0.Detailed Event Analysis EnclWeld Overlay
05000278/LER-1998-001, Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area22 April 1998Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area
05000278/LER-1998-002, Forwards LER 98-002-00,reporting Failure to Meet TS Requirements for Unit 3 RCIC During Period When Overspeed Trip Function Could Have Resulted in Inadvertent Trip During RCIC Operation22 July 1998Forwards LER 98-002-00,reporting Failure to Meet TS Requirements for Unit 3 RCIC During Period When Overspeed Trip Function Could Have Resulted in Inadvertent Trip During RCIC Operation
05000278/LER-1998-004, Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 98082017 September 1998Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 980820