ML13304A802
| ML13304A802 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 10/29/2013 |
| From: | St.Onge R J Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| SO1 23-VIII-40.100, Rev 19, SO123-VIII-0.200, Rev 17, SO123-VIII-40.200, Rev 7 | |
| Download: ML13304A802 (189) | |
Text
J SOUTHERN CALIFORNIA EDISONAn EDISON INTERN4TIONAL CompanyRichard St. OngeDirector.
Nuclear Regulatory Affairs andEmergency PlanningOctober 29, 201310 CFR 50, Appendix E, Section VU.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, D.C. 20555-0001
Subject:
Docket Nos. 50-206, 50-361, 50-362, and 72-41Emergency Plan Implementing Procedures San Onofre Nuclear Generating Station (SONGS),
Units 1, 2 and 3and Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Pursuant to 10 CFR 50, Appendix E, Section V, Attachment 1 of this letter provides a copy ofthe following revised Emergency Plan documents:
Procedure Rev.SO1 23-VIII-40.100 "DOSEASSESSMENT" SO123-VIII-40.200 "RADDOSE VDOSE ASSESSMENT" SO123-VIII-0.200 EMERGECY PLANDRILLS PL AN EXERCISES SO 123-VI I I-EOF197171Effective DateOctober 1, 2013October 1, 2013October 2, 2013October 8, 2013For your convenience, Attachment 2 provides an updated index listing titles, revisions, andeditorial corrections (ECs) of the SONGS Emergency Plan Implementing Procedures (EPIPs).A bar in the right margin indicates items changed since our previous submittal.
Attachment 3 lists the current Emergency Plan Manuals, Orders and Training Procedures thatare referenced in the Emergency Plan. This document is unchanged since our previoussubmittal.
As specified in 10 CFR 50.54(q)(iv)(5),
Attachment 4 provides a report and analysis summaryfor these EPIP changes.
These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.P.O. Box 128 San Clemente, CA 92674 October 29, 2013Document Control Desk-2-There are no commitments contained in this letter or its attachments.
If you have any questions, please contact Mr. Dan Cleavenger, Emergency Planning Manager,at (949) 368-6643.
Sincerely, Attachments:
- 1. Revised Emergency Plan Implementing Procedures
- 2. SONGS Emergency Plan Implementing Procedures (EPIPs) Index3. SONGS Emergency Plan Referenced
- Manuals, Orders and TrainingProcedures Index4. Report and Analysis Summaries cc: Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)S. A. Reynolds, Acting Regional Administrator, NRC Region IVB. Benney, NRC Project Manager, SONGS Units 2 and 3G. G. Warnick, NRC Senior Resident Inspector, SONGS Units 2 and 3 Attachment 1REVISED EMERGENCY PLAN IMPLEMENTING PROCEDURES Procedure Usage Requirements I SectionsInformation Use
- The user may complete the task from memory. However, the Sections 1.0-3.0,user is responsible for performing the activity according to the 7.0-9.0, andprocedure.
Attachment 2* Information use documents that contain a specific process orderare performed in the given order unless otherwise specified within the document.
Reference Use
- Review and understand the procedure before performing any Sections 4.0-6.0, andsteps, including the prerequisite section.
Attachment 10 Have a copy or applicable pages/sections open at the work site.0 Use Placekeeping method according to S0123-XV-HU-3.
0 If any portion of the document is performed from memory, do soin the sequence specified.
Perform each step as written, exceptwhen an approved process specifically allows deviation.
- Refer to the procedure or instruction at least once to ensurecompletion of the task in accordance with the requirements.
- Review the document at the completion of the task to verify thatall appropriate steps are performed and documented.
Color UsageThis Document Does Not Contain Relevant ColorQA PROGRAM AFFECTING 50.59 DNA / 72.48 DNA / RX DNAProcedure TypeGeneralProcedure OwnerLarry McCann TABLE OF CONTENTSSection Page1.0 PURPOSE AND SCOPE ..............................................................................................
....... 32.0 RESPONSIBILITIES
..........................................................................................................................
33.0 DEFINITIONS
....................................................................................................................................
34.0 PRECAUTIO NS AND LIM ITATIONS
..........................................................................................
55.0 PREREQUISITES
..............................................................................................................................
56.0 PROCEDURE
....................................................................................................................................
66.1 Obtaining a Source Term ...................................................................................................
66.2 Source Term Estim ate Using Radiation Monitor Data .......................................................
66.3 Source Term Assessm ent from Field Team Measurements
..............................................
86.4 Calculating a Dose Assessment
......................................................................................
106.5 Verification of Calculations
...............................................................................................
127.0 ACCEPTANCE CRITERIA
..........................................................................................................
138.0 RETENTIO N OF RECO RDS .....................................................................................................
1
39.0 REFERENCES
/ COM M ITM ENTS ..............................................................................................
13Section PageATTACHMENT 1 Units 2(3) Dose Assessment Calculation W orksheet
...................................................................
162 Sum m ary of Changes .....................................................................................................................
16INFORMATION USE 1.0 PURPOSE AND SCOPE1.1 Identify resources for obtaining a source term and provide a manual method for Technical SupportCenter (TSC) Radiation Protection Leader (RPL) to determine an offsite dose in an accidentsituation.
1.2 This procedure is intended to provide guidance to calculate a dose assessment from a grossactivity source term. The procedure is intended for use as an alternate to the Dose Assessment Computer.
As a quick method, it is not intended to exactly duplicate the Dose Assessment Computer results2.0 RESPONSIBILITIES 2.1 Describe the individual and organization(s) that have responsibilities concerning theaccomplishment of tasks or activities relative to the implementation of the procedure.
3.0 DEFINITIONS
3.1 ARM: Area Radiation Monitor3.2 CAPR: Corrective Action to Prevent Reoccurrence 3.3 CED: Corporate Emergency Director3.4 CEDE: Committed Effective Dose Equivalent 3.5 CDE: Committed Dose Equivalent 3.6 CR: Control Room3.7 DAC: Derived Airborne Concentration 3.8 EAB Exclusion Area Boundary3.9 DACS Dose Assessment Computer System3.10 EOC: Emergency Operations Center3.11 EOF: Emergency Operations Facility3.12 EP: Emergency Plan3.13 EPC: Emergency Planning Coordinator REFERENCE USE 3.14 EPIP: Emergency Plan Implementing Procedure 3.15 ERDS: Emergency Response Data System3.16 ERF: Emergency Response Facility3.17 ERO: Emergency Response Organization 3.18 ERTD: Emergency Response Telephone Directory 3.19 GCC: Grid Control Center3.20 IOC: Irvine Operations Center3.21 KI: Potassium Iodide3.22 NRC: Nuclear Regulatory Commission 3.23 OCA: Owner Controlled Area3.24 ODAC: Offsite Dose Assessment Center3.25 OSLD Optically Stimulated Luminescent Dosimeter 3.26 PA: Protected Area3.27 PAR: Protective Action Recommendation 3.28 PASS: Post-Accident Sampling System3.29 PAZ: Protective Action Zone3.30 RP: Radiation Protection 3.31 SCE: Southern California Edison3.32 SM: Shift Manager3.33 SONGS: San Onofre Nuclear Generating Station3.34 TSC: Technical Support CenterREFERENCE USE 3.35 YPS:Yellow Phone System4.0 PRECAUTIONS AND LIMITATIONS
4.1 Precautions
4.1.1 An elevated release (lofted plume) may occur during cold, stable atmospheric conditions, or during an energetic release (e.g., expelled by fans, steam dumps or steamsafety valves).
If these conditions occur, plume readings close to the plant (0-2 miles, orso) may be lower than expected for a ground level release.
Althoughquantitative changes to dose estimates are not needed, consideration should be madefor effects of plume loft when directing field teams.4.1.2 S0123-VIII-10.3, Protective Actions Recommendations, requires decisions based onTotal Effective Dose Equivalent (TEDE) and Thyroid Committed Dose Equivalent (CDE)dose assessments for the Exclusion Area Boundary (EAB).4.2 Limitations 4.2.1 None5.0 PREREQUISITES 5.1 WHEN NOT in a declared emergency or drill, THEN personnel are responsible for verifying this isthe current copy of this document using one of the methods described in S0123-XV-HU-3.
5.2 VERIFY level of use requirements on the first page of the document.
5.3 Emergency Planning is responsible for ensuring current copy of this document is in emergency notebooks for use during declared emergencies and drills.5.3.1 ERO members must maintain the following task qualifications 0 7L1QWT, TSC RP Leader Qual. Walkthrough (Radiation Protection Leader)REFERENCE USE
6.0 PROCEDURE
NOTE1) Each section of this procedure may be performed independently.
- 2) Potential releases from Unit 2 FHB and Unit 3 FHB utilize a commonplenum before exhausting past their respective RE7865 monitors.
Therefore, this procedure section and Attachment 1 can be used forsingle or multiple unit accidents.
CAUTIONFailure to maintain effective communications with ERO members providing information to you and requiring your input may result in errors in DoseAssessment, Emergency Classifications and/or Protective ActionRecommendation.
6.1 Obtaining a Source Term6.1.16.1.1.16.1.1.26.1.1.3OBTAIN total (Unit 2 and Unit 3) Source Term from TSC Technical Leader or TSCTechnical Team Mitigator, AND PROCEED to Section 6.2.4 of this procedure.
IF TSC Technical Leader or TSC Technical Team Mitigator is NOT available, THENPROCEED to Section 6.2 of this procedure.
IF release is unmonitored, or affected radiation monitors are not available for sourceterm calculations, THEN PROCEED to Section 6. 6.3 of this procedure.
IF release is from Independent Spent Fuel Storage Installation (ISFSI),
THENPROCEED to Section 6.3 of this procedure.
6.2 Source Term Estimate Using Radiation Monitor Data6.2.16.2.1.16.2.1.2IF accident is a FHB, THEN USE PVS radiation monitor for source term calculation.
IF PVS radiation monitor does NOT show an increase, THEN REQUEST a surveyfor an unmonitored release.IF survey results indicate an unmonitored
- release, THEN PROCEED to Section 6.3of this procedure.
REFERENCE USE NOTE1. For Wide Range Gas Monitors (WRGMs),
the [iCi/sec value on "Eff"channel is preferred when calculating a source term. If that channel isnot available, then displayed itCi/cc value for "Lo", "Med" or "Hi"channel should be used as long as those values are in the range of1 E-7 to 1 E-1, 1 E-4 to 1 E+2, or 1 E-1 to 1 E+6 pCi/cc, respectively.
- 2. If the effluent release flow is not known or readily available, then82,000 cfm should be assumed for each monitor 2(3)RE7685, or164,000 cfm should be assumed for monitor 2/3RE7808 at the start ofthe release.CAUTIONUnit 2 and Unit 3 PVSs have a common header, therefore the total releasesource term can be determined using monitor 2/3RE7808 (if on scale), or thesum of monitors 2(3)RE7865.
6.2.2 OBTAIN the following radiation monitor data from CFMS, RTIME Data Viewer,RADDOSE-V, Control Room instrumentation or any other available source ANDRECORD on Section 1, Noble Gas Source Term Calculation, of Attachment 1, Units 2(3)Dose Assessment Calculation Worksheet.
" Radiation monitor(s)
- Activity (pCi/sec or pCI/cc)* Effluent Flow if pCi/sec data is not available 6.2.2.1 IF using Control Room instrumentation and WRGM Effluent channel is available, THEN PRESS "Eff" button and RECORD displayed pCi/sec reading in Attachment 1,Section 1.6.2.2.2 IF using Control Room instrumentation and WRGM Effluent channel is NOTavailable, THEN PRESS "Lo" or "Med" or "Hi" button AND RECORD displayed pCi/cc reading.
PRESS "Mon", "0", "2","9",
and "Item" buttons AND RECORDdisplayed cfm reading in Attachment 1, Section 1.REFERENCE USE CAUTIONUneven mixing can occur in the common exhaust plenum. The results usingthe following step may underestimate total release source term. Fieldmonitoring results should be immediately used to validate calculation results.6.2.2.3 IF using monitors 2(3)RE7865 and one of them is NOT available, THEN DOUBLEthe value of the working monitor in the calculation AND ANNOTATE onAttachment 1 which radiation monitor was NOT available.
6.2.3 PERFORM calculations for applicable radiation monitor(s) and RECORD inAttachment 1, Section 1.6.2.4 RECORD Noble Gas Source Term in Section 3, Dose Assessment Calculation, ofAttachment 1.6.2.5 PROCEED to Section 6.4 of this procedure to perform steps needed to calculate a doseassessment.
6.3 Source Term Assessment from Field Team Measurements CAUTIONThis method assumes field samples are taken in centerline of plume and atEAB. Off axis samples will underestimate source term. Samples taken atlocations not exactly on the EAB can result in significant errors in calculated source term because concentration decreases exponentially with distancebetween release point and sample point.6.3.1 Effective Dose Equivalent (EDE) Rate @ EAB6.3.1.1 OBTAIN a Close Window Reading in mrem/hour at Waist Level, centerline of theplume at the EAB.6.3.1.2 RECORD EAB Field Reading (mR/hr) in Section 4, Source Term Calculation fromEAB Field Readings, of Attachment 1.6.3.2 OBTAIN the following meteorological data from CFMS, RTIME Data Viewer orRADDOSE-V AND RECORD on Section 2, Technical Information, of Attachment 1,Units 2(3) Dose Assessment Calculation Worksheet:
- Delta T* Wind speed* Wind direction 6.3.2.1 IF wind speed or wind direction is unavailable, then OBTAIN data from EOFmeteorological tower or from references listed in ERTD to obtain meteorological information.
REFERENCE USE 6.3.2.2 IF Delta T is unavailable, THEN USE Stability Class D for daytime conditions orStability Class F for nighttime conditions.
6.3.3 CONVERT wind speed to seconds-per-meter using calculation in Section 2, Technical Information, of Attachment 1, and RECORD.6.3.4 RECORD Wind Speed Factor from Section 2, Technical Information, to Section 4,Source Term Calculation from EAB Field Readings, of Attachment 1.6.3.5 IDENTIFY Stability Class using Delta T identified in Section 2, Stability Information, ofAttachment 1.6.3.5.1 IDENTIFY proper EAB XpJ/Q using Stability Class.6.3.5.2 RECORD identified XpIQ values in Section 4, Source Term Calculation from EABField Readings, of Attachment 1.6.3.6 PERFORM Attachment 1, Units 2(3) Dose Assessment Calculation Worksheet, Section 4, Source Term Calculation from EAB Field Readings.
6.3.7 RECORD Noble Gas Source Term in Section 3, Dose Assessment Calculation, ofAttachment 1.6.3.8 PROCEED to Section 6.4 of this procedure to PERFORM steps needed to calculate adose assessment if not already performed in Section 6.3,REFERENCE USE 6.4 Calculating a Dose Assessment 6.4.1 OBTAIN the following meteorological data from CFMS, RTIME Data Viewer orRADDOSE-V and RECORD on Section 2, Technical Information of Attachment 1:* Delta T* Wind speed* Wind direction 6.4.1.1 IF wind speed or wind direction is unavailable, then OBTAIN data from EOFmeteorological tower or from references listed in ERTD to obtain meteorological information.
6.4.1.2 IF Delta T is unavailable, THEN USE Stability Class D for daytime conditions orStability Class F for nighttime conditions.
6.4.2 IF a release is in progress or there is a potential for a release, THEN OBTAIN anestimated release duration from SM or Operations Leader AND RECORD in Section 3,Dose Assessment Calculation, of Attachment 1.6.4.2.1 IF not already performed in Section 6.3, THEN CONVERT wind speed to seconds-per-meter using calculation in Section 2, Technical Information, of Attachment 1 andRECORD.6.4.2.2 RECORD Wind Speed Factor from Section 2, Technical Information, to Section 3,Dose Assessment Calculation, of Attachment 1.REFERENCE USE NOTEProtective Action Zones (PAZs) should be used within Emergency PlanningZone (EPZ) and Sectors should be used outside the EPZ.6.4.3 DETERMINE affected Sector(s) or PAZs using the following table(s):
Degrees(from)170-191192-214215-236237-259260-281282-304305-326327-349350-1112-3435-5657-7980-101102-124125-146147-169FromSectorSSSWSWWSWWWNWNWNNWNNNENEENEEESESESSESECTORSTo AffectedSectorNNNENEENEEESESESSESSSWSWWSWWWNWNWNNWSectorABCDEFGHJKLMNPQRPAZsWIND DIRECTION (From) DOWNWIND PAZ00- 1000 PAZs 1 and 21010 PAZs 1, 2, and 41020 -2130 PAZs 1 and 42140 PAZs 1, 3, and 42150-3260 PAZs 1 and 33270 PAZs 1, 2, and 33280 -3600 PAZs 1 and 26.4.3.1RECORD Affected Sector or PAZ in Section 2, Technical Information, ofAttachment 1.REFERENCE USE 6.4.4 IDENTIFY Stability Class using Delta T identified in Section 2, Stability Information, ofAttachment 1.6.4.4.1 IDENTIFY proper EAB XIt/Q using Stability Class.6.4.4.2 RECORD identified XpQ values in Section 3, Dose Assessment Calculation, ofAttachment 1.6.4.5 PERFORM calculations indicated for EAB in Section 3, Dose Assessment Calculation, ofAttachment 1, and RECORD Noble Gas EDE (mrem).6.5 Verification of Calculations 6.5.1 SIGN Attachment(s) used AND PROVIDE worksheet(s) to another qualified individual, as time permits, to verify mathematical calculations and correct use of X[I/Q constants and conversion factors.6.5.1.1 RESOLVE discrepancies AND ENSURE individual signs VERIFIED BY section ofworksheet.
6.5.2 REQUEST dispatch of onsite and offsite monitoring teams to validate dose projections and to detect and quantify unmonitored releases.
6.5.3 PROVIDE dose projections to Station Emergency Director or Emergency Coordinator.
REFERENCE USE 7.0 ACCEPTANCE CRITERIA7.18.08.19.0NoneRETENTION OF RECORDSDeliver all logs and worksheet to Emergency Planning Coordinator at conclusion of emergency.
REFERENCES
/ COMMITMENTS 9.1 Implementingq Reference
9.1.1 Procedures
9.1.1.1 SO123-XV-HU-3, Written Instruction Use and Ac9.1.1.2 SO 123-VIII-10.3, Protective Action Recommends 9.1.1.3 SO123-XV-109, Procedure and Instruction Form9.1.2 Drawings9.1.2.1 None9.1.3 Manuals9.1.3.1 None9.1.4 Other9.1.5 Emergency Response Telephone Directory (ERTD)9.2 Developmental References
9.2.1 Commitments
9.2.1.1 None9.2.2 Corrective Actions to Prevent Recurrence (CAPR)Iherenceationsat and Content9.2.2.19.2.39.2.3.1NoneProcedures SO123-VII1-10.3, Protective Action Recommendations INFORMATION USE 9.2.4 Drawinqs9.2.4.1 None9.2.5 Manuals9.2.5.1 None9.2.6 Other9.2.6.1 Memorandum for File from R.A. Garcia Dated September 23, 2013,SO 123-VIII-40.100, Dose Assessment" Revision 19 Calculation Methodology 9.2.6.2 Technical Team Notebook, Revision 1.129.2.6.3 EPA 400 92-001, May 1992,Manual of Protective Action Guides and Protective Actions for Nuclear Incidents INFORMATION USE Units 2(3) Dose Assessment Calculation Worksheet Attachment IDate Time(Section
- 1) NOBLE GAS SOURCE TERM CALCULATION Release Radiation Activity x Effluent Conversion Noble GasPath Monitors Flow x Factor = Source TermUnits 2/3 Plant 2RE7865 Eff OR pci/sec 1 cfm 1.00 E-6 Ci/secVent Stack 2RE7865 L, M, H AND pci/cc cfm 4.72 E-4 Ci/sec[Sum Both Units'2(3)7865s]
3RE7865 Eff OR pci/sec 1 cfm 1.00 E-6 Ci/sec3RE7865 L,M,H ici/cc cfm 4.72 E-4 Ci/sec2/3RE7808 Eff pci/sec 1 cfm 1.00 E-6 Ci/sec2/3RE7808 pci/cc cfm 4.72 E-4 Ci/secTotal Unit 2/3 Noble Gas Source Term Ci/sec(Section
- 2) ASSESSMENT iNFORMATION TECHNICAL INFORMATION IF STABILITY INFORMATION Unit 2, 3, or 2/3 (circle one) [ Delta T Class EAB Xgt/QWind Speed Factor 2.24 mph = sec/m < -0.57 A 1.3E-5or 1.961 knots sec/m -0.56 to -0.51 B 4.6E-5Delta T (40m-10m)
C/30m -0.50 to -0.45 C 9.4E-5Wind Direction (from) degrees -0.44 to -0.15 D 1.3E-4Affected Sector or PAZ -0.14 to 0.45 E 3.1E-40.46 to 1.20 F 5.8E-4> 1.20 G 1.2E-3(Section
- 3) DOSE ASSESSMENT CALCULATION Noble Gas Wind Release Noble GasSource Term Speed Noble Gas Duration EDE(Ci/sec) x Factor x X[L/Q x EDE CF x (hrs) = (mrem)x x x 1.3E3 x = (mrem)(Section
- 4) SOURCE TERM CALCULATION FROM EAB FIELD READINGSEAB Field Reading Wind(mR/hr) / Speed Nobel Gas(Factor x Xp/Q Noble Gas Source Termx EDE CF ) = (Ci/sec)ix x 1.3E3 ) = (Ci/sec)I Calculation PERFORMED BY VERIFIED BYREFERENCE USEAttachment 1Page 1 of 1 Summary of Changes Attachment 2Author: Richard Garcia PAX: 83845NN, Order, .. ... 50.59 Step,,N N, O or Other. .Description of Change ... Reviewer(s) rrPage202596380 Added additional guidance on source termcalculation.
Added additional guidance on source term See Table DNA Throughout assessment from field readings to Section 6.3 and belowAttachment 1.Miscellaneous editorial corrections.
Document Reviewers:
Name:RP Sandra SewellRP Andrew MartinezEP Lucia SischoCognizant Supervisor Larry McCannApprovers:
CFDM Final Approval:
Deborah LindbeckINFORMATION USEAttachment 2Page 1 of 1 Procedure Usage Requirements SectionsInformation Use @ The user may complete the task from memory. However, the Sections 1.0-3.0, 7.0-user is responsible for performing the activity according to the 9.0 and Attachment 4procedure.
- Information use documents that contain a specific process orderare performed in the given order unless otherwise specified within the document.
Reference Use
- Review and understand the procedure before performing any Sections 4.0-6.0,steps, including the prerequisite section.
Attachments 1-3* Have a copy or applicable pages/sections open at the work site.0 Use Placekeeping method according to S0123-XV-HU-3.
- If any portion of the document is performed from memory, do soin the sequence specified.
Perform each step as written, exceptwhen an approved process specifically allows deviation.
0 Refer to the procedure or instruction at least once to ensurecompletion of the task in accordance with the requirements.
- Review the document at the completion of the task to verify thatall appropriate steps are performed and documented.
Color UsageThis Document Does Not Contain Relevant ColorQA PROGRAM AFFECTING 50.59 DNA / 72.48 DNA / RX DNAProcedure TypeGeneralProcedure OwnerMayra Alvarado TABLE OF CONTENTSSection Paae1.0 PURPOSE AND SCO PE ...................................................................................................................
32.0 RESPO NSIBILITIES
..........................................................................................................................
33.0 DEFINITIO NS ....................................................................................................................................
34.0 PRECAUTIO NS AND LIM ITATIO NS ................................................................................................
55.0 PREREQ UISITES ..............................................................................................................................
56.0 PROCEDURE
....................................................................................................................................
66.1 SYSTEM START UP ..............................................................................................................
66.2 M ETEO RO LOG ICAL DATA ENTRY ................................................................................
106.3 SO URCE TERM DATA ENTRY ......................................................................................
116.4 PERFO RM ING A CALCULATIO N ..................................................................................
126.5 PERFORMING A BACK CALCULATION USING FIELD DATA .....................................
136.6 PERFO RM ING A FO RECAST ........................................................................................
146.7 M ULTIPLE UNIT DO SE ASSESSM ENT ..........................................................................
156.8 SYSTEM SHUTDOW N ...................................................................................................
167.0 ACCEPTANCE CRITERIA
..............................................................................................................
178.0 RETENTIO N O F RECO RDS ...........................................................................................................
1
79.0 REFERENCES
/ CO M M ITM ENTS ............................................................................................
17Section PageATTACHMENT 1 Supplem ental Raddose-V Inform ation ........................................................................................
192 PAR Assessm ents Beyond 10 M iles ...........................................................................................
203 M ultiple Unit Dose Assessm ent W orksheet
................................................................................
214 Sum m ary of Changes .....................................................................................................................
22INFORMATION USE
.J,,O, [ S0123-VIII-40.200 RADDOSE-V Dose Assessment REV: 7SON Page 3 of 221.0 PURPOSE AND SCOPE1.1 Provide operating instructions for the Raddose-V Dose Assessment computer code on theRadiation Protection (RP) computers in the TSC and EOF.2.0 RESPONSIBILITIES 2.1 This procedure should be used by personnel qualified to ENCODE HPLDAC, to operate Raddose-V on HP Computers located in the TSC and EOF as primary dose assessment tool as directed inSO123-VIII-TSC, Emergency Response Organization (ERO) Technical Support Center PositionInstructions, and S0123-VIII-EOF, Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists.
S0123-VIII-40.100, Dose Assessment, describes a manualdose assessment methodology that should only be used when the computer system is not available (due to inoperability or lack of qualified operators) or for backup calculations.
3.0 DEFINITIONS
3.1 Cal OES:3.2 CAPR:3.3 CEDE:3.4 CDE:3.5 CFMS3.6 DAC:3.7 DACS3.8 EAL:3.9 EP:3.10 EPIP:3.11 ERDS:3.12 ERF:3.13 ERO:California Office of Emergency ServicesCorrective Action to Prevent Reoccurrence Committed Effective Dose Equivalent Committed Dose Equivalent Critical Function Monitoring SystemDerived Airborne Concentration Dose Assessment Computer SystemEmergency Action LevelEmergency PlanEmergency Plan Implementing Procedure Emergency Response Data SystemEmergency Response FacilityEmergency Response Organization REFERENCE USE 3.14 ERTD: Emergency Response Telephone Directory 3.15 ISFSI: Independent Spent Fuel Storage Installation 3.16 KI: Potassium Iodide3.17 NRC: Nuclear Regulatory Commission 3.18 OCA: Owner Controlled Area3.19 ODAC: Offsite Dose Assessment Center3.20 OSLD Optically Stimulated Luminescent Dosimeter 3.21 PA: Protected Area3.22 PAPA: Protected Area Personnel Accountability 3.23 PAR: Protective Action Recommendation 3.24 PASS: Post Accident Sampling System3.25 PAZ: Protective Action Zone3.26 RP: Radiation Protection 3.27 SCE: Southern California Edison3.28 SONGS: San Onofre Nuclear Generating Station3.29 TEDE: Total Effective Dose Equivalent 3.30 TLD: Thermoluminescent Device3.31 TSC: Technical Support Center3.32 VNF: Verbal Notification Form3.33 YPS: Yellow Phone SystemREFERENCE USE 4.0 PRECAUTIONS AND LIMITATIONS
4.1 Precautions
4.1.1 S0123-VIII-10.3, Protective Actions Recommendations, requires decisions based onTotal Effective Dose Equivalent (TEDE) dose assessments for the Exclusion AreaBoundary (EAB).4.1.2 An elevated release (lofted plume) may occur during cold, stable atmospheric conditions, or during an energetic release (e.g., expelled by fans, steam dumps or steamsafety valves).
If these conditions occur, plume readings close to the plant (withinapproximately 2 miles) may be lower than expected for a ground level release.Although quantitative changes to dose estimates are not needed, consideration shouldbe made for the effects of plume loft when directing field teams.4.1.3 This procedure is intended to provide operating instructions for using Raddose-V Computer Code to calculate a dose assessment.
SO123-VIII-40.100, DoseAssessment, describes a manual dose assessment methodology that can be used ifRaddose-V cannot be executed or if an independent backup assessment is desired.4.1.4 When operating in slave mode, verify the control station has performed the calculation before printing any reports to prevent the report from containing results from previouscalculations.
4.1.5 WHEN performing a Back Calculate Source Term/Dose Assessment, be sure to usefield data location where the plume has arrived.
OTHERWISE, IF the plume has NOTreached the distance from which you are back calculating RADDOSE V will calculate zero dose at that point.4.2 Limitations 4.2.1 None5.0 PREREQUISITES 5.1 Before using this procedure user should know which operating mode to select.Raddose-V provides a Control/Slave mode to allow one work station to run the model as the controlstation and other stations to "watch" results (from control station) as slave stations.
The model alsoprovides an Independent mode where the station works independently from the Control/Slave functions.
5.2 Emergency Planning is responsible for ensuring the current copy of this Document is in emergency notebooks for use during declared emergencies and drills.REFERENCE USE 5.3 Personnel are responsible for ensuring they use the current copy of this document when not in adeclared emergency or drill by verifying this document is current using one of the methodsdescribed in S0123-XV-HU-3 5.4 ERO members must maintain one of the following task qualifications
" 7L1QWT, TSC RP Leader Qual. Walkthrough (Radiation Protection Leader)* 7L5QWT, EOF RP Leader Qual Walkthrough NOTESection 6.7 should be referred to for dose assessment instructions when thereare accidents involving both Units 2 and 3.6.0 PROCEDURE 6.1 SYSTEM START UP6.1.1 IF computer equipment is not already energized, THEN start up system by turning onpower switches for computer,
- monitor, and printer.
WHEN the computer's start upsequence has completed, THEN the Dose Assessment Computer System (DACS)program icons will be on the Windows XP desktop.6.1.2 SELECT the icon on the XP desktop for the unit for which dose assessments arerequired (Unit 2 or 3). "DACS: Raddose-V" title screen is displayed indicating workstation identity code XXXX, e.g., EOF16.1.3 SELECT [Continue]
button.(Raddose-V prompts:
"Do you want to use automatic data from the network or manualdata entry?)NOTEIn an actual emergency the data is pulled from Emergency Response DataSystem (ERDS) computer.
In event that ERDS is not functioning orcommunicating to DACS properly, manual entry of data will be required.
6.1.4 SELECT [Automatic]
to enable automatic entry of actual data from ERDS database.
ORSELECT [Manual]
to enable manual entry of meteorological and radiological data.(Raddose-V prompts:
"Do you want to run in Control/Slave or Independent Mode?")REFERENCE USE 6.1.5 SELECT [ControllSlave]
to take control of system or to receive dose assessments asa slave station.ORSELECT [Independent]
to run Raddose-V independent from control station.(ff no one is on the system as controller, then computer will prompt: "No one is in control,do you want control?
Slave mode cannot be used since there is no control station)".
6.1.66.1.6.To assume control SELECT [Yes]. This will permit data you calculate to be viewed byother slave computers on the system. (LF another work station already has taken controlof system, THEN computer will prompt: "XXXX is in control.
Do you want to be a slave,or run independently?")
NOTEA slave station cannot perform real-time calculations.
A slave station can watchresults from control station and perform forecasts after initial calculations havebeen made at control station.1SELECT [Slave] to be put on system as a slave station.6.1.6.1.1 6.1.6.1.2 6.1.6.26.1.6.2.1 6.1.6.2.2 SELECT [Continue Previous Incident]
to view data from control station.To perform forecasts REFER to Section 6.6ORSELECT [Independent]
to take over control of system from current control station.Raddose-V "Main Menu" is displayed CONTACT station that has control of system AND INFORM them you are takingcontrol of system.SELECT [Take Control]
from Main Menu. Computer will prompt: "XXXX is incontrol.
Are you sure you want to be in control?"
REFERENCE USE 6.1.6.2.3 SELECT [Yes] to complete process.
(Computer will prompt, "Do you want to runin Drill Mode or Accident Mode?" SELECT [Drill] or [Accident]
mode,"Inventory Listing" screen is displayed.)
NOTESelecting
[Drill] will cause program to take radiological and meteorological datafrom a database developed by drill planner for specific drill. Selecting
[Accident]
will cause program to take radiological and meteorological datafrom ERDS database of actual plant and meteorological data.6.1.6.36.1.76.1.7.16.1.7.26.1.7.36.1.86.1.8.16.1.8.26.1.9SELECT [Continue].
"Start-Up Menu" is displayed.
DETERMINE which of the following conditions apply and go to designated procedure stepTo start a new assessment with system in proper configuration (neither of thefollowing Steps 6.1.7.2 or 6.1.7.3 apply), GO TO Procedure Step 6.1.8.To recover from a computer error that led to an unplanned program termination, GOTO Procedure Step 6.1.9.To recover system after computer was improperly shut down by a previous user NOTin this scenario, GO TO Procedure Step 6.1.10.SELECT [Begin New Incident]
from Start-Up Menu to start a new assessment SELECT [Yes] to erase all previous data.GO TO Procedure Step 6.1.11.SELECT [Continue Previous Incident]
from Start-Up Menu to recover from a computererror that led to an unplanned program termination.
("Continuation Data" screen will bedisplayed.)
NOTEThe Continuation Data screen will display the date and time of the reactorshutdown, the date and time of the release, and the operators initials.
6.1.9.16.1.9.26.1.9.3VERIFY accuracy of input data on Continuation Data screen.SELECT [Continue]
to return to Main Menu.GO TO Procedure Step 6.2.1.REFERENCE USE 6.1.10 SELECT [Continue Previous Incident]
from Start Up Menu to recover system aftercomputer was improperly shut down by a previous user NOT IN THIS SCENARIO.
6.1.10.1 SELECT [Continue]
on Continuation Data Screen.6.1.10.2 SELECT [Go to Start Up Menu].6.1.10.3 SELECT [Exit Raddose-V].
6.1.10.4 To restart Raddose-V
- program, GO TO Procedure Step 6.1.2. "Accident ScenarioDefinition" screen should now be displayed.
6.1.11 PERFORM the following:
NOTETrip date/time may be entered as a future time or time after release in theunlikely event of a release without a reactor trip. Decay correction of sourceterm does not occur until reactor trip occurs.6.1.11.16.1.11.26.1.11.36.1.11.46.1.11.5ENTER date and time of reactor trip (Use a Date of 1/1/2012 and a Time of 0000 fora Fuel Handling Accident (FHB) Only).ENTER date and time of start of release.ENTER your initials as operator.
VERIFY accuracy of input data on Accident Scenario Definition screen.SELECT [Accept]
to return to Main Menu.NOTE1) DACS must be restarted in order that correct reactor trip time and/orradiological release time is being inputted.
This will require all operators in"Slave" mode to logoff until DACS is restarted.
- 2) DACS should be updated with a new time step every 15 to 30-minutes, inorder to keep time step current.
This should be done even if source termhas not changed.6.1.12 IF an accident related release of radioactive material begins, THEN CALCULATE anemergency dose projection every 15-30 minutes based on latest source term providedby the TSC Technical Team Mitigator.
6.1.13 POLL AND PRINT meteorological, radiation
- monitor, and PIC data approximately every15 minutes.
This should occur automatically if [Automatic Rad Report] button isenabled on Main Menu screen.REFERENCE USE 6.1.13.16.1.13.2To access meteorological, radiation
- monitor, and PIC data, GO TO Windows XPdesktop.SELECT [Historical Data].NOTE1) The following procedure steps describe how to input meteorological andradiological data to perform a dose assessment.
Determination ofappropriate Radiological data should be made in direct consultation withTSC Technical Leader.2) Raddose-V can be used to track or forecast an "empty" plume which can beused to pre-stage field teams in anticipation of an actual accident relatedrelease.
To simulate an "empty" plume use use a very low plant vent stackNoble Gas release rate such as 2.OE-14 Curies/sec to avoid hypothetical release data being interpreted as an actual release.6.2 METEOROLOGICAL DATA ENTRY6.2.1 SELECT [EnterlEdit Meteorological Data] from Main Menu. "Meteorological DataInput" screen will be displayed.
(Lf Raddose-V is in automatic mode, then Raddose-V willdownload appropriate meteorological data.)6.2.2 IF Raddose V is in automatic mode, THEN GO TO Procedure Step 6.2.5.6.2.2.1 IF Raddose-V is not in automatic mode, THEN CLICK on [OK] to enable manualentry.6.2.3 Manually ENTER the following data by highlighting blank data field (displayed as .....)AND manually INPUTTING desired value.NOTEDouble clicking on an existing value will allow value to be edited. Data isaccepted by using enter key.6.2.3.16.2.3.26.2.3.36.2.3.4ENTER Wind Speed.ENTER Wind Direction.
ENTER Delta T.IF Delta T is not available, THEN Stability class can be estimated and entereddirectly.
REFERENCE USE NOTEUnless better information is available use Stability Class D for daytimeconditions and Stability Class F for night time conditions.
6.2.3.56.2.3.66.2.4ENTER Air Temperature.
ENTER Precipitation.
VERIFY input data.6.2.5 SELECT [Accept]
to return to Main Menu.6.3 SOURCE TERM DATA ENTRY6.3.1SELECT [Enter/Edit Source Term Data] from Main Menu. "Source Term Data Input"screen will be displayed.
Click on [OK] to enable manual entry.NOTE1) Accident type should be a Fuel Handling Building (FHB) accident unlessotherwise determined by TSC Technical Team.2) Raddose-V can evaluate three separate release paths simultaneously.
6.3.2 ENTER accident type by clicking the mouse in the cell for release path of concern inAccident Type Column. A drop down menu will appear.6.3.3 SELECT accident type from drop down menu by double clicking in first cell of rowcontaining description of accident type.NOTE1. For Wide Range Gas Monitors (WRGMs),
the pCi/cc value for "Lo","Med", or "Hi" channel should be used as long as those values are inthe range of 1 E-7 to 1 E-1, 1 E-4 to 1 E+2, or 1 E-1 to 1 E+6 pCi/CC,respectively.
- 2. For the Unit 2 and 3 Plant Vent Stacks (PVSs), if a pCi/sec isunavailable, then average the pCi/cc of both PVSs (use the pCi/cc ofone monitor if only one PVS is available) and use 164,000 cfm releaserate.6.3.46.3.4.1SELECT Noble Gas entry method by first clicking in cell in NG Method column.A drop down menu will appear.SELECT Noble Gas entry method from drop down menu by double clicking in firstcell of row containing description of Noble Gas entry method.REFERENCE USE 6.3.4.2 If Direct (DRECT) is selected as Noble Gas entry method, THEN ENTER Noble Gasrelease rate in Curies per second in NG Rel Rate (Ci/s) field.6.3.4.3 ENSURE Noble Gas source term data is entered using units specified in Noble Gasentry method drop down menu.6.3.5 SELECT Iodine entry method by first clicking in cell in I Method column. A drop downmenu will appear.6.3.5.1 SELECT the Direct (DRECT) Iodine entry method from drop down menu by doubleclicking in first cell of row containing description of Iodine entry method.6.3.6 ENTER Iodine release rate as '0' in Curies per second in I Rel Rate (Ci/s) field.6.3.7 VERIFY accuracy of inputs on Source Term Data Input Screen.6.3.7.1 SELECT [Accept]
to return to Main Menu.6.4 PERFORMING A CALCULATION 6.4.1From Main Menu, SELECT [Perform Calculations].
NOTE1) Computer will calculate dose rates for defined plume segment, and willcalculate dose rates and plume segment movement for plume segmentsalready released.
Once completed, program displays 10-mile Emergency Planning Zone (EPZ) map.2) After calculation has been performed, slave computer will be able to viewdata.6.4.2 SELECT [Continue]
to remove map. ("Output Menu" will be displayed).
6.4.3 From Output Menu, SELECT [Go to Report Menu].6.4.46.4.5NOTE1) Unless other options have been requested, print the following reports fromReport Menu.2) Selecting
[Print reports ODAC Forms and Maps] will print a multi-page report of greater than 10 pages.From Report Menu, SELECT [Print Header Pages].From Report Menu, SELECT [Print 2-mile Map].REFERENCE USE 6.4.6 CLICK on [Return to Output Menu].6.4.7From Output Menu, SELECT [Return to Main Menu] to return to Main Menu.NOTE[Continue Calculations]
also returns to Main Menu.6.4.8 CONTINUE running dose assessments on 15 minute plume segments approximately every 15 minutes with source term data provided by TSC Technical Team Mitigator orTSC Technical Leader.6.4.9 ENSURE results of dose assessments are transmitted to appropriate slave stations.
6.5 PERFORMING A BACK CALCULATION USING FIELD DATANOTE1) To perform a back calculation at least one plume segment must have beenentered and calculated.
Distance and bearing where field measurement istaken is critical to calculation of proper X/Q value. Bearing is expressed in"degrees to" field location and will be 1800 out of phase with wind direction which is expressed as "degrees from".2) Back calculation assumes actual field or PIC readings are centerline ofplume. If this assumption is not correct, Raddose-V calculated values andfield or PIC value comparisons may not match.CAUTIONWhen performing a back calculation from field data, Raddose-V uses Iodine toNoble Gas ratio from previous plume step. This value must be checked toensure it is still applicable or significant miscalculations could occur.6.5.1From Main Menu, SELECT [Enter/Edit Source Term Data].6.5.2 At "Source Term Data Input Screen",
SELECT (BACK) from drop down menu for NobleGas method. This will open "Back Calculation of Release Rate" screen.6.5.3 SELECT Noble Gas method (either PIC or actual field measurements).
6.5.4 SELECT Iodine 1-131 concentration method.6.5.56.5.5.1IF field measurement data is being used, THEN ENTER distance and bearing from theplant for field reading.ENTER Closed Window field measurement in mR/hr.REFERENCE USE 44ft- O 501 23-VIII-40.200 (t'Th*. RADDOSE-V Dose Assessment REV: 7SONGs Page 14 of 226.5.5.26.5.5.2.1 ENTER [LCi/CC 1-131 value of "0".6.5.6 IF PIC data is being used, THEN ENTER PIC ID# and PIC reading in mR/hr.6.5.6.1 VERIFY input data.6.5.6.2 SELECT [OK] to return to Source Term Data Input Screen.6.5.7 SELECT [Accept]
to return to Main Menu.6.5.8 PERFORM calculations AND PRINT reports as described in Section 6.4.6.5.9 CONTINUE to poll meteorological, radiation
- monitor, and PIC data as time allows.6.5.10 ENSURE results of dose assessments are transmitted to appropriate slave stations.
6.6 PERFORMING A FORECASTNOTE1) At least one plume segment must be calculated before forecasts can beperformed.
- 2) Tracking or forecasting an "empty" plume may be used to pre-stage fieldteams in anticipation of an actual accident related release.
To simulate an"empty" plume use a very low plant vent stack Noble Gas release rate suchas 2.OE-14 Curies/sec to avoid hypothetical release data being interpreted as an actual release.3) All printouts of "empty" plume calculations should be clearly identified withphrase "No Release" written on printout(s).
- 4) All "WHAT IF" plume calculations should be clearly identified with "WHATIF" written on printout(s).
6.6.1 VERIFY accuracy of meteorological and source term data.6.6.1.1 From Main Menu, SELECT [Enter/Edit Meteorological Data].6.6.1.1.1 ENTER meteorological data for forecast period in current time step.6.6.1.1.2 SELECT [Accept]
to return to Main Menu.6.6.1.2 From Main Menu, SELECT [Enter/Edit Source Term Data].6.6.1.2.1 ENTER source term data for forecast period in current time step.6.6.1.2.2 SELECT [Accept]
to return to Main Menu.REFERENCE USE NOTEWhen proceeding with real-time calculations after having performed "WHAT IF",be certain data in new plume segment is correct (edited) for real time data. Awarning pop up box will appear to remind you.6.6.2 SELECT [Perform Forecast]
from Main Menu. A pop up box appears asking operatorto verify forecast period. A default time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is displayed.
6.6.2.1 ACCEPT default value if 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is appropriate; ORENTER a different forecast period in hours.6.6.2.2 SELECT [OK] to perform forecast calculations.
[Upon completion of calculations, 10-mile EPZ map for forecast period is displayed along with PAG (Protective ActionGuideline) information].
6.6.3 SELECT [Continue]
to remove map. "Output Menu" is displayed.
6.6.4 From Output Menu SELECT [Go to Report Menu] to obtain dose reports.6.6.5 SELECT [Return to Output Menu].6.6.6 From Output Menu SELECT [Return to Main Menu] to continue calculations or performanother forecast.
6.6.7 ENSURE results of dose assessments are transmitted to appropriate slave stations.
6.7 MULTIPLE UNIT DOSE ASSESSMENT 6.7.1 COMPLETE U2 Dose Assessment following sections 6.1.through 6.4.6.7.1.1 ENTER TEDE value from page 3 of Header Report on Attachment 3.6.7.1.2 ENTER two hour estimate TEDE value from page 3 of Header Report onAttachment 3.6.7.2 COMPLETE U3 Dose Assessment following steps in 6.1.through 6.4.6.7.2.1 ENTER TEDE value from page 3 of Header Report on Attachment 3.6.7.2.2 ENTER two hour Estimate TEDE value from page 3 of Header Report onAttachment 3.6.7.3 ADD Unit 2 and Unit 3 Dose Assessment TEDE on Attachment 3:6.7.3.1 ADD Unit 2 and Unit 3 TEDE values AND ENTER the total on Attachment 3.REFERENCE USE 6.7.3.2ADD Unit 2 and Unit 3 two hour Estimate TEDE values AND ENTER the total onAttachment 3.6.7.46.7.56.7.66.8 SYSTEMSIGN AND DATE Performed By on Attachment 3.ENSURE Attachment 3 is peer checked and the reviewed by line is signed.ATTACH Header Report and 2 Mile Map for each Unit to Attachment 3.SHUTDOWNNOTEThe dose associated with a radiological plume should be completely assessedto the maximum credible distance before the RP Leader determines theRaddose-V program will no longer be needed and system may be shut down.6.8.16.8.1.16.8.1.26.8.1.36.8.1.46.8.26.8.2.1IF your station has been in control, THEN SELECT [Relinquish Control]
from MainMenu.Model will prompt "Are you sure?"SELECT [Yes].SELECT [Go to Start Up Menu].SELECT [Exit Raddose-V].
IF your station has been running in either slave or independent mode, THEN SELECT[Go to Start Up Menu] from Main Menu.SELECT [Exit Raddose-V].
REFERENCE USE 7.0 ACCEPTANCE CRITERIA7.1 None.8.0 RETENTION OF RECORDS8.1 Deliver all logs and worksheets used during response activities to EOF Emergency PlanningCoordinator or TSC Manager at conclusion of emergency.
9.0 REFERENCES
/ COMMITMENTS 9.1 Implementing Reference
9.1.1 Procedures
9.1.1.1 SO123-VIII-10.3, Protective Action Recommendations 9.1.1.2 SO1 23-VIII-40.100, Dose Assessment 9.1.1.3 SO123-XV-109, Procedure and Instruction Format and Content9.1.1.4 SO123-XV-HU-3, Written Instruction Use and Adherence 9.1.1.5 SO123-VIII-TSC, Emergency Response Organization (ERO) Technical SupportCenter Position Checklist 9.1.1.6 SO123-VIII-EOF, Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists 9.1.2 Drawings9.1.2.1 None9.1.3 Manuals9.1.3.1 Operator's Manual for DACS/RADDOSE-V, Rev. 3, June 19989.1.4 Other9.1.4.1 None9.2 Developmental References
9.2.1 Commitments
9.2.1.1 NoneINFORMATION USE 9.2.2 Corrective Actions to Prevent Recurrence (CAPR)9.2.2.1 None9.2.3 Procedures 9.2.3.1 S0123-VIII-40.3, EOF Radiation Protection (RP) Leader Duties.9.2.3.2 S0123-VIII-40, TSC Radiation Protection (RP) Leader Duties.9.2.4 Drawings9.2.4.1 None9.2.5 Manuals9.2.5.1 Operator's Manual for DACS/RADDOSE-V, Rev. 3, June 19989.2.6 Other.9.2.6.1 Action Request 060301941, Assignment 3INFORMATION USE Supplemental Raddose-V Information I Attachment 1SuppemetalRaddse-InormtionAttchmntI
- 1. All DACS databases "time stamp" data from the beginning of the interval.
For the case of the15-minute average data, intervals begin on the quarter hour. The data represent an average of thefollowing 15 one-minute readings.
- 2. For the 09:00 record, the one-minute average for 09:00, 09:01, and 09:02...09:14 are averaged andreported.
The one-minute average is actually the average of fifteen readings taken at 4-secondintervals.
As such, the actual time period of the 09:00 fifteen-minute average is really 09:00:00 to09:14:56.
- 3. Raddose-V can back calculate a source term for dose projections based on field data including PICreadings.
To use this feature the location of the field sample or PIC reading must be within theRaddose-V generated plume area. The field data should be entered in the appropriate accidenttime step coinciding with the field measurement.
- 4. Back calculation assumes the actual field or PIC readings are the centerline of the plume.If this assumption is not correct, the Raddose -V calculated values and the field or PIC valuecomparisons may not match.5. Raddose-V can be used to track or forecast an "empty" plume which can be used to pre-stage fieldteams in anticipation of an actual accident related release.
To simulate an "empty" plume use avery low plant vent stack Noble Gas release rate such as 2.OE-14 Curies/sec to avoid hypothetical release data being interpreted as an actual release.6. Occasionally, there will be a puff release during an incident or drill. Make sure that releases whichstop are terminated in the Raddose-V program.7. The accident type can change during an accident.
Make sure this change is properly recorded inRaddose-V even if the source term values remain the same.8. In the [Enter/Edit Source Term Data] screen do not attempt to enter rad data unless an entrymethod has been selected.
Attempting to enter rad data without specifying an entry method willproduce an error message "Subscript out of Range". When the error message is acknowledged the program will terminate.
The user will need to restart the program from the Raddose-V iconin the DACS Program group.REFERENCE USEAttachment 1Page 1 of 1
_J SO123-VIII-40.200 RADDOSE-V Dose Assessment REV: 7SoNGS Page 20 of 22PAR Assessments Beyond 10 Miles Attachment 2In an extreme radiological release under adverse meteorological conditions there is a potential that Plumeexposure PAR's may need to be evaluated at distances beyond 10 miles. Raddose-V can assess doserates beyond 10 miles by utilizing the Point-of-Interest Doses screen. This screen can be accessed fromthe Main Menu by selecting
[Display Point-of-Interest Doses].The Point-of-Interest screen allows a user the ability to obtain dose rates and deposition rates at any pointwithin the 50-mile Ingestion Pathway Zone (IPZ). When the screen is first entered, the maximum doserates and deposition rates at each ring distance (EAB, 1, 2, 5 and 10 miles) are displayed.
For any otherlocation, the radial distance in miles and the bearing in degrees can be entered to assess the plume EDEdose rate, TEDE dose rate, as well as a deposition rate.When protective action guideline doses are exceeded at 10 miles (i.e., 21 rem TEDE) an evaluation shouldbe made to determine the distance to which the Protective Action Recommendations should be extended.
The Point-of-Interest Doses feature of Raddose-V can be utilized together with an estimated releaseduration to determine the distance where protective action guideline doses will not be exceeded.
REFERENCE USEAttachment 2Page 1 of 1 Multiple Unit Dose Assessment Worksheet I Attachment 3One hour estimate:
U2 TEDE (mrem/hour) from page 3 of header reportU3 TEDE (mrem/hour) from page 3 of header reportTotal (mrem/hour) add unit 2 + unit 3Two hour estimate:
U2 TEDE (mrem) from page 3 of header reportU3 TEDE (mrem) from page 3 of header reportTotal (mrem) add unit 2 + unit 3Performed by:(mrem/hour)
(mrem/hour)
(mrem/hour)
(mrem)(mrem)(mrem)Date:Reviewed by:Date:REFERENCE USEAttachment 3Page 1 of 1 Summary of Changes Attachment 4Author: Richard Garcia PAX: 83845Step,NN, OrderjPr ot.her. 50 59 I. LrSection, 4 Acton c-Description of Change >qf, Reviewer(s),7.8
.r "' or Page202596380 Removed references to SGTR, LOCA andThyroid dose as they are no longerapplicable.
See Table DNA Throughout BelowAdded additional guidance on enteringIodine release rates.Document Reviewers:
Name:RP Andrew MartinezRP Sandy SewellEP Lucia SischoEP Dan Cleavenger Cognizant Supervisor Larry McCannApprovers:
CFDM Final Approval:
Deborah LindbeckINFORMATION USEAttachment 4Page 1 of 1 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 1 OF 73EMERGENCY PLAN DRILLS AND EXERCISES TABLE OF CONTENTSSECTION PAGE1.0 O BJECTIVES
.......................................................................................................................
22.0 REFERENCES
......................................................................................................................
23.0 PREREQ UISITES .................................................................................................................
34.0 PRECAUTIO NS ....................................................................................................................
35.0 RESPO NSIBILITIES
....................................................................................................
46.0 PRO CEDURE .......................................................................................................................
67.0 RECO RDS ..........................................................................................................................
21ATTACHMENTS 1 Periodic Drill and Exercise Requirem ents .....................................................................
222 M atrix of Drill and Exercise O bjectives
..........................................................................
233 Scenario Developm ent Team and Responsibilities
........................................................
294 Drill Planning Checklist
.................................................................................................
335 Controller Evaluator O rganization
.................................................................................
406 Drill Preparation Flowchart
.............................................................................................
457 Exercise Preparation Flowchart
.....................................................................................
468 Controller and Evaluator Briefing
...................................................................................
479 Controller Training
........................................................................................................
4810 Controller
/ Evaluator G uidelines
...................................................................................
5011 O bserver G uidelines
.....................................................................................................
5912 Security/Confidentiality Agreem ent ...............................................................................
6013 Participant Briefing
........................................................................................................
6114 Drill Report .........................................................................................................................
6515 Definitions
..........................................................................................................................
6816 Developm ental Resources
............................................................................................
7017 Sum m ary of Changes ...................................................................................................
71REFERENCE USEQA PROGRAM AFFECTING 50.59 DNA/72.48 DNA NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 2 OF 73EMERGENCY PLAN DRILLS AND EXERCISES
1.0 OBJECTIVES
1.1 Identify requirements for periodic Emergency Plan Drills and Exercises byreferences in Section 2.0.1.2 Provide guidelines for development,
- conduct, evaluation, and recordsmaintenance of Emergency Plan Drills and Exercises.
1.3 Establish a system for correcting deficiencies and weaknesses identified byEmergency Plan Drill and Exercise evaluations.
2.0 REFERENCES
2.1 NRC Commitment 2.1.1 SONGS Emergency Plan, Units 1, 2 and 32.2 Procedures 2.2.1 SO123-VIII-0.201, Emergency Plan Equipment Surveillance Program(EPESP)2.2.2 S0123-XXI-1.11.3, Emergency Plan Training Program Description 2.2.3 SO123-XV-1 09, Procedure and Instruction Format and Content2.2.4 SO123-XV-HU-3, Written Instruction Use and Adherence 2.2.5 S0123-XV-50, Corrective Action Program2.2.6 S023-XXI-REC, Training Records2.2.7 S0123-VIII-0.100, Maintenance and Control of Emergency PlanningDocuments 2.2.8 S0123-XV-50.CAP-1, Writing Nuclear Notifications for Problem Identification and Resolution 2.2.9 SO123-XV-ERO-2, Emergency Planning Oversight 2.2.10 SO123-VIII-0.210, Emergency Planning Drill Objectives and Demonstration Criteria NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 3 OF 732.3 Other2.3.1 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear PowerPlants2.3.2 FEMA Interim Radiological Emergency Preparedness (REP) Program ManualApril, 20122.3.3 NRC Inspection Manual Chapter 0609, Appendix B, Emergency Preparedness Significance Determination
- Process, 02/24/122.3.4 Form EP (123) 20, Emergency Planning Document Review Sheet2.3.5 NN 201944331, Exercise Scheduling 2.3.6 NN 201974817, Identification of Drill Weaknesses 2.3.7 NN 202044191, 10CFR50.47(b)
Identification of Deficiencies Identified as aResult of Periodic Exercises.
3.0 PREREQUISITES
3.1 Verify this document is current by using one of the methods described inSO123-XV-HU-3.
3.2 Verify level of use requirements on page one of this document.
4.0 PRECAUTIONS
4.1 Drills and exercises shall minimize interference with plant operations, maintenance and construction activities, consistent with achieving objectives.
4.2 Drills and exercises shall be developed such that interactions with the actualcontrol room are minimized.
When interaction with the actual control room isnecessary, it shall be done in such a manner as to minimize control roomdistractions.
4.3 Security procedures shall remain in effect during drills and exercises.
4.4 Drill or exercise activities shall be suspended in the event of an actualemergency.
4.5 Electronic communications and data relating to the drill or exercise should beidentified as drill or exercise information by prefacing them with the statement, "This is a drill." This statement should also be repeated periodically oncommunication lines (telephone, radio) which are kept open for extended periodsor could be monitored or overheard by non-participants.
4.6 Scenarios shall maintain the safety of employees and the public and meetapproved objectives.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 4 OF 735.0 RESPONSIBILITIES 5.1 Manager, Emergency Preparedness Planning (EPM) is responsible to:* Ensure the emergency preparedness drill/exercise program maintains the level ofproficiency of the Emergency Response Organization (ERO).* Implement the site emergency preparedness drill/exercise program." Assign an individual to perform the functions of and serve as Drill/Exercise Coordinator.
- Ensure drills and exercises required by the Emergency Plan are scheduled, conducted and evaluated.
" Coordinate with site management for resource assignment to a ScenarioDevelopment Team (SDT).* Ensure drill/exercise six-year plan is maintained and up-to-date.
- Ensure corrective actions are identified and resolved for objectives "not met" and forweaknesses or improvement areas.* Ensure lessons-learned are disseminated or available to all ERO personnel.
- Approve all drill/exercise objectives, critiques, and reports for each drill andexercise.
" Brief the site management team and the NRC inspection team of the exerciseevaluation results.* Ensure distribution or availability of the drill/exercise report.5.2 Manager, Safety, Human Performance and Performance Improvement isresponsible to:* Provide personnel from the training staff to assist with the development, validation and execution of drill scenarios.
- Coordinate with the EP Department to schedule the use of the simulator for drills orexercises.
" Provide remediation training for personnel demonstrating unsatisfactory performance during drills or exercises.
5.3 Site Management team is responsible to:Schedule personnel to participate in the Scenario Development Team andparticipate in drills and exercises as controllers, evaluators, and drill or exerciseparticipants.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 5 OF 735.4 Drill/Exercise Coordinator is responsible to:" Develop and maintain the drill/exercise schedule* Coordinate all activities of the drill/exercise from planning through the finalreport.* Select the drill/exercise program and performance objectives from the six-year plan and update the plan after the demonstration.
- Lead the development, validation and approval of scenarios.
- Coordinate the assembly of the drill/exercise package and coordinate thedistribution to the assigned controllers and evaluators.
- Ensure scenario security and submit to the applicable government agencies when required.
- Ensure drill/exercise controllers, evaluators, and participants are identified and notified of the drill schedule.
- Manage the overall conduct of the drill/exercise (typically as the DrillCoordinator).
5.5 Scenario Development Team is responsible to:* Develop the scenario and drill/exercise package using the scenariodevelopment checklist in Attachment 3.* Participate in the drill/exercise as controllers.
5.6 Emergency Planning Department staff is responsible to:" Assist in the development and validation of the scenario.
" Assist in the preparation of the drill/exercise scenario packages.
" Support the selection and notification of controllers, evaluators andparticipants.
- Verify equipment readiness before the drill or exercise.
- Support drills and exercises in the role of a Facility Lead Controller orcontroller
- Support in developing and maintaining the six-year plan.
NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17SO 123-VIII-0.200 PAGE 6 OF 736.0 PROCEDURE 6.1 EP DRILL/EXERCISE SCHEDULENOTEThe meaning of "drills" in this usage is intended to include performance enhancing experiences (exercises, functional drills, simulator drills, tabletop drills, mini drills, etc.) thatreasonably simulate the interactions between appropriate centers and/or individuals thatwould be expected to occur during emergencies.
For example, control room interaction withoffsite agencies could be simulated by instructors or OSC interaction could be simulated by acontrol cell simulating the TSC functions, and damage control teams.Exercises must provide the opportunity for the ERO to demonstrate proficiency in the keyskills necessary to implement the principal functional areas of emergency
- response, including activities such as:* Event classification
- Notification of offsite authorities
- Protective action recommendation development
- Accident assessment
- Management and coordination of emergency response* Assessment of the onsite and offsite impact of radiological releases* Protective action decision making* Plant system repair and mitigation action implementation Additionally, each exercise must provide the opportunity for the ERO to demonstrate keyskills specific to emergency response duties in the Control Room, TSC, OSC, EOF and JIC.6.1.1 The drill/exercise coordinator will develop and maintain a rolling six-yearschedule of drill/exercise dates or approximate dates that allowsdemonstration of all major portions of the emergency plan over a six-yearperiod..1An annual drill and exercise schedule for the coming year should bedeveloped before the end of each year.* Determine drill dates that involve outside government or supporting agencies by consulting the IPC, NRC, FEMA, and other NRC Region IVutilities.
- Obtain Nuclear Organization management approval of the proposeddrill/exercise dates.* Confirm the drill/exercise dates with all affected internal and externalorganizations.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 7 OF 736.1.2 Schedule annual/periodic drills to meet the minimum drill frequencies andtypes in Attachment 1 during any six-year period.6.1.3 The EPM will identify which drill objectives will be evaluated prior to the drill.6.1.4 Coordinate the required resources with planning and scheduling
/ workcontrol at least 20 weeks in advance to include in the 20 week work schedulewhen possible.
6.1.5 Notify ERO members selected to control,
- evaluate, and participate approximately 4 to 6 weeks in advance of the scheduled drill/exercise.
6.1.6 Ensure the drill schedule provides the opportunity for all ERO members tomaintain proficiency.
6.1.7 Any changes to the exercise or drill schedule shall be confirmed with allaffected internal and external organizations, and approved by the Manager,Emergency Planning (EP).6.2 SELECTION OF DRILL/EXERCISE OBJECTIVES 6.2.1 Emergency planning program objectives in SO123-VIII-0.210 are the planningstandard elements that are demonstrated annually or over a six-year periodduring drills/exercises, in accordance with NUREG 0654, Section I1.6.2.2 Emergency planning performance objectives are criteria or measures that areintended to be achieved, by the ERO, during emergency planningdrills/exercises to demonstrate the capability to meet the planning standards.
6.2.3 The selection of objectives shall be based upon:" Objectives that support the offsite agencies demonstration of scheduled FEMAREP evaluation areas* Areas of improvement
/ weaknesses identified in previous drills/exercises (facility and/or team performance)
- Review NNs/Inspection Reports/Drill Critiques
" Site or industry operating experience lessons learned located in CAP, INPOweb site, NRC web site, NEI or RUG peer group communication orrecommendations from site management.
" Revisions to the E-plan and major EPIP revisions
" Six-year schedule and objective demonstration tracking.
6.2.4 Ensuring drill objectives provide for the verification of the effectiveness ofcorrective actions initiated from previous drills.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 8 OF 736.2.5 Update Attachment 2, 'Matrix of Periodic Drill and Exercises Objectives' following each drill/exercise.
6.2.6 Inform the Emergency Planning Manager of any objectives that have notbeen performed within their periodicity per the SONGS Emergency Plan.6.3 SCENARIO DEVELOPMENT NOTE"Periodic Drill and Exercise Requirements,"
Attachment 2, describes the specific drillsrequired by the SONGS Emergency Plan.6.3.1 Acceptance policy for a scenario.1 Acceptable exercise scenarios include:* Newly created scenarios.
- Re-use of an existing scenario provided:
o Participants have not seen the scenario as a participant, evaluator, controller, observer or scenario developer/reviewer within theprevious 12 monthsORo The scenario is revised such that the scenario is changedsubstantially by any of the following:
-Initial plant conditions and components out of service-Classification level and emergency action levels (EAL)-Specific component failures/malfunctions/indications resulting inescalation of the classification and EAL-Specific component failures/malfunctions/indications resulting inthe loss of a safety system function(s)
-Plant radiological conditions
-Offsite release failure mechanism, release magnitude and/orrelease duration-Meteorological data-Initial protective action recommendation (PAR) and/or PARupgrade-Other as determined by scenario sequence NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 9 OF 736.3.2 The Biennial Exercise scenario must be substantially different from theprevious biennial exercise and all integrated scenarios conducted betweenexercises that the key exercise participants have observed.
(Failures andevent classifications may be similar but the timing, basis for the classification and offsite radiological release should vary from the previous biennialexercise.)
6.3.3 The scenario shall be developed for each Emergency Plan site-wide drill andexercise conducted by EP.6.3.4 Assemble a scenario development team from any or all of the desiredpositions described in Attachment 4.6.3.5 Utilize the drill/exercise scenario package development checklist inAttachment 3 and develop the scenario and supporting data and messages.
- Ensure the timeline allows the opportunity to demonstrate the selectedobjectives.
- Verify the scenario and timeline in the simulator and develop a simulator guide if desired.* Review EALs used during previous drills/exercises to ensure a variety ofEALs are being utilized.
6.3.6 The scenario shall provide the necessary information and guidance toachieve the identified objectives.
6.3.7 Scope of the drill or exercise should be developed to indicate:
" Participants
- Types and extent of responses by the Emergency Response organization including extent of notifications and degree of simulation
" Offsite participation 6.3.8 Guidelines for Drill or Exercise Conduct should be developed and distributed for review by selected site personnel, including participants, prior to the drill.6.3.9 After validation, the EPM will approve the scenario prior to commencement ofthe drill or exercise.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 10 OF 736.4 SCENARIO PACKAGENOTEThe scenario package varies with the type of drill/exercise, simple for a single facility tabletopdrill and very detailed for a full scale drill or exercise.
Performance indicator and federally required scenarios must include enough information to adequately evaluate those types ofdrills. Simulator generated scenario data is not included.
6.4.1 The scenario package may contain any or all of the elements listed in thissection." Sequence of Events: Time-line listing of all cue cards and activities that drivedrill and controller actions.
Included in the scenario are the initial conditions, adescription of all predicted events with the expected time of the event and anyassociated anticipated actions the participants will take. This section is usedby the evaluators and controllers during the drill/exercise as a prompt forissuing drill/exercise messages" Messages and Cue Cards: Messages/cue cards are used to provideinformation to participants concerning simulated conditions or events.Messages/cue cards are delivered to participants per the timeline by thecontroller.
o Message/cue cards will inform the participant of an event, conditions in anarea, what they are seeing when they arrive or simulate a task or informthem of task completion.
o They are normally delivered to the participant when the information isearned but may be given earlier to keep the scenario on the timeline.
o They may be communicated to the participants using the written messagesheet or verbally as determined by the controller.
If messages are delivered
- verbally, the controller must assure no communication error occurs.o Contingency messages/cue cards are delivered by Drill Coordinator orFacility Lead Controller to keep the scenario on the timeline when a majorevent has been missed or not completed.
o The scenario should document any expected data for classification, notification, and protective action recommendations (PAR).o Prepared preliminary notification forms may be included in the evaluator package as an evaluator aid to grade the PI opportunities.
o Contingencies are identified for actions or times where the potential mayexist for the progression of the drill/exercise to depart from the scenario.
" Drill Controller List: List of controllers, assignments, locations and contactinformation.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 11 OF 736.4.1 The scenario package may contain any or all of the elements listed in this section.(continued)
" Evaluation Forms: This material provides the demonstration criteria for eachobjective being evaluated.
" Meteorological, radiological and chemistry data: support data for both onsiteand offsite." Objectives:
List of objectives to be demonstrated, applicable facility ororganization, and extent of play (anticipated participant response to scenarioevents developed to provide a measure to assure that the objectives are met).* Summary:
Time-line, narrative
- summary, sequence of events, hypothetical data, messages, and contingency messages.
" Controller Instruction:
Controller organization, communication network,allowable simulations, precautions, safety considerations, and lessons learned." Participant Instruction:
General instruction to participants, including safetyconsiderations, controller interface, how data will be available, and responseexpectations.
- Joint Information Center support data: JIC material may be in a separatepackage from the scenario package.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 12 OF 736.5 SCENARIO SECURITY6.5.1 Scenario security shall be maintained for drill/exercise evaluated objectives and unannounced drills. (e.g., Secure drill manual out of sight when stored atyour work location and your work location is unattended, maintain control ofdrill manual or have other drill controllers assist, do not leave it unattended oropen for view by drill participants during an exercise or drill).6.5.2 Individuals involved in scenario development and drill/exercise control andevaluation need to ensure drill/exercise participants do not have advanceinformation about the scenario to ensure the evaluations are equitably andconsistently administrated.
6.5.3 Individuals who assist in the scenario development and validation may notparticipate as a participant for the associated scenario or drill.6.5.4 Each individual, except Federal, State, and Local agency representatives, knowledgeable of the scenario scheduled for a biennial exercise are expectedto sign a confidentiality agreement.
A typical agreement can be found inAttachment
- 12.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 13 OF 736.6 CONDUCT OF DRILLS AND EXERCISES 6.6.1 Before the drill/exercise starts:* If offsite agencies are participating ensure objectives and extent of play byoffsite agencies have been determined.
" Notify facility participants and drill/exercise controllers of their participation and conduct briefs. See guidelines in Attachment 10 for controller/evaluator and observer briefing and Attachment 13 for participant briefing.
" Ensure preliminary activities needed for conduct of the drill or exercises aretaken. Use Attachment 4 to conduct drill/exercise readiness checks.* Ensure controllers are at their assigned
- location, at least 30 minutes prior tostart of scenario.
- Ensure controllers establish drill control communications at least 15minutes prior to start of scenario.
- Inform offsite agencies and/or offsite controllers of the start of the exerciseor drill.* Inform the on-shift control room crew and the CAS/SAS operator of the drilland start time and any extent of play which may or may not involve theactual staff.* Make a plant announcement of the drill/exercise start and instructions fornon-participants.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 14 OF 736.6.2 During the drill/exercise:
- Start the drill/exercise at the scheduled timeline and following the Simulator Operations crew taking the shift.* Ensure the simulator events are run according to the scenario timeline andthat the data is flowing to the emergency response facilities.
- The Drill Coordinator controller may determine the need for modification ofscenario information, or if necessary, with concurrence of the Emergency Planning
- Manager, the suspension or termination of the drill/exercise.
- The lead simulator controller will inform the facility controllers when majorevents are about to occur.* If plant or personnel safety issues develop or ERO performance does notmeet expectations, all Facility Lead Controllers shall inform the DrillCoordinator.
- The OSC controller will keep the simulator controller informed of thedispatch and return of teams." Facility Lead Controllers may resolve discrepancies in data or fieldinformation with concurrence of the Drill Coordinator.
- Controllers shall distribute messages and cues as scheduled in thescenario with concurrence of the Facility Lead Controller or the DrillCoordinator.
" All controllers will inform the Facility Lead Controller of problemsencountered that impact the timeline and completion of major events.* Controllers will inform the simulator controller of events in the field beforethe participant informs the operating crew so that simulator fidelity ismaintained.
- Evaluators and controllers will maintain a chronological record of sequenceof events and participant responses in a sufficient detail in their assignedarea to provide an accurate record of activities.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 15 OF 736.6.3 Termination of the drill/exercise:
- The Drill Coordinator shall obtain concurrence from the Simulator Controller, Facility Lead Controllers, tfie Lead Offsite Controller and anyparticipating agency (local, state, and federal) that all applicable objectives were demonstrated and evaluated.
" Once concurrence is obtained, all controllers will agree on a termination time." Drill/exercise coordinator shall inform the control room and CAS/SAS thatthe exercise or drill is terminated.
- An announcement should be made over the plant paging system that thedrill/exercise is terminated.
- federal, state andlocal agencies and any state or federal agency controller/evaluators arenotified that the drill/exercise is terminated.
" The Facility Lead Controllers will coordinate the following activities:
-Verify all participants, controllers, and evaluators have signed anattendance sheet and collect all the sheets. (Observers may sign aseparate attendance sheet if a record is desired.
Observers do not getcredit for drill participation.)
-Ensure that all drill/exercise paperwork is collected from eachparticipant and ensure drill phone lists and all material stamped "This isa drill" is removed.-Hand out drill/exercise critique or feedback sheets to all participants with direction to complete the critique and focus on performance basedissues. Collect all completed sheets after the critique is complete.
6.7 DRILL AND EXERCISE EVALUATION 6.7.1 Drills and exercises should be evaluated against criteria identified by thespecific objectives.
6.7.2 Other observations of drill or exercise performance that require corrective action should be identified.
6.7.3 Corrective actions should be recommended for any findings identified by theevaluation.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 16 OF 736.7.4 Immediately after the drill or exercise, controllers should:.1 Distribute Comment Sheets to participants following the termination ofthe drill or exercise.
.2 Forward completed Comment Sheets to the Facility Lead Controller orEP.6.7.5 EP will compile the information from the evaluation forms, response records,drill data, participant
- comments, and other drill records and then shouldconduct a controller debrief to discuss these preliminary findings.
6.7.6 Manager, EP or designee should ensure the Controller debrief remainsfocused on evaluation of objectives, NOT the development of Corrective Action Plans.6.7.7 At the controller
- debrief, determine if the items in the preliminary findings arecritique report items, other findings, or not a finding.6.7.8 The preliminary status of each objective is listed on a "tally sheet" in order tofacilitate a synopsis review at the end of the Controller debrief.6.7.9 Initiation of Nuclear Notifications should be assigned to the cognizant Controller.
6.7.10 Facility Critique
-A critique meeting shall be conducted with personnel ineach facility at the conclusion of the drill/exercise.
Players should be providedthe opportunity to self-identify errors and performance deficiencies.
Controllers should then provide additional observations and evaluations.
6.7.11 Drill participants unable to attend the post-drill critique should be provided anopportunity to provide feedback using the Comment Sheet.6.7.12 Conduct Management Critique in accordance with S0123-XV-ERO-2.
6.7.13 Emergency Supplies
-Emergency response supplies and equipment, including forms and procedures, shall be restored and maintained following drills and exercises in accordance with Reference 2.2.1.6.7.14 Maintenance shall be notified of drill and exercise dates to allow them toschedule emergency tool kit inventories within 14 days following a drill orexercise.
NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17SO123-VIII-0.200 PAGE 17 OF 736.8 CORRECTIVE ACTIONS/EVENT TRENDINGNOTEPer Reference 2.2.9, all SONGS employees and supplemental personnel areresponsible for promptly identifying, reporting, and documenting problems bywriting an NN prior to leaving the site for the day.6.8.1 Observations identified as the result of drills and exercises shall be evaluated.
- In relation to applicable federal regulations, the SONGS Emergency Plan,and Emergency Plan implementing procedures, and* Using the Significance Determination Process (SDP) specified in NRCInspection Manual Chapter 0609, Appendix B..1 Observations are grouped in three categories as follows:" Deficiencies:
Items which identify that the EP program or procedures do notconform to the provisions of applicable federal regulations.
- Weaknesses:
Items of documented performance that could have precluded effective implementation of the Emergency Plan in the event of an actualemergency.
- Other Issues: Items not quality affecting or of regulatory concern.
Theseare items noted for trending purposes and actions intended to improve theemergency preparedness program..2 EP personnel are to generate Nuclear Notifications (NNs) for issues relatedto 10CFR50.74(b) planning standards (Reference 2.3.7)..2.1 Include the following information in the NN:* Is it a risk significant planning standard (RSPS)?* Is it a deficiency,
- weakness, or other issue?* The Division responsible for resolution.
.3 Disposition an identified
- weakness, deficiency, or other issue perReference 2.2.5.
NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17SO123-VIII-0.200 PAGE 18 OF 73NOTEThe Risk Significant Planning Standards are 10CFR50.47(b)(4),
50.47(b)(5),
50.46(b)(9),
and 50.49(b)(10).
All other 10CFR50.57(b) planning standards arenot risk significant.
6.8.2 A Risk Significant
[50.47(b)]
Planning Standard (RSPS)-related drill/exercise performance weakness is corrected within 90 days of.identification or beforethe next ERO site wide drill/exercise, whichever is sooner (Reference 2.3.5).6.8.3 A Planning Standard-related drill/exercise performance weakness is corrected within 180 days of identification.
6.8.4 Resolution of other drill/exercise issues (betterment) will be resolved withinthe next biennial exercise cycle.6.8.5 Findings identified as Other Issues should be entered into the yearly drillOperating Experience (OE) Rollup Report..1 IF a trend indicating a potential weakness is identified, THEN corrective action shall be taken per Reference 2.2.5.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 19 OF 736.9 TABLETOP AND MINI-DRILL TRAININGNOTES1) Tabletop training is presented in a lecture and/or discussion format without exercising orevaluating the players.2) Mini-drill training includes player participation and evaluation, simulating elements of drillsor special topics.6.9.1 Tabletops/mini-drills should be conducted periodically to provide training toEmergency Response Personnel and to correct identified drill weaknesses ordeficiencies.
6.9.2 Develop an outline and determine the objectives of the tabletop/mini-drill.
Consider the following topics:* Lessons learned from previous drills, focusing on the "Top Three" past drillweaknesses
" Facility changes* Computer system changes* Key personnel changes* EPIP changes* Training issues* Resource materials update* Telecommunications changes* Administrative changes* Emergency planning topics* Industry events6.9.3 Mini-drill preparation should incorporate the applicable elements ofSection 6.3.
NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17SO123-VIII-0.200 PAGE 20 OF 736.10 DRILL AND EXERCISE REPORT GENERATION 6.10.1 The preliminary report for the biennial exercise should be completed prior tothe agreed upon NRC exit meeting.NOTERemedial Exercises will be required on a case-by-case basis when any of thefollowing conditions associated with the biennial exercise occurs:Confidentiality is compromised to an extent that broadly affects EROperformance The scenario does not provide the opportunity for demonstration of key skillsThe scenario is not implemented in such a way that provides the opportunity fordemonstration of key skillsERO performance does not provide the NRC with a basis to determine that keyskills have been maintained Additionally, the extent of State and Local participation must be sufficient toshow that appropriate corrective measures have been taken regarding theelements of the plan not properly tested in previous exercises.
6.10.2 The final biennial exercise report should be approved by the Manager,Emergency Planning and distributed within 30 days of the exercise.
6.10.3 Reports for drills involving the formal evaluation of NRC DEP performance indicators and/or performance objectives should be completed, approved bythe Manager-Emergency
- Planning, and distributed within 30 days of thedrill.6.10.4 Reports for training drills not involving the evaluation of ERO performance (designated objectives or DEP) are not required.
Actions may be generated per the corrective action process in EN-LI-102 to address facility, equipment, process or procedure issues identified during the training session.6.10.5 Attachment 14 provides an example of a typical drill/exercise drill report toshow the desired minimum report content.6.10.6 The EPM, or designee, will distribute the report electronically to sitemanagement team members and emergency response facility leads.
NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 21 OF 737.0 RECORDS7.1 Drill and Exercise Records -Data records, logs, etc., used by participants totransmit or record information shall be collected by the controllers at the end ofthe mini-drill, drill or exercise and forwarded to the Facility Lead Controller.
7.1.1 All controllers and participants including
- trainees, shall sign trainingattendance records in accordance with Reference 2.2.6.7.1.2 Attendance records shall be forwarded to NTD for recording attendance.
7.1.3 Additional pertinent records (Response
- records, data records and logs,participant comments etc.), shall be kept until the end of the current 2-yearEP Program Inspection Cycle.7.1.4 Scenarios used to conduct drills and exercises by EP in accordance withPeriodic Drill and Exercise Requirements (Attachment
- 2) shall be maintained in EP files.7.2 The completed written critique report shall be sent to CDM-SONGS within threemonths of the date it is signed.7.2.1 The critique report transmittal shall include the signed critique reportcontaining a list of drill objectives and the drill summary document.
7.2.2 A copy of the written critique report shall be kept on file at EP for a period ofsix years.7.2.3 The written critique report should be made available to members of the ERO.
NUCLEAR ORGANIZATION EPIP S0123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 22 OF 73ATTACHMENT 1Periodic Drill and Exercise Requirements A. BIENNIAL1. FEMA graded exercise
-each State within the 10-mile EPZ of a commercial nuclearpower site shall fully participate in an exercise jointly with the licensee and appropriate local governments at least every two years (Reference 2.3.2) (EP, OEP).2. Integrated NRC Graded Exercise
-tests the integrated capability and a major portionof the basic elements of the Emergency Plan (EP, OEP).a. Off-hours activation once every 6 years.b. Unannounced exercise once every 6 years.c. Federal Agency participation once every 6 years.B. ANNUAL1. Medical Emergency Drill -participation by some, if not all, of the local medical supportpersonnel and organizations (e.g., physicians, ambulance
- services, and hospitals) andshall involve one or more contaminated/injured individual(s)(EP, RP, SCE Medical).
- 2. Environmental Monitoring Drill -collection and analysis of radiological sample media(e.g., water, air, soil and vegetation) both onsite and offsite (should include recordkeeping and communications).
Does not necessarily include analysis of samples withactual elevated levels of radiation (EP, Chemistry, RP, Environmental Monitoring).
- 3. Field Team Communications Drill -communications links between SONGS EOF andState and local Emergency Operations Centers (EOCs) and field assessment teams(OEP, EP).4. Fire Drill -participation by Camp Pendleton Fire Department (San Onofre FireDepartment).
C. SEMI-ANNUAL
- 1. Health Physics Drills -response to simulated abnormal airborne and liquid samplesand direct radiation measurements in the site environs, and analysis of these samples.Does not necessarily include analysis of samples with actual elevated levels ofradiation (EP, Chemistry, HP).D. QUARTERLY
- 1. Fire Drill -at least one drill per shift per calendar quarter for SONGS Fire Department.
These drills are conducted in accordance with the Firefighters Training Program (Drillsmeet NFPA Code 600) (San Onofre Fire Department).
E. MONTHLY1. Communications Drill -communication links with Federal, State, and localgovernments within the plume exposure Emergency Planning Zone in accordance withsurveillance procedures.
The surveillance procedure, when completed, will serve as awritten critique (Operations, EP).ATTACHMENT 1PAGE 1 OF 1 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 2SO123-VIII-0.200 PAGE 23 OF 73Matrix of Drill and Exercise Oblectives SONGS __ (year)# Objective Ref. Freq Drill Num. Next Drill Num.Last Year Scheduled Performed Due1 Exercise must reach SAE or A BGE2 Exercise tests offsite A Bemergency response whichsimulates conditions resulting in offsite radiological releaseswhich would require protective response by offsites3 Exercise conducted back-shift L Abetween 1800 -0400 A 6 YNOTE: Document requests foroffsite participation andresponses in theCOMMENTS Section.4 Unannounced drill L AC 6YN.1.b5 Exercise conducted under C 6 Yvarious simulated weather N.1.bconditions 6 Exercise includes participation A Bby 1+ offsite agency7 Exercise (should) include State A 6 Yof CA participation, w/offsites participating 8 Exercise (should) include A 6 YFederal Agencies9 Contaminated/injured person A Adrill w/some local medical B 6 Ysupport personnel participating 03.02.b.5 CL.1, L.4,N.2.c, O.4.h10 Environmental Monitoring Drill, A Asampling water AND air AND Csoil AND vegetation from onsite N.2.dAND offsite sources, andshould include record-keeping AND communications 11 Sampling AND analysis of A Sabnormal airborne samples IIII_ IATTACHMENT 2PAGE 1 OF 6 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 2SO123-VIII-0.200 PAGE 24 OF 73Matrix of Drill and Exercise Oblectives SONGS __ (year)Objective Ref. Freq Drill Num. Next Drill Num.Last Year Scheduled Performed Due12 Sampling AND analysis of A Sabnormal liquid samples13 Direct radiation measurement A Sin the site environs (may besatisfied by #11 or 12)14 Field team communications A Abetween:
EOF-State AND 8.1.3.7EOF-local EOCs AND EOF-field teams15 Exercise should include:
B Aaccident detection and 03.02.a.1 assessment C1.1, 1.216 Exercise should include:
B Aemergency classification 03.02.a.2 CD.1, D.217 Exercise should include:
B Anotification of onsite and offsite 03.02.a.3 emergency responders CE.1, E.2, E.3,J.118 Exercise should include:
B Acommunications 03.02.a.4 CE.2, E.4, F.1,F.2,H.6D8.1, 8.2, 8.3,8.419 Exercise should include:
B Aradiological exposure control 03.02.a.5 CJ.3, J.6, K.1,K.2, K.3, K.5,K.6,ATTACHMENT 2PAGE 2 OF 6 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 2SO123-VIII-0.200 PAGE 25 OF 73Matrix of Drill and Exercise Objectives SONGS __ (year)# Objective Ref. Freq Drill Num. Next Drill Num.Last Year Scheduled Performed Due20 Exercise should include:
B Aprotective action 03.02.a.6 recommendations CJ.721 Exercise should include:
staff B Aaugmentation 03.02.a.7 CA.1, A.3, A.4,B.7, B.8, B.922 Exercise should include:
shift B Astaffing 03.02.a.8 CB.1, B.2, B.3,B.5DTable 223 Exercise w/Off-hours staffing L A(1800 -0400) B 6 Y03.02.b.1 NOTE: Document requests for Coffsite participation and N.1.bresponses in the (Rev. 1,COMMENTS Section.
Supp. 1)24 Exercise w/Activation of Joint G BInformation Center Table 4B 6Y03.02.b.2 CG.3, G.425 Exercise w/Use of Fire Control B 6 YTeams 03.02.b.3 CN.2.b, O.4.d26 Exercise w/Use of First Aid B 6 Yand/or rescue teams 03.02.b.4 CK.1, K.2, K.3,K.4, K.5, L.2,O.4.fATTACHMENT 2PAGE 3 OF 6 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 2SO123-VIII-0.200 PAGE 26 OF 73Matrix of Drill and Exercise Obiectives SONGS __ (year)# Objective Ref. Freq Drill Num. Next Drill Num.Last Year Scheduled Performed Due27 Exercise w/security personnel B 6 Yproviding prompt access for 03.02.b.7 emergency equipment and Csupport O.4.d28 Exercise w/use of backup B 6 Ycommunications 03.02.b.8 CF. 129 Exercise w/rumor control G BTable 4B 6Y03.02.b.9 CG.4.c30 Exercise w/use of emergency B 6 Ypower (where not a part of 03.02.b.10 plant safety systems, e.g., DTSC) 8.2.131 Exercise w/evacuation of B 6 YEmergency Response Facilities 03.02.b.
11and relocation to backup ERFs E3.232 Exercise w/ingestion pathway B 6 Yexercise 03.02.b.12 CJ.9, J.11NOTE: State of CA rotates this G6Y frequency between nuclear Table 4sites33 Exercise w/field monitoring, B 6 Yincluding soil, vegetation, and 03.02.b.13 water sampling C1.7,1.8,1.11 34 Exercise w/capability for B 6 Ydetermining the magnitude and 03.02.b.14 impact of the particular Ccomponents of a release 1.3, 1.4, 1.6,1.8,1.9, 1.10ATTACHMENT 2PAGE 4 OF 6 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 2SO1123-VIII-0.200 PAGE 27 OF 73Matrix of Drill and Exercise Oblectives SONGS __ (year)# Objective Ref. Freq Drill Num. Next Drill Num.Last Year Scheduled Performed Due35 Exercise w/use of potassium B 6 Yiodide 03.02. b. 16CJ.6.c36 Exercise w/assembly and B 6 Yaccountability 03.02.b.
17CJ.537 Exercise w/recovery and B 6 Yreentry 03.02.b.18 CM.138 Exercise with Severe Accident H 3 YManagement 39 Exercise with Hostile J 6 YAction-Based Scenario40 Exercise with Extensive K 6YDamage Mitigation 41 Exercise with B.5.b Time- M 8YSensitive Action-Depressurize and Make Up toSteam Generators (2 hrs)42 Exercise with B.5.b Time- M 8YSensitive Action-Make up to Spent Fuel Poolfrom External Source (2 hrs)43 Exercise with B.5.b Time- M 8YSensitive Action-Spray Spent Fuel Pool fromExternal Source (2 hrs)44 Exercise with B.5.b Time- M 8YSensitive Action-Manually Operate Turbine-Driven Auxiliary Feed WaterPump (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)yy = last two digits of the yearxx = last two digits of the drill numberzz = specific drill objective numberFreq. B=biennial, S=semi-annual, A=annual, Y=yearsATTACHMENT 2PAGE 5 OF 6 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 28 OF 73ATTACHMENT 2Matrix of Drill and Exercise Objectives SONGS __ (year)COMMENTS:
References:
A -Emergency PlanB -NRC Inspection Manual, Inspection Procedure 82302, "Review of Exercise Objectives andScenarios for Power Reactors" (Superseded by NRC Inspection Procedures 71114.01 and71151. Retained as reference for response to CAR 971100692-8 and AR 970601893, only.C -NUREG 0654, "Criteria for Preparedness and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants"D -NUREG 0737, Supplement 1E -NUREG-0696, "Functional Criteria for Emergency Response Facilities" F -MOSAIC/RCTS commitment (provide commitment number)G -FEMA Interim Radiological Emergency Preparedness (REP) Program Manual, August 2002H -AR 060200801-01 J -NRC Bulletin 2005-02:
Emergency Preparedness and Response Actions for Security-Based EventsK- NN 200105582-19 L -Annual, unannounced, drive-in response drill, NN 201809145-CA0002 (beginning calendaryear 2013)M -NN 201866328-CA0001 NOTE: Review that all major elements are tested within 6 years.All objective(s) due this year are scheduled.
PREPARED BY:Emergency Planning Staff MemberAPPROVED BY:Manager, Emergency PlanningAll objective(s) due this year were tested or Nuclear Notification(s) written and the objective(s) rescheduled.
REVIEWED BY:Emergency Planning Staff MemberAPPROVED BY:Manager, Emergency PlanningATTACHMENT 2PAGE 6 OF 6 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 29 OF 73ATTACHMENT 3SCENARIO DEVELOPMENT TEAM AND RESPONSIBILITIES NOTEThe Scenario Development Team (SDT) is chaired by the Drill/Exercise Coordinator, as designated by the Emergency Planning
- Manager, who has overall responsibility for the drill and scenario.
Theteam size and members may vary and will be dictated by the desired objectives and extent of play ofthe drill/exercise.
The following are recommended team member responsibilities.
Team members willbe selected and assigned responsibilities based on their area of expertise 1.0 Emergency Planner/Drill Coordinator
- Select performance objectives, extent of play, and evaluation criteria.
- Responsible for ensuring that all data required to drive the scenario or to enhance EROparticipant's demonstration of objectives, is provided in the scenario package.* Develop the scenario narrative, events and expected response.
- Identify and coordinate additional resources, as necessary, for participant, controller orevaluator positions (e.g., offsite fire department, emergency medical services, peers fromother licensees, federal agents).* Compile scenario data / materials in a standardized format.* Provide a peer review of scenario content to assure expected ERO response and technical content is accurate.
- Identify operating experience, lessons learned, or improvement actions to incorporate intothe scenario.
2.0 Emergency Planning Staff* Assist in the development of the scenario and provide input to the Drill Coordinator.
- Coordinate the simulator data capture and deliver to the EP group in a useable format forinput to the scenario package.* Schedule simulator development and validation sessions in the Learning Management System.* Attend Scenario development/validation sessions.
- Provide a peer review of scenario content to assure expected ERO response and technical content is accurate.
- Identify operating experience, lessons learned, or improvement actions to incorporate intothe scenario.
ATTACHMENT 3PAGE 1 OF 4 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 30 OF 73ATTACHMENT 3SCENARIO DEVELOPMENT TEAM AND RESPONSIBILITIES 3.0 Operations Senior Reactor Operator/Certified Fuel Handler* Select and verify the accuracy of EALs in the scenario.
- Provide details and develop all messages to be given to the operations crews membersparticipating in the drill.* Determine probable and possible operator actions in response to scenario events. This is toensure that the scenario anticipates actions and all actions are considered.
" Attend Simulator development
- sessions, as available.
- Attend Scenario development/validation sessions.
" Create 'normal' Control Room paperwork, (e.g. shift turnover logs, Tech Spec log, NightOrders, and Danger Tag series) as applicable and ensure paperwork indicates "DRILL.".
" Provide and assemble all pertinent data for any assigned supplemental (mini) scenarios.
- Function as a controller/evaluator for the developed drill.4.0 Training Instructor
- Attend or conduct simulator development sessions.
- Provide Simulator capabilities, limitations, and options to model given desired events.* Capture simulated data and prepare a hard copy of the simulator data for the scenariopackage.* Ensure a qualified booth operator is available to setup and run the simulator for the drilldevelopment and validation.
- Function as a controller/evaluator for the developed drill (as assigned).
- For exercises, prepare a hard copy of the simulator data in case of simulator failure.5.0 Radiation Protection(RP)
" Review radiological data presented by and/or retrieved from the Simulator or other dosemodels." Provide details to be included in any radiological messages to be given out during the drill." Determine probable and possible radiation protection actions in response to scenarioevents. (This is to ensure the scenario anticipates all possible and probable actions and allsuch 'paths' are provided for.)" Attend Scenario development/validation sessions* Provide on-site/in-plant radiological data to include re-entry team maps, if it is beingdemonstrated.
- Assist in creating data for off-site monitoring team controllers, to include; plume maps, fieldteam data, and open/closed meter readings.
" Assist in converting off-site data for use by state team controllers (e.g. efficiencies, instrumentation, etc.)" Provide and assemble all pertinent data for any assigned supplemental (mini) scenarios.
" Function as a controller/evaluator for the developed drill.ATTACHMENT 3PAGE 2 OF 4 NUCLEAR ORGANIZATION EPIP S0123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 31 OF 73ATTACHMENT 3SCENARIO DEVELOPMENT TEAM AND RESPONSIBILITIES 6.0 Dose Assessment (may be the same RP as above)" Review radiological data presented by and/or retrieved from the Simulator or other dosemodels.* Provide details to be included in any Field Monitoring Team or dose assessment messagesto be given out during the drill." Determine probable and possible radiation releases in response to scenario events. This isto ensure that the scenario anticipates all possible and probable release paths." Attend Scenario development/validation sessions.
" Assist in creating on-site/in-plant radiological data to include re-entry team maps.* Create data for off-site monitoring team controllers, to include; plume maps, field team data,and open/closed meter readings.
- Assist in converting off-site data for use by state team controllers (e.g. efficiencies, instrumentation, etc.)* Provide and assemble all pertinent data for any assigned supplemental (mini) scenarios such as collection and analysis of samples.* Function as a controller/evaluator for the developed drill.7.0 Maintenance (MM, EM, I&C)* Provide routine maintenance forms (e.g., WOs, PMs, surveillances, work packages etc.) forthe scenario equipment.
- Provide static information on work-in progress at the time the scenario begins (as required).
- Provide details to be included in any maintenance messages to be given to maintenance personnel during the drill.* Attend Scenario development/validation sessions.
- Assist in determining probable and possible maintenance actions in response to scenarioevents. This is to ensure that actions anticipated by the scenario are considered.
- Provide or recommend mock-ups to be used to provide realism for applicable maintenance personnel.
- Provide and assemble all pertinent data for any assigned supplemental (mini) scenarios.
- Function as a controller/evaluator for the developed drill (as assigned).
8.0 Joint Information/News Center Representative
" Develop messages to test the media monitoring, call centers, and/or public inquiry/rumor control of the Joint Information/News Center" Provide the applicable controllers with the expected protective actions and probable EASmessages.
- Attend Scenario development/validation sessions.
- Coordinate media monitoring scripts and expectations with the simulated media participants.
- Function as a controller/evaluator for the developed drill (as assigned).
ATTACHMENT 3PAGE 3 OF 4 NUCLEAR ORGANIZATION EPIP S0123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 32 OF 73ATTACHMENT 3SCENARIO DEVELOPMENT TEAM AND RESPONSIBILITIES 9.0 Engineering (Mechanical, Electrical, and Reactor)" Provide details to be included in any messages to be given to the field teams.* Provide and assemble all pertinent data for any assigned supplemental (mini) scenarios orscenario content.* Attend Scenario development/validation sessions.
- Function as a controller/evaluator for the developed drill (as assigned).
10.0 Chemistry (as required by the scenario)
" Review chemistry data presented by and/or retrieved from the Simulator.
" Provide details to be included in any messages to be given to the field team." Provide and assemble all pertinent data for any assigned scenario data." Attend Scenario development/validation sessions.
- Function as a controller/evaluator for the developed drill (as assigned).
11.0 Security
/ Fire and/or Medical team (as required by the scenario)
- Provide details to be included in any messages to be given to the field teams." Provide and assemble all pertinent data for any assigned supplemental (mini) scenarios.
" Attend Scenario development/validation sessions.
" Function as a controller/evaluator for the developed drill (as assigned).
12.0 Senior ERO Leader (Preferable CED or SED)" Provide oversight on the Scenario Selection and flow* Provide concurrence on initiating events and correct responses for Classification, Notification and PAR related events.* Attend Scenario development/validation sessions.
ATTACHMENT 3PAGE 4 OF 4 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 4SO123-VIII-0.200 PAGE 33 OF 73Owner Status Lead Due Comments Completed Description or FIC Date / Restraints Date1 Develop Drill Checklist (A) -105Provide Drill date or change of Drill2 date to Assistant On-Line Work Mgr in -10515-Week Work Window (SSR) (A)Choose Scenario Development Team(A) -84Schedule Simulator time for line items25, 32 and 140 (C) -84Coordinate EP Sim. Dev. Sched. w/OPS & NTD (B) -846 Review Drill Requirements/Objectives
-566 (A)Review NNs/Inspection Reports (A)7 -568 Develop Confidentiality Form (A) -56Meet to Develop Original Scope (A)Draft Mock NRC Team Roster10 -56Determine if state will participate onBlue Phone (B) -49Determine YPS stations that will12 participate in drill (B) -4913 Develop Drill-Specific Objectives (A)14 Develop Offsite Objectives (A)-4915 Develop JIC Objectives (A) -4916 Design Basic Scenario (G) -4917 Prepare draft Drill Participant Roster 49(B)Drill Planning Meeting (P)18 -49Sched. Rooms for Controller Debrief19 (C) -4220 Sched. Rooms for Management
-42Critique (C)Sched. Room for Controller Pre-drill 21 Brief (C) -4222 Sched. Venues for Pre-drill Briefing (C) -4223 Sched. Venues for Walkthroughs (C) -42Schedule VP/Station Mgr. Pre & Post 4224 Drill Briefing (C) -42ATTACHMENT 4PAGE 1 OF 7 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 4SO123-VIII-0.200 PAGE 34 OF 73Status Due Comments Completed Description or F/C Date / Restraints Date25 Simulator Run #1 (Verification)
(G) -4226 Drill Planning Meeting (P) -4227 Finalize Mock NRC Team Roster -4228 Schedule Offsite Controller Briefing (C) 35Identify Required Drill Controller 29 Positions (B) -3530 Schedule Required Drill Controllers (B) -3531 Draft/Submit VP letter to Mgr./Supv.
(K) 3532 Notify Meteorologist of Drill (D) -35Simulator Run #2 (Validation)
(G) 3534 Identify/Develop Props (G) -3535 Identify/Develop Casualty Props (G) -3536 Drill Planning Meeting (P) -35Email Evacuation Drill EPB to SitePersonnel (K) -2838 MTCE Develop.
Session (P) -2839 OPS / SIM Develop.
Session (P) -2840 Admin. Develop.
Session (P) -28ENG Develop Session (P)41 -2842 Security Develop.
Session (P) -28Develop Controller/Observer Rosterand List (G) 28Develop Offsite Cue Cards, including 44 additional "rumor control" for the ENC -28(G)45Inspect Evacuation Signs and Routes(K)-28Identify Local Assembly Area46__ Supervisors (K)Check Local Assembly Area Signs/E-
-28kits (K)48 Develop Patient Algorithms (M) -28ATTACHMENT 4PAGE 2 OF 7 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 4SO 123-VIII-0.200 PAGE 35 OF 73Owner Status Ld Due Comments Completed Description or FIC Date /Restraints Date49 Drill Planning Meeting (P) -28Coordinate SSR with Security for Fire50 Dept support -2151 Identify and Train Vanpool Drivers for 21Site/Mesa (K)52 Update Assembly Area Instructions (K) -21Email Assembly Area Supv.Responsibilities (K) -21Email to Vanpoolers re: action @ Alert -21(K)55 PRA Analysis of Scenario (P) -21Notify GOC of Drill(realtimesm@sce.com)
(D)57 Notify GCC of Drill (John Bocka) (D) -2158 Notify SDG&E of Drill (Mike -21DeMarco)
(D)Notify ANI of Drill (Ed Everett 860-682-
-211301- ext. 238) (D)60 Notify Saddleback District Office of Drill -21& Reserve JIC (D)61 Drill Planning Meeting (P) -2162 Chemistry Development Session (P) -2163 Develop/Transmit Communications
-21Package (N)Develop Cue Cards/Sequence of64 Events (G) -2165 Develop Evaluation Forms (G) -2166 Develop Morning Report / Shift Relief -21Forms (G)67 Develop Participant Comment Sheet -21(G) -2168 Develop Response Record (G) -2169 Develop Instructions to Drill Controllers
-21(G)70 Develop Guidelines for Drill Conduct -21(G)71 Develop Objectives Document (G) -2172 Develop Extent of Play Document (G) -21ATTACHMENT 4PAGE 3 OF 7 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 4SO 123-VIII-0.200 PAGE 36 OF 73Owner Status Lead Due Comments Completed Description or F/C Date / Restraints Date73 Develop Raddose V Database (H) -2174 Develop MET Data (H) -2175 Develop Survey Maps (Onsite)
(H) -2176 Develop Plant Data (Cont & Player) (H) -2177 Develop Rad Monitor Data (H) -2178 DevelopNalidate PIC Data (H) -21Develop Survey Maps and Data79 (Offsite)
(H) -21Develop Drill Participants Roster (D)80 -2181 Check Objectives Against Cue Cards -2181_ (G)82 Develop Chemistry Data (H) -2183 Review Survey Maps and Data -2183__ (Offsite)
(H)84 Develop Attendance Records (Facility
-21Positions)(G) 85 Final Review of Scenario Documents
-20Prior to Copying (I) (P)Notify Managers of Managers Critique86 Meeting (D) -1487 Sched E50 Classroom for Simulator
-14Prebrief and Debrief (C)88 Coordinate Food Service/Catering (D) -14(Manager 3 Approval Required) 89 Add Observers to Controller List (I) -1490 Notify EOF Personnel of Drill -14Date/Time (D)91 Notify Work Window Manager (D) -14Obtain site access for offsite controllers 92 (M) -14Develop Participant and Controller e- -14mail Lists (E)94 Update Non-ERP Coloring Books (K) -14List of Exempt PA Personnel (K) -1496 Coordinate Siren Surveillance.
(0.302) -14(L) -14ATTACHMENT 4PAGE 4 OF 7 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 4SO123-VIII-0.200 PAGE 37 OF 73Owner Status Due Comments Completed Description or F/C Date / Restraints Date97 Complete Moulage Training (M) -1498 Issue final EPIP changes (M) -14Schedule Venue for Mock NRC99 Training
-14100 Drill Planning Meeting (P) -14101 Final Review of Plant Data Prior to -14__01 Copying (H)102 Develop Pre-drill Briefing (J) -12103 Final Review Pre-drill Briefing package103_ (J)104 Develop and test drill recall message -9Assemble Controller Notebooks/Data
-8105 books (1)106 Email Reminder re: Controllers Meeting -8(D)107 ODAC Pre-Job Briefing (J) -7108 Coordinate Closure of 70' lunchroom 7(Jimenez)
(D) -7109 Verify Casualty Scene Setup (M) -7110 Assemble Observer Package (I) -7ill Verify Simulator Setup (L) -7112 Notify Edison Operator of drill date/time 7(D)113 Notify Local & State Authorities of Date 7and On-site Sirens (D)114 Notify TCC (949-587-5500) of Date and 7On-site Sirens (D) -7115 Notify O.C. 911 Center (714-628-7008) 7of Date and On-site Sirens (D)116 Notify USMC/State Parks of Date and 7On-site Sirens (D)117 Notify Marine Rec. Facility of Date and 7On-site Sirens (John Preston)
(D)118 Drill Planning Meeting (P) -5119 TSC Controller Walkthrough (M) -2120 OSC Controller Walkthrough (M) -2ATTACHMENT 4PAGE 5 OF 7 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 4SO123-VIII-0.200 PAGE 38 OF 73Owner Status Lead Due Comments Completed Description or F/C Date / Restraints Date121 EOF Controller Walkthrough (M) -2OPS / Simulator Controller 122 Walkthrough (M) -2123 Sim Cell Walkthrough (M) -2124 TSC Pre-Job Briefing (J) -2125 OSC Pre-Job Briefing (J) -2126 EOF Pre-Job Briefing (J) -2127 Brief NRC Resident Inspector
-2128 Brief On-shift SM -2129 Raddose V Computer Operational
-1Check (M)130 Pre-Drill CFMS Test (M) -1HP Computer Data Entry (M) -1131 -132 Disable Emergency Recall System 10810 Daily Test (M)133 Pre-Job Controller Briefing (M) 0134 OPS Crew Pre-shift Briefing (M) 0135 CONDUCT DRILL 0Sched. Mgmt. Critique Pre-Meetings as136 required (N) 1Post Drill Briefing of VP & Station137 Manager (N)Determine Number of Teams138 Dispatched (N) 1139 Develop Offsite Notification Timeline(N)Develop Anticipated/Actual Timeline140 (N) 1141 Develop Source Term Projection (N) 2Correlate Actual vs. Prepared Drill Data142 (N) 2143 Controller De-Briefing (N) 2144 Apply Significance Determination 2Process to Drill Findings (N) 2ATTACHMENT 4PAGE 6 OF 7 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 4SO123-VIII-0.200 PAGE 39 OF 73Owner Status Lead Due Comments Completed Description or FIC Date /Restraints DateDevelop Management Critique Meeting145 Package (N)146 Conduct Management Critique Meeting 7(N)Schedule NRC Critique Debrief147 Meeting (N)148 Post-Drill E-Kit Survey (N) 14149 Post-Drill Notebooks Survey (N) 14150 Submit Attendance Sheets to T2000 14(N)151 Update SO123-VIII-0.200 Objective 14Matrix (N)152 Post Drill Checklist Meeting (N) 14153 Develop/Distribute Final Drill Critique 30Report (N)154 Archive Records (N) 42(A)(B)(C)(D)(E)Files(F)(G)Documents (H)(I)(J)(K)(L)(M)(N)(0)(P)Preparatory WorkPreliminary ItemsScheduling Notifications Initial Controller Package -PDFInitial Player Package -PDF FilesDeveloping the Scenario and DrillDeveloping Drill DataAssemble Drill PackagesTraining Activities Evacuation Drill Preparations Check Misc. Equipment Final Preparations and DrillPost-Drill Activities Drill Specific Misc.Planning Activities ATTACHMENT 4PAGE 7 OF 7 NUCLEAR ORGANIZATION EPIP S0123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 40 OF 73ATTACHMENT 5CONTROLLER/EVALUATOR ORGANIZATION 1.0 Controllers/Evaluators shall be qualified by completing controller/evaluator training within thelast 12 months prior to participating in a drill/exercise.
2.0 Controller general rules* Training and mentoring/coaching is not permitted during NRC graded biennial exercises ordrills where the EPM determines performance indicators or other objectives may beevaluated.
- Controller interface with participants is limited to:o Messages and communications planned in the scenarioo After the participant has attempted to perform a task, the controller determines theincorrect method should be corrected on the spot (site training drills only) withnecessary instructions to maintain the scenario schedule.
Coaching for correction onthe spot should only be for significant procedure steps or processes and should benoted on the controller timeline.
o Any inject to stop an industrial safety, radiological or security unsafe practiceo To keep the scenario on track or correct information that can negatively impact thescenarioo Communications between controllers shall be performed in a way that does notprovide unintended cueing to drill players.o Any inject determined necessary to advance the scenario in the intended direction must be approved by the Drill Coordinator.
o The individual designated by the EPM to coordinate the conduct of the drill or exerciseis the Drill Coordinator.
All drill/exercise controllers, evaluators and observers areresponsible to the Drill Coordinator.
Drill Coordinator is responsible for:* The safe conduct of the drill/exercise.
- Controller and evaluator pre-drill/exercise brief.* Establishing start time for the drill/exercise and coordinate the start with thecontroller/evaluator staff.Interfacing with the Facility Lead Controllers to resolve any inter-facility questions concerning the drill/exercise scenario.
The Drill Coordinator should be stationed in an area where they cannot be seen or heardby drill players to prevent unintended cueing to drill players.Determining the extent, if any, of "free play" that will be permissible on the part of theERO participants (particularly in the Simulator).
Terminating the drill/exercise upon receiving verification from the Facility LeadControllers (and State lead controller in an exercise) that the objectives have beendemonstrated.
Stopping the drill/exercise if events have occurred which require that resources bedirected to the resolution of an actual problem or emergency.
ATTACHMENT 5PAGE 1 OF 5 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 41 OF 73ATTACHMENT 5CONTROLLER/EVALUATOR ORGANIZATION 3.0 (continued)
Advising Facility Lead Controllers of unanticipated simulator problems and scenariodeviations
/ time adjustments, as necessary, (Only the Drill Coordinator can authorize adjustments in the sequence of events.)Ensuring the following handouts are prepared prior to the drill and distributed, asnecessary, to the controllers and evaluators during their final briefing:
o List of drill/exercise controllers and evaluators o List of controller phone numberso List of drill/exercise participants for the applicable facility (optional) o Attendance sheets (Facility Lead Controller) o Evaluation checklists o Scenario,
- messages, and timelineo A controller will be assigned to each participating Emergency Response Facility (ERF)to be responsible for all scenario related activities in that facility and will be designated as the Facility Lead Controller.
Facility Lead Controller is responsible for:* All controller, evaluator and observer activities for that facility and its associated EROteam.* Monitoring issuance of scenario messages and completion of scenario inputs with DrillCoordinator
- Maintaining a comprehensive log of events to aid in compiling event reconstruction forthe drill report.* Assuming the roles of simulated representatives for NRC and other agencies notparticipating in the drill.* Ensuring attendance sheets are completed for the facility.
- Modify drill messages if required after approval by the Drill Coordinator.
- Summarizing all participant/evaluator/controller comments and evaluations onperformance.
Preparing the drill report for their facility.
o Controllers are responsible for:* Verifying or completing controller/evaluator briefing and training.
- Maintaining scenario confidentiality and signing a security agreement.
- Providing drill injects to the participants and keeping the scenario on track by ensuringthat the actions of the participants do not jeopardize the rest of the scenario.
- Keeping a chronological timeline of events/problems for the area controlling.
- Ensuring the work place and facilities are left in a restored state when the drill/exercise isover.Attending the facility
- critique, unless excusedATTACHMENT 5PAGE 2 OF 5 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 42 OF 73ATTACHMENT 5CONTROLLER/EVALUATOR ORGANIZATION o Controller Instructions
- Before the drill/exercise o Be familiar with the overall exercise scenario and the performance objectives for theassigned area.o Review the appropriate procedures and protocols.
o Attend the required controller and evaluator briefing.
o Maintain scenario confidentially.
o Report to the assigned location approximately 30 minutes before start time.o Establish controller communications (bridge line and/or radio approximately 15 minutesbefore start time.o Clearly identify yourself as a controller or evaluator at the beginning of the drill/exercise and/or wear controller identification.
o Remind participants to use identification tools (e.g., badges, vests, arm bands).During the drill/exercise o Avoid personal conversations with any participant.
o Do not provide information unless it is requested or earned by the participants and then,only within the limits of the scenario.
o Do not give information to the participants regarding event progress or resolution ofproblems encountered by others. Participants are expected to obtain information throughtheir own resources.
o Controllers shall distribute messages and cues as scheduled in the scenario withconcurrence of the Facility Lead Controller or the Drill Coordinator.
o All controllers will inform the Facility Lead Controller of problems encountered thatimpact the timeline and completion of major events.o Do not accelerate the drill/exercise by providing information ahead of schedule.
o Suspend local play for safety reasons and, if necessary, recommend to the DrillCoordinator the suspension of the whole drill.o Inform the simulator controller of events in the field before the participants inform theoperating crew so that simulator fidelity is maintained.
o Controller in the simulator should communicate with the EP facility controllers, using thecontroller phones, to verify the sequence of events are occurring as planned andadequate time is given for objective demonstration and evaluation.
o The OSC controller will keep the simulator controller informed of the dispatch and returnof teams.o Ensure the use of "This is a drill" in communications to outside of the facility bycontrollers, evaluators, and participants and coach on-the-spot, if necessary, for plantannouncements or communication offsite.0 Maintain a chronological log and ensure key events and times are captured.
o Log any scenario discrepancies.
ATTACHMENT 5PAGE 3 OF 5 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 43 OF 73ATTACHMENT 5CONTROLLER/EVALUATOR ORGANIZATION 6.0 (continued)
- After the drill/exercise o Ensure the facility is restored to a readiness condition.
o Attend meeting held by the Facility Lead Controller to identify control issues that mayhave affected the performance of participants.
o Distribute and collect copies of participant feedback forms (coordinate with the leadcontroller in the facility).
o Collect the completed logs and procedure checklists at the end of the drill/exercise.
o If asked for impressions of how things went before the participant self-critique, specificissues or problems should not be discussed.
o Attend the facility critique and provide feedback at the end of the participant self-critique on issues not identified and critiqued by the participants.
Evaluate the effectiveness ofthe participant self-critique o Summarize notes and prepare for the controller and evaluator debrief.o Summarize all participantlevaluator/controller comments and evaluations on facilityperformance for the report.o Evaluators are responsible for:* Determining gaps or weaknesses in response capability.
One or more evaluators will beassigned to each facility.
- Evaluating the performance of the entire organization and plan as opposed to that ofindividuals and focus on results not processes.
- Evaluating Individual performance of key decision-makers or of critical tasks (e.g.,notification, dose assessment) may be evaluated to assess training or remedial trainingneeds.* Objectively observinge response actions and make detailed notes on the sequence ofevents that can later be analyzed to identify response problems and their cause.o Evaluator Instructions Before the drill/exercise o Be familiar with the overall exercise scenario and the performance objectives for theassigned area.o Review the appropriate procedures and protocols.
o Attend the required controller and evaluator briefing.
o Maintain scenario confidentially.
o Report to the assigned location approximately 30 minutes before start time.o Establish controller communications (bridge line and/or radio approximately 15 minutesbefore start time.o Clearly identify yourself as a controller or evaluator at the beginning of the drill/exercise and/or wear controller identification.
" Remind participants to use identification tools (e.g., badges, vests, arm bands).ATTACHMENT 5PAGE 4 OF 5 NUCLEAR ORGANIZATION EPIP SO123-VI 11-0.200UNITS 1, 2 AND 3 REVISION 17 PAGE 44 OF 73ATTACHMENT 5CONTROLLER/EVALUATOR ORGANIZATION 8.0 (continued)
During the drill/exercise o Avoid personal conversations with any participant.
o Do not provide information unless it is requested or earned by the participants and then,only within the limits of the scenario.
o Do not give information to the participants regarding event progress or resolution ofproblems encountered by others. Participants are expected to obtain information throughtheir own resources.
o Controllers shall distribute messages and cues as scheduled in the scenario withconcurrence of the Facility Lead Controller or the Drill Coordinator.
o All controllers will inform the Facility Lead Controller of problems encountered thatimpact the timeline and completion of major events.o Do not accelerate the drill/exercise by providing information ahead of schedule.
o Suspend local play for safety reasons and, if necessary, recommend to the DrillCoordinator the suspension of the whole drill.o Inform the simulator controller of events in the field before the participants inform theoperating crew so that simulator fidelity is maintained.
o Controller in the simulator should communicate with the EP facility controllers, using thecontroller phones, to verify the sequence of events are occurring as planned andadequate time is given for objective demonstration and evaluation.
o The OSC controller will keep the simulator controller informed of the dispatch and returnof teams.o Ensure the use of "This is a drill" in communications to outside of the facility bycontrollers, evaluators, and participants and coach on-the-spot, if necessary, for plantannouncements or communication offsite.o Maintain a chronological log and ensure key events and times are captured.
o Log any scenario discrepancies.
- After the drill/exercise o Ensure the facility is restored to a readiness condition.
o Attend meeting held by the Facility Lead Controller to identify control issues that mayhave affected the performance of participants.
o Distribute and collect copies of participant feedback forms (coordinate with the leadcontroller in the facility).
o Collect the completed logs and procedure checklists at the end of the drill/exercise.
o If asked for impressions of how things went before the participant self-critique, specificissues or problems should not be discussed.
o Attend the facility critique and provide feedback at the end of the participant self-critique on issues not identified and critiqued by the participants.
Evaluate the effectiveness ofthe participant self-critique o Summarize notes and prepare for the controller and evaluator debrief.o Summarize all participant/evaluator/controller comments and evaluations on facilityperformance for the report.ATTACHMENT 5PAGE 5 OF 5 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 6SO123-VIII-0.200 PAGE 45 OF 73Drill Preparation Flowchart Coordinate
/ VerifyDrill/Exercise DateDetermine objectives andextent of play by offsiteagencies.
4,AssembleScenarioDevelopment Team4,PrepareScenarioSelect andNotify DrillParticipants Participant Brief /TabletopISelect andNotifyControllers
& Evaluators Controller
/Evaluator Training (ifneeded)IIf desired,Arrange forOffsite PeerEvaluators Submitscenario toNRC ResidentInspector whenrequested 4Drill/Exercise Readiness Checklist Attachment 9.84__ _ SITE DRILLDrill Report and Facility Leads Lead FacilityCorrective Critique of Controller CritiqueActions CritiqueATTACHMENT 6PAGE 1 OF 1 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 7SO123-VIII-0.200 PAGE 46 OF 73Exercise Preparation Flowchart Coordinate
/ Verify Determine objectives Submit objectives andExercise Date offsite agencies.
extent of play toT-360 days T-10 Dag es. FEMA T-90 daysT-2 DyLAssembleScenarioDevelopment TeamPrepareScenarioSelect and Select and Solicit /Notify Notify Arrange forExercise Controllers
& Offsite PeerParticipants Evaluators Evaluators Participant Brief /TabletopF otoleControllerI Evaluator Training (ifneeded)4Submit Scenario Miscellaneous to FEMA at ExerciseT-60 days prior to Assignments
&exercise Arrangements Submit scenarioto NRC T-60 daysprior to exerciseController
/ Evaluator ScenarioBriefingDrill/Exercise Readiness Checklist Attachment 9.8FEMA & NRCscenario briefingExercise Reportand Corrective ActionsUtility NRC Debrief FEMA debriefCritiques Exit ExitATTACHMENT 7PAGE 1 OF 1 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 8S0123-VIII-0.200 PAGE 47 OF 73CONTROLLER AND EVALUATOR BRIEFINGAn essential component of a successful drill and exercise program is the selection and briefing of acontroller/evaluator organization.
Personnel to serve in this organization shall be chosen based on theirknowledge in specific areas. It is desirable to use ERO personnel as controllers and evaluators whenever possible.
Quality Assurance personnel observing the drill are not required to complete the controller/evaluator
- briefing, but should receive the observer guidelines.
Controller Briefing Checklist/Walk-Through Ensure all controllers have signed the current year's Confidentiality Agreement and that the current year's Confidentiality Agreement list isupdated.1 Drill/exercise scenario packageEach controller/evaluator receives the scenario material (1)Briefed on scenario security and signs security agreement forpackage2 Review purpose and objectives of the drill/exercise.
Include whethercoaching from controllers will be allowed and if so when it is appropriate.
Evaluators do not coach." Activities for which PI credit will be taken CANNOT be guided orcoached." Coaching is not allowed during a Graded EXERCISE3 Review scenario timeline
-review expected conditions for EAL,classifications and time frame for facility activation, accountability, protective 0action recommendations, etc.4 Bases for scenario events -explain the rationale for each event with respectto industry and previous site experience.
5 Review each player message and controller information sheet contained inthe scenario package.(2) 6 Review any past ERO team strengths and weaknesses that should receivespecial controller/evaluator scrutiny.
Discuss any risk significant standards othat were not met during the last drill/exercise.
7 Drill/exercise ground rules -emphasize the need to not interfere withparticipant decisions and actions.
Ensure each controller/evaluator has oreviewed Controller Organization and/or Evaluator Organization.
8 Facility and/or participant evaluation checklist from EN-EP-308
-ensureeach controller/evaluator understands the objectives for their facility and the 0proper method for completing the checklists.
9 Review schedule and responsibilities for post-drill/exercise critiques.
E010Review any past controller or participant strengths and weaknesses thatshould receive special awareness from the controllers.
0ATTACHMENT 8PAGE 1 OF 1 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1,2 AND 3 REVISION 17 PAGE 48 OF 73ATTACHMENT 9CONTROLLER TRAINING1.0 Controller Training
-Training shall be conducted annually for all controllers.
The training should include the following subjects:
- Establishing initial conditions and briefing the drill participants
- Specifying extent of play and activities to be simulated
- Intervention by controllers to ensure the actions of drill participants do not cause the drill todeviate from the scenario.
- Use of cue cards* Use of props and staging of simulated plant conditions and events* Distribution of data* Coaching in order to provide training* Prompting of actions to maintain the scenario time line* Documentation requirements including all interactions with drill participants.
- Adherence to all HP, Safety, and Security rules* Evaluation Criteria* Evaluation Techniques
- Critique Processo Conduct of player debriefings o Review of identified deficiencies o Eliciting player comments in the course of a comparison and analysis of anticipated versus actual responses 2.0 Controllers Materials and Meetings
-Initial controller packages should be distributed approximately two weeks prior to the drill/exercise.
The initial controller package should contain:* Confidentiality Form* Sequence of Events* Summary* Instructions to Controllers
- Controller Walkthrough Meeting Schedule3.0 Upon receipt of the initial controller
- package, controllers should identify their drill responsibilities in accordance with the summary and sequence of events.4.0 Controllers should attend the meetings identified on the controller schedule.
5.0 Instructions to controllers should include the following:
- Steps for drill or exercise preparation
- Steps for drill conduct* Steps for drill evaluation and record keeping* Instructions for correcting and demonstrating proper emergency response* Modification of PA announcements and other notifications for appropriate drill responseATTACHMENT 9PAGE 1 OF 2 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 49 OF 73ATTACHMENT 9CONTROLLER TRAINING6.0 Each controller package should contain the following:
- Objectives
- Sequence of events* Drill summary* List of Controllers and communications information (PAX phone numbers, etc.)* Instructions to Controllers
- Guidelines for Drill Conduct* Response record sheets for note-taking
- Participant comment sheets* Evaluation form* Individual cue cards which the controller will distribute
- Survey data for field team controllers 7.0 Each Facility Lead Controller should be provided a data book from which data shall be used ordistributed and should contain the following:
- Plant Data* Health Physics Data* Complete set of cue cards8.0 The walkthrough should:* Provide detailed orientation of controllers on the particular scenario* Highlight critical scenario sequences and review anticipated responses
- Resolve scenario conflicts or inconsistencies
- Review the manner of presentation of information or data to players* Identify necessary props* Identify procedures for review* Identify controllers responsibility for evaluating players' performance against specificobjectives 9.0 A final pre-drill or exercise meeting should be conducted just prior to the drill or exercise tofinalize the preparations, pre-stage controllers and to synchronize controller watches as directedby the Drill Coordinator.
10.0 Late changes to the controller packages should be identified.
ATTACHMENT 9PAGE 2 OF 2 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 50 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES The following information, as augmented, should be used to instruct controller/evaluators on functions and responsibilities for conduct during drills or exercises.
Personnel assigned as controller/evaluators should be proficient in the area they are evaluating and briefed on these guidelines prior to anyscheduled drill or exercise.
1 .The controller/evaluator organization is coordinated through a chain of command.
Controllers report to their Facility Lead Controller who reports to the Drill Coordinator.
This chain ofcommand is vital for accurate and timely information flow and message issue through thecontroller organization; and allows for rapid dissemination of changes, if required.
- 2. Evaluators are individuals assigned to key functional areas to document and evaluateemergency response actions.
Evaluators have no responsibility or authority for controlling orimpacting scenario simulation.
- 3. Written messages are used to initiate, modify, and/or complete events posed by the scenario.
Controllers issue messages to pre-designated individuals, or distribute information sheets atpre-designated locations after demonstration of ability to obtain the information, as stipulated bythe scenario timeline.
Message/information delivery is assigned to specific controllers responsible for issuing the message.
Controllers may ensure that ERO participants understand the content of all messages.
There are two types of messages:
" Controlling messages are messages that pose hypothetical events or communicate datanecessary to promote a response.
Controlling messages are the primary means ofimplementing scenario events if any automated data source is not available.
" Contingency messages are messages that prevent,
- correct, or direct certain responses.
Contingency messages should be clearly marked and are to be used by controllers tomaintain the scenario continuity or correct the timeliness of scenario activities.
Controllers should always obtain approval from the Drill Coordinator prior to issuing acontingency message and must record times such messages are issued. Contingency messages may be printed on colored paper.4. Scenario messages generally include the following, as appropriate:
- Sequential number and type of message, either controlling or contingency.
- Message Delivery Time -Approximate time the message is delivered.
- From -Message origination and controller responsible for delivery.
- To -ERO participant or facility to receive the message.* TEXT -Clear, concise verbal or written picture that should prompt a response.
- Controller note -Notes including precautions; actions required to be completed by EROparticipants before receiving message; subsequent controller
- actions, and additional information, etc.* Expected response
-Generic narrative of expected minimum actions (i.e. informmanagement of the situation presented, mitigating actions the responder could take, etc.).ATTACHMENT 10PAGE 1 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 51 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES
- 5. Controllers must not provide scenario information to the ERO participants or resolve problemsencountered, unless ERO participants take actions necessary to obtain information.
In the eventof incorrect or incomplete responses; or if an ERO participant indicates lack of knowledge ofhow to proceed, controllers may find it necessary to coach the ERO participant with necessary instructions to maintain the scenario schedule.
Prompting or coaching must be noted. When thislack of knowledge on how to proceed occurs in an exercise the participant is expected to bereliant upon his/her resources; however if it is necessary controllers may intercede only after is itdetermined actions cannot be completed and the action is necessary to advance the scenarioas intended.
Controllers shall take note and discuss actions during the post drill critique toresolve any confusion after the drill/exercise is terminated.
- 6. The controller should confer with their lead to determine whether a prompt should be made. Acontingency message indicates the anticipation by the SDT that an inject message in thescenario may be necessary.
All prompting must be approved by the Drill Coordinator and mustbe included in the critique.
- 7. Controllers may have responsibilities for issuing time -related process or radiological parameters.
This information should only be issued if ERO participants' actions would allowthem access to the information if it were an actual event.8. Scenario data must not be issued prior to ERO participants performing the necessary actionsrequired to obtain the data.9. Scenario material is to be treated as confidential and must not be provided to ERO participants prematurely; i.e., scenario books and messages must not be left unattended.
- 10. Scenario events are hypothetical.
NO actions or reactions involving operation of plant systemsor affecting operability or emergency preparedness should be initiated.
- 11. Some ERO participants may insist that events or times are unrealistic.
The scenario should bebased on real world failures when possible.
Controllers have the authority to clarify questions critical to the continuity of the simulation or demonstration of objectives.
It may be necessary tostate, "This is due to requirements of the scenario for the ERO to demonstrate emergency planimplementation
". Ensure that ERO participants are aware they are being given credit for allactions.12. NRC Performance Indicators of classification, notification, and protective actionrecommendations should be discussed with controllers and times documented by each facility.
Controllers shall not intervene, prompt or provide guidance during these opportunities of thescenario timeline.
ATTACHMENT 10PAGE 2 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 52 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES
- 13. Do not coach the following if NRC performance indicators are being evaluated and counted:" Classification of emergencies or indications that lead to classification.
If indications that anEAL initiating condition exists but is not recognized by the ERO, coaching that theindication exists (not EAL) may occur after the time for classification (15 minutes) hasexpired and the classification is required for the progression of the drill. Do not coachmissed classifications, the ERO as a team should recognize this." Timeliness of classification.
" State and local notifications of classification or PARs or timeliness of the notification.
Donot coach on errors on the notification form or call or the missed time limit." Protective Action Recommendations or indications that lead to a PAR or re-evaluation/upgrade of a PAR.14. Drills designated as non-evaluated training drills may have mentor/coaches assigned to specificpositions to ensure positive training occurs. Coaching may be used to:* Ensure the participant adheres to the communications standard.
- Coach or train the participant in the understanding of position responsibility, positionprocedures, interface with other positions or facilities, how to obtain information, orequipment required for the position.
- Identify good performance or areas needing improvement or additional training.
- 15. Controllers are not allowed to arbitrarily inject free play into the scenario.
Any deviation from thescenario must be approved by the Drill Coordinator.
- 16. The controller/evaluator organization must synch clocks to ensure messages are delivered atthe prescribed time.17. Phone and radio communications associated with the drill begin and end with the phrase "Thisis a drill". Controllers are encouraged to interrupt and prompt participants with "This is a drill" ifnot used. Three way communications is the standard during drills.18. Controllers and evaluators must ensure that they are at their assigned positions and are easilyidentifiable to ERO participants.
- 19. Controllers are thoroughly familiar with the ERO participant guidelines which establish the scopeof simulation and emergency response.
When any questions arise during the conduct of a drillor exercise, contact your Facility Lead Controller or the Drill Coordinator for guidance.
- 20. As part of the controller evaluator briefing facility controllers should group together in a tabletopto walk-through and validate events and associated control activities.
ATTACHMENT 10PAGE 3 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 53 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES
- 21. Some reminders:
- Maintain professional conduct during drills/exercises and critiques.
- Become familiar with the controller/evaluator organization.
" Perform a walk-down of the facility and areas you will control/evaluate prior to the drill /exercise.
- Make sure you understand the scenario.
- Know what the ERO participants' required actions are.* Give yourself time to set up at your location* Controllers shall locate the communications equipment to be used for drill/exercise control.* Position yourself to maximize your effectiveness in issuing messages, observing the EROparticipants, or conducting your evaluation without interfering.
- Identify yourself to the ERO participants.
Wear the identification provided.
- Issue messages on time. Make sure that ERO participants understand the content." Verify that the scenario is running on schedule.
" Document demonstration of objectives.
" Allow ERO participants reasonable flexibility to perform their functions and demonstrate theirability, knowledge and initiative.
- Take accurate, detailed notes on strengths, deficiencies, weaknesses, and improvement items. State facts, not opinions.
- Complete any evaluation forms provided.
Resist the tendency to draw conclusions.
- Attend all scheduled critique functions and be ready to contribute.
- Do not leave your scenario package unattended.
- Do not leave your post at key times.* Do not criticize ERO participants' actions during the simulation.
- Do not allow external influences to distract ERO participants' emergency response.
- Do not allow simulation of equipment or supplies if they are actually available, withoutauthorization from the Drill Coordinator.
- Do not carry on conversations in the facility that may distract ERO participants.
ATTACHMENT 10PAGE 4 OF 9 NUCLEAR ORGANIZATION EPIP S0123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 54 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES BEFORE THE EXERCISE1. Read the Exercise Summary and Sequence of Events to understand Cue Card distribution andthe anticipated responses.
- 2. Read the Guidelines for Exercise Conduct and Exercise Extent of Play to understand whatresponses are to be simulated, and how far actual responses are to be carried out.3. Review procedures to be implemented by participants you will be observing to identify criticalsteps and error-likely situations.
- 4. Note any additional information you think you will need to give the participants, including propsand other staging materials.
Identify this information to the Exercise Coordinator as early aspossible.
- 5. Review the Exercise Objectives and Evaluation Form. These are the performance areas youmust pay particular attention to during the Exercise.
- 6. Ensure that your Radiological and Security access levels are current and adequate for the areasyou must enter during the Exercise.
- 7. Prior to the day of the Exercise, contact any participants you expect to interact with tocoordinate times and locations for briefings, etc.8. On the day of the Exercise, assemble and brief any participants who require staging.
Reviewthe Guidelines for Exercise Conduct and simulated plant conditions with them.9. Direct any participants who are pre-staged without authorization to leave the area.10. Inform participants assigned to OSC field teams that they MUST check with a Controller toobtain simulated Exercise conditions.
If they are assigned to a team without a Controller, participants must check with a Controller in the OSC for simulated conditions prior to reporting status to other Exercise participants.
ATTACHMENT 10PAGE 5 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 55 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES DURING THE EXERCISE1. Identify the Exercise participants in your area. Ensure they understand the Guidelines forExercise Conduct.
Participants need to sign attendance sheets to document their participation.
- 2. CONFIDENTIALITY is crucial.
Ensure that Controller Notebooks and other Exercise data arenever left unattended or uncontrolled.
Ensure your conversations with other Controllers orObservers regarding the scenario elements and timing cannot be overheard by participants.
Give participants Exercise conditions and plant and equipment status only when they takeappropriate steps to EARN the information.
- 3. Instruct participants that they are to carry out assignments as follows:* Walk through the assignment, performing such steps as retrieving tools, equipment andprocedures, reporting to supervision and the Control Room Simulator (via radio or phone),and wearing protective gear, WITHOUT manipulating plant equipment or controls, unlessdirected by a Controller.
- Observe all Security, RP, Safety and Administrative controls.
- Assume equipment works normally, unless told otherwise by a Controller or indicated byExercise guidelines, props or signs.* Describe all actions and communications to the Controller or Evaluator observing theirresponse.
- 4. Record the actions of Exercise participants on the Exercise Response Record. Try to record aBRIEF OBSERVATION every 2 -3 minutes.
Document thoroughly but do not attempt toformally evaluate participant performance at this time. Note the following:
- Time at which information associated with classification or PAR determination is available to Exercise participants.
- Time of event classification or PAR determination.
- Time of notification, and verbiage used.* Time at which recalled personnel arrive.* Information flow between Exercise participants.
- Procedure implementation.
- Actions taken in response to Exercise scenario.
- Use of "THIS IS A DRILL" with all electronic communications.
- Audibility and accuracy of PA announcements.
- Location of any defective or muted PA speakers.
- 5. Contact the Drill Coordinator or Facility Lead Controller if problems arise, especially if:* Timing of Cue Cards or responses is in question.
- Response to Exercise conditions is different from expected* Questions arise about how far to carry Exercise responses.
ATTACHMENT 10PAGE 6 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 56 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES DURING THE EXERCISE (continued)
- 6. Direct RP Technicians to use normal instruments for response inside the Radiological Controlled Area (RCA), and to use Emergency Kit instruments for response outside the RCA.7. If required, direct participants to use GMRI canisters marked "Drill Use Only."8. OSC Controllers:
" Ensure Controllers accompany dispatched teams. Track assignments of teams already inthe field, in case they are redirected to locations requiring specific Controllers.
- If any additional teams must be dispatched without Controllers, then give them theinstructions for participant response listed in item 3, above. Instruct them to contact youfrom the field if they have any questions, and to report their actions to you before reporting in to the OSC for debriefing.
" If there are no radiological survey maps prepared for an area, then indicate that thereadings are "as read." If uncertain, contact the OSC HP Controller.
" While the participant's instrument is moving closer to the source of radiation indicate thereading as rising, while the participant's instrument is moving further from the sourceindicate the reading as lowering, and when the instrument is stationary provide theappropriate value.9. Remind Observers not to interfere with participants.
Their questions should be directed toExercise Controllers or Evaluators only.11. The Exercise will be terminated when all objectives have been tested and play at all locations has reached a logical stopping point. Facility Lead Controllers will be notified about 10 minutesbefore the Exercise is terminated, and should inform other Controllers and Evaluators.
- 12. The Exercise may need to be terminated due to an actual emergency or at the direction ofmanagement.
If the Exercise is terminated due to an actual emergency, the Shift Manager willdeclare the event in the Control Room, and notify the facility leaders over the Ivory Phone. If theExercise is terminated at the direction of management, the Exercise Coordinator will notify thefacility leaders over the Ivory Phone. If the Exercise is terminated for any reason, return thefacilities to their pre-Exercise condition and wait for further instructions.
ATTACHMENT 10PAGE 7 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 57 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES AFTER THE EXERCISE1. Conduct a debriefing of participants in your area immediately after the Exercise.
This may bedone alone or with other Controllers and Evaluators.
The following specific items should bediscussed:
- a. Brief review of the Sequence of Events and the Exercise Summary.b. Statement of any Objectives applicable to your area, and preliminary results.c. Brief description of any response findings.
- d. Request for participant response to the items above.2. Collect Exercise Participant Comments.
- 3. Assist the Facility Lead Controller and Participants in restoring the facility to a ready condition.
- 4. Complete the Exercise Evaluation Form as soon as possible.
- 5. Explain any unsatisfactory areas.6. Note procedures,
- actions, etc., that worked well or were particularly successful.
- 7. Make copies for your own use, then turn in completed original Evaluations, Participant
- Comments, collected Exercise materials, log sheets, etc., to your Facility Lead Controller assoon as possible after the Exercise.
EVALUATION FORMS AND PARTICIPANT COMMENTSHEETS MUST BE TURNED IN AT OR BEFORE CONTROLLER DEBRIEF.8. Designated Controllers attend debriefing.
ATTACHMENT 10PAGE 8 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 58 OF 73ATTACHMENT 10CONTROLLER/EVALUATOR GUIDELINES OPERATING EXPERIENCE RELATED TO CONTROLLER PERFORMANCE
- 1. From NN 201122755:
A Drill Controller intercepted radiological survey information, preventing others in the ERO and the SED from having the opportunity to analyze the information andrespond accordingly to determine whether a General Emergency Classification was warranted.
Per NEI 99-02 Rev. 6 and SO123-VIII-0.401, "if a controller intervenes (e.g., coaching, prompting) with the performance of an individual to make an independent and correctclassification, notification, or PAR, then that DEP PI Opportunity shall be considered a failure."
- 2. Controllers failed to coordinate with Simulator Machine Operator to display changing plantconditions in the Simulator prior to allowing players report their simulated actions.
This resultedin confusion and interrupted the flow of the scenario.
- 3. Controllers were observed eating and drinking when it was prohibited.
Restrictions apply to allpersonnel involved in drills and exercises.
- 4. Use of draft procedure for the Security Leader caused confusion between the OSC and TSC(steps and pages were numbered in a different sequence).
- 5. The Chemistry Controller in the Reactor Lab did not ensure the proper sequence of interaction between the Reactor Lab and the Control Room Simulator.
Conflicting information is adistraction to drill participants.
- 6. Controllers allowed players to simulate an excessive amount of the actions that they described they would do (i.e., obtaining keys and tools; reporting to various plant locations in accordance with EPIPs).7. From NN 200503504:
Controllers assigned to the Control Room Simulator and JIC need to lookmore aggressively for OE opportunities and document these findings to aid in improving performance in the CR and ENC.8. From NN 200937487:
Drill/Exercise Performance opportunities were not included, as theconfidentiality of the drill data may have been compromised when drill materials were leftunattended prior to the drill by an observer.
- 9. From NN 200931482:
Controller and Evaluator drill evaluation forms are not completely filledout. It is just as importance to have a complete evaluation record as it is to have completeparticipant records.10. From NN 201023756:
Drill controllers aren't always familiar with the subject matter enough tospeak to participant's questions objectively.
Controllers need to ensure they obtain information specific to the area they are going to cover.11. From NN 202405588:
During the INPO observed drill it was noted that the Lead Drill Controller could be overheard by the drill participants resulting in unplanned cueing of impending events.ATTACHMENT 10PAGE 9 OF 9 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 59 OF 73ATTACHMENT 11OBSERVER GUIDELINES Observers must have the permission of the Manager, Emergency Planning or the Facility LeadController to observe in the specific facility.
The following is a topical guideline from which pertinent topics may be drawn. The chosen content may be provided to observers by email or presentation.
- 1. An observer is just that, he/she is to observe.
Professional conduct should be maintained duringdrills and critiques.
- 2. Always wear your OBSERVER identification in plain view.3. NO interaction with ERO participants is allowed.
If you are asked anything by an EROparticipant, simply state that you are an observer only. No other statement should be needed asERO participants have been advised of the role of observers.
Only time this will not apply will befor safety issues and concerns.
Please notify Facility Lead Controller immediately if a safetyissue arises.4. Minimal interaction with controllers is allowed.
Any questions you may have may be directed toa controller, but controller duties will take precedence over answering your questions, especially during a drill. It is preferred that you simply record your questions and ask them after the drill.5. Observers may observe the critique and may participate (i.e., comment or ask questions) afterthe participants have completed their self-critique.
The critique process is a vital part of the drillor exercise to be conducted by the ERO and controller organization.
Comments about thecritique must be left for the end or may be given to the Manager, Emergency Planning.
- 6. Information concerning the level of simulation, interaction between ERO participants andcontrollers and scenario information needed may be obtained form the Drill and ExerciseCoordinator.
- 7. Do not carry on lengthy discussions with other observers during the drill in the emergency response facilities.
Such discussions should be moved out of the facilities.
- 8. Do not interfere with any drill activity.
For example, use of the phones, stand in front of a statusboard, use procedures provided for the ERO participants, etc.9. You are eyes and ears only. If your needs exceed that, communicate your needs to the FacilityLead Controller.
- 10. If you are an assigned
- observer, any food or drink provided to the ERO participants will also beprovided to you.11. If you are being escorted, follow all security requirements (i.e., stay with your escort, etc).12. All observers shall comply with site procedures and practices for entry into actual security andradiological controlled areas.ATTACHMENT 11PAGE 1 OF 1 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 12S0123-VIII-0.200 PAGE 60 OF 73SECURITY/CONFIDENTIALITY AGREEMENT CONFIDENTIALITY is crucial.
Ensure that Controller Notebooks, Drill data, and Scenario Details arenever left unattended or uncontrolled or discussed with persons not on the active Security Agreement.
[NN 201619612-CA0003]
Personnel listed below acknowledge that they are aware of confidential details of, or possessconfidential materials for Emergency Plan Mini-Drills, Drills or Exercises, of which portions may beincluded in the Emergency Preparedness Cornerstone NRC Performance Indicators.
They understand that any information regarding scenario content may not be disclosed to personnel notyet evaluated until completion of the final use of the scenario in a single evaluation or series ofevaluations, as indicated by the End Date.They understand that report to the NRC of performance based upon compromised scenario information constitutes providing inaccurate information to the NRC and violation of 10CFR50.9.
Scenario:
Start Date: End Date:Printed Name Signature iiATTACHMENT 12PAGE 1 OF 1 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 61 OF 73ATTACHMENT 13PARTICIPANT BRIEFINGThis section provides information to be provided to drill/exercise participants prior to the drill/exercise.
The information is intended to assist participants in understanding proper drill/exercise conduct protocolas well as the initial plant conditions and equipment status at the start of the drill/exercise.
Information will not be provided which discloses any specifics of the subsequent scenario events.Participants should be encouraged to ask questions about the drill control process, level of simulation, etc. This attachment should be utilized for participant briefings.
Recent changes to the Emergency Plan or Implementing Procedures, and close-of-business or initialconditions should be added to this list prior to presentation/distribution.
Discussions of lessons learnedand any Risk significant standards that were not met from previous drill/exercises shall be held duringparticipant Briefings.
Participant Briefing Guidelines
" Training and mentoring/coaching is not permitted during NRC graded biennial exercises.
" Controllers, evaluators and observers will wear an identification aid (e.g., badge, vest,)* The success of the drill/exercise is largely dependent upon participant responses to the simulated event. Therefore, it is crucial that participants know how they can get and/or request data." Participants may not inject "Free Play" or assume that certain things may be simulated or not tested.If there is any doubt about the level of simulation, ask a controller.
" Do not request information from, or provide information to, someone in an Observer role." Drill participants are expected to earn information.
For example; an RP Technician will not beprovided survey data if he/she doesn't have the meter turned on, and OSC repair teams should havethe right tools /procedures to perform the task.* Information may be obtained by participants in any of several ways:o Operators/other participants:
-Live data off simulator
-Controller issued message-Operators in field will get data from a controller also in the field.o Maintenance
/ Repair Teams in the Field:-All information will be provided by a controller in the field. Each mission shall have adrill/exercise controller with it.-In some cases a mockup may be used. If a mockup is provided, work on the mockupshould actually proceed and the controller will inject information if necessary.
o Radiological Protection/Health Physics:-Chemistry Data will be provided by a controller after the sample(s) has been obtained andanalyzed (simulated).
-Radiological data not driven off the simulator or indications are not available outside thesimulator will be provided by a controller.
In-plant radiological conditions for repair teamswill also be provided by a controller.
-Environmental team data will be provided by a controller.
ATTACHMENT 13PAGE 1 OF 4 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 62 OF 73ATTACHMENT 13PARTICIPANT BRIEFINGo TSC, OSC, and EOF:-Data will be transmitted through normal communication paths-Live data off the simulator
-Messageso Fire, Medical, Hazmat, etc.-Data provided by a controller o Joint Information
/News Center:-Mock media may be used-Inject messages may be provided for media monitoring and public inquiry." Personnel required to maintain safe operation (i.e., on-shift operators) of the plant will be exemptfrom drill activities.
" Participants may ask controllers for clarification of scenario data or information on plant conditions not adequately provided by the simulator.
Examples are:o Initial Conditions of systems including:
-system status and availability
-valve line ups-chemistry and radiological activity-operating history-meteorological data-operational parameters
- All drill/exercise communications should be preceded and ended by "THIS IS A DRILL"" Accept the drill/exercise information as provided.
Questions may be asked to clarify the information, but recognize that some events in emergency drills/exercises can seem unrealistic.
Remember weare testing how well ERO personnel can implement the Emergency Plan, not the realism thescenario.
" Participants in an evaluated exercise may not ask for the following:
o Information contained in procedures,
- drawings, etc.o Determinations of which procedures to use.o Data not normally available o Assistance in activating the facilities o Assistance in performing emergency responseo Assistance in repairing, replacing, or substituting emergency response equipment, i.e.,telephones, fax machineso Explanation of scenario eventsGet the attention of a controller when making key decisions.
Make sure the controller understands the basis for your decisions.
Keep good, detailed logs.Maintain a professional attitude.
Play the drill/exercise as if it were an actual event.ATTACHMENT 13PAGE 2 OF 4 NUCLEAR ORGANIZATION EPIP S0123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 63 OF 73ATTACHMENT 13PARTICIPANT BRIEFING" NEVER violate any safety, radiation protection, operation, or security practices during adrill/exercise.
" A controller will inject information at times when something may be simulated.
Simulation will be keptto a minimum, but when in doubt -ask." NEVER operate any plant equipment as part of drill/exercise activities.
" DO NOT enter high radiation areas. Practice ALARA.* Practice proper communication protocols, (three-part, phonetic
- alphabet, etc.). Think pro-actively.
" Note items for the critique.
Both positive and negative items may be presented.
Use of a participant observation form is encouraged, although written comments will be received in any format." Participants will be informed of a scheduled
- exercise, but may not be informed of the start time andwill not be informed of scenario, expected
- actions, or any other information that may compromise theexercise.
Participants and equipment shall not be pre-staged for the exercise.
" If you disagree with a controller, you may request reconsideration from the Facility Lead Controller.
Under NO circumstances are you to argue or indulge in theoretical discussions with the controller.
" Do not accept any data/instruction from an observer including the NRC observers.
All information must be obtained from normal sources or from the controller organization
" Participants must respond to simulated events as if they are real. This includes but is not limited tothe following:
[As amended by extent of play or controllers]
o Wearing of dosimetry and anti-C's.
o Observing good radiation protection practices o Minimizing exposures o Responding to failed instruments in the fieldo Reporting hazards to the correct personnel o Proper contamination control* Controllers and observers are exempt from responding to simulated radiological hazards during thedrill/exercise.
" All normal site procedures and rules are to be followed when entering the protected area and actualradiological controlled or radiation areas. NO ONE, including controllers, and observers, are exemptfrom normal station radiological or safety practices.
" Following termination, collect all logs, work sheets, etc." Always leave your work area as you found it. The Emergency Response Facilities should be left inan operational status following the drill/exercise.
" A Participant critique will be held following every drill/exercise.
This is an important part of thedrill/exercise.
Identify strengths as well as areas for improvement, however it is important to be"self-critical" to ensure the critique will lead to an improved Emergency Response.
ATTACHMENT 13PAGE 3 OF 4 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 64 OF 73ATTACHMENT 13PARTICIPANT BRIEFINGWhen personnel accountability is listed as a drill/exercise objective provide the following information regarding exempted personnel:
o Notify the ERO that there are exemptions for the drillo The exempt personnel list will be provided at the beginning of the drill to the participants needing the information o The initial report concerning the results of personnel accountability will include the number ofexempt personnel.
o The controller may assist in the deletion of exempt personnel from the "missing persons list."o Personnel on the exempt list will not be tracked or contacted during the search and rescue.o Exempt personnel lists should be provided to security.
ATTACHMENT 13PAGE 4 OF 4 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 65 OF 73ATTACHMENT 14DRILL REPORTTypical report -page 1 (optional, use site distribution and records method)Letterhead Date: mm/dd/yyyy To: Distribution (site specific)
From: (EPM name)
Subject:
Team X (drill or exercise type/name and date)File No. (Site specific)
Letter No. (Site specific)
This report advises you of the results of our evaluation of Emergency Response Organization Team Xperformance during the (drill/exercise name and date).The team (general summation of team performance).
Actions have been entered into CAP to improve the areas identified as needing improvement.
Thesewill be followed to completion.
Please contact me or a member of my staff if you have any questions regarding this report.EP ManagerAttachments:
1 Executive Summary2 Objectives and Evaluation Criteria3 Areas For Improvement ATTACHMENT 14PAGE 1 OF 3 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 66 OF 73ATTACHMENT 14DRILL REPORTTypical report -page 2PERFORMANCE INDICATORS (include all that were determined by scenario)
PI Indications PI PI PI PI ENS PIOpportunity available Declaration Met Notification Met Notification MetNOUE/UE (time) (time) (time) (time)Alert (time) (time) (time) (time)SAE (time) (time) (time) (time)GE (time) (time) (time) (time)PAR (time) (time) (time) (time)CLASSIFICATION:
- Number of opportunities
- Number successful (correct
& timely)NOTIFICATIONS:
(Short form submissions)
- Number of opportunities
- Number successful (correct
& timely)PROTECTIVE ACTION RECOMMENDATIONS:
- Number of opportunities
- Number successful (correct
& timely)Total Opportunities:
Total Successful:
OBJECTIVES Objectives Met Not Met Met with CommentsOverall Objectives Evaluation CriteriaEMERGENCY CLASSIFICATIONS AND PARS(EXAMPLES)
NOUE/UE N/AAlert FA1-1 (FC1 300pCi/g)
SAE FS1-1 (RC1 DW 1.68 psid & FC1)GE FG1-1 (PC 2 SAPs, RC1 & FC1)PAR PAR -evacuate 2 mile and 5 mile downwind, shelter 10 mile based on windfrom 3580ATTACHMENT 14PAGE 2 OF 3 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 67 OF 73ATTACHMENT 14DRILL REPORTWhen a Health Physics, radiological monitoring, medical emergency or communication drill is beingcredited within the scope of a larger drill / exercise, the drill may be documented in this report or in aseparate report. The communication drill requirement is normally satisfied by scheduled communication tests and is documented per the governing procedure.
The following should beincluded in the report:* The drill being credited* An evaluation of objective(s) and evaluation criteria* Ensure the following findings are documented in the critique report:* Deficiencies
- Weaknesses, and* Other Issues (betterment)
- A summary of actions taken by the ERO, documentation and critique" Evaluator/Controller credentials (RP Supervisor, Chemistry management, etc.)* Summary of CAP actions" Summary of other significant items* Completed critique/evaluation sheets (SO123-VIII-0.220)
- Overall score for the drill or actual emergency and a score for each facility.
ATTACHMENT 14PAGE 3 OF 3 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 68 OF 73ATTACHMENT 15DEFINITIONS Annual -For the purpose of this procedure, annual is once per calendar year.Biennial
-For the purpose of this procedure, biennial is once every two calendar years.Controller
-An individual familiar with the drill/exercise scenario who directs the conduct of the drillby interacting with participants, giving appropriate data when requested, monitoring the progress ofthe participants with respect to the scenario, and directing the participants if necessary to ensurethe scenario follows the intended event sequence.
Critical Task -Tasks that must be performed during a major event to prevent (re)occurrence, reduce loss of life or serious injuries, or mitigate significant property damage, or are essential tothe success of the emergency planning mission to protect the health and safety of the generalpublic, licensee staff, plant equipment and the environment.
Drill -A controlled scenario event that is conducted to provide training and practice for theparticipants.
Drills may also include evaluated objectives and demonstration criteria as part of drilland exercise performance (DEP) or to meet periodic performance objective requirements as pre-designated by the scenario.
Drills may include one or more emergency response facility and/ormay be focused on one or more functional area (i.e., classification, dose assessment, PAR). SeeHSEEP definitions when communicating with offsite agencies.
Most drills conducted with offsiteagencies are an exercise per HSEEP guidance.
Evaluators
-Personnel, knowledgeable in the duties and action requirements of the personnel they are monitoring, responsible for assessing the conduct of drills or exercises, including theadequacy of participant response to scenario events, the implementation of emergency plans andprocedures, and the use of emergency response facilities and equipment.
Exercise
-An event that evaluates the integrated capability and a major portion of the basicelements against designated objectives and demonstration criteria.
An exercise may involveparticipation of personnel from State, Local and Federal governments.
See HSEEP definitions when communicating with offsite agencies.
HSEEP does not use the terms graded or evaluated exercise.
Homeland Security Exercise and Evaluation Program (HSEEP) selected definitions:
(a) Drill -A drill, a type of operations-based
- exercise, is a coordinated, supervised activity usually used to test a single specific operation or functionin a single agency. Drills are commonly used to provide training on newequipment, develop or test new policies or procedures, or practice andmaintain current skills. [A drill will normally test a single function, primarily field activities.]
(b) Exercise
-An exercise is an instrument to train for, assess, practice, andimprove performance in prevention, protection,
- response, and recoverycapabilities in a risk-free environment.
Exercises can be used for testing andvalidating
- policies, plans, procedures,
- training, equipment, and interagency agreements; clarifying and training personnel in roles and responsibilities; improving interagency coordination and communications; identifying gaps inresources; improving individual performance; and identifying opportunities for improvement.
ATTACHMENT 15PAGE 1 OF 2 NUCLEAR ORGANIZATION EPIP SO123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 69 OF 73ATTACHMENT 15DEFINITIONS (c) Full-Scale Exercise (FSE) -An FSE is a multiagency, multijurisdictional activity involving actual deployment of resources in a coordinated responseas if a real incident had occurred.
An FSE tests many components of one ormore capabilities within emergency response and recovery and is typically used to assess plans and procedures and a coordinated response undercrisis conditions.
Characteristics of an FSE include mobilized units,personnel, and equipment; a realistic, stressful environment; and scriptedexercise scenarios.
[A FSE will normally include command activities, EOCsand field activities.]
(d) Functional Exercise (FE) -An FE is a single or multiagency activity designedto evaluate capabilities and multiple functions using a simulated response.
An FE is typically used to evaluate the management of Emergency Operations Centers (EOCs), command posts, and headquarters and toassess the adequacy of response plans and resources.
Characteristics of anFE include simulated deployment of resources and personnel, rapid problemsolving, and a highly stressful environment.
[A FE will normally includecommand activities and one or more EOCs without field activities.]
(e)Mentor -A mentor (coach) is an ERO member possessing no knowledge of the scenario that trainsor coaches a trainee or less experienced ERO member in a position the mentor is qualified.
Observer
-An individual that has been identified to monitor the drill and may report observations to controllers or evaluators.
Obiective
-A major element of the emergency preparedness program that is selected forperformance in a scenario.
The objective describes the task, behavior or activity to bedemonstrated and provides criteria to measure satisfactory demonstration.
Participant
-An individ~ual, trained or being trained in an ERO position, that performs emergency response functions in a drill or exercise in accordance with the Emergency Plan and Implementing Procedures.
Planning Standard
-NUREG 0654 categories outline the evaluation criteria used to measure theadequacy of evaluation criteria against the requirements of Title 10 Part 50.47(b) to the Code ofFederal Regulations (CFR). Certain planning standards are designated as Risk Significant.
RiskSignificant Planning Standards are concerned with assessment, classification, notification, andprotective actions.Scenario
-The controlling document for an emergency drill, exercise, or simulator PI evaluation drill designed to test the capabilities of the ERO.Tabletop Drill -A structured discussion that is based on a scenario set of conditions and/orobjectives for potential emergency response situations among decision makers or responders.
They are a teaching/training aid as well as an opportunity to talk through plans and procedures ordiscuss new systems.
DEP credit may be given in tabletop drills.Trainee -An individual being trained in the duties and responsibilities of an ERO position.
ATTACHMENT 15PAGE 2 OF 2 NUCLEAR ORGANIZATION EPIP S0123-VIII-0.200 UNITS 1, 2 AND 3 REVISION 17 PAGE 70 OF 73ATTACHMENT 16DEVELOPMENTAL RESOURCES EP ACE 040600717 AR 060200801-01 (for SAMG periodic objective)
AR 060901233-01 (for PASS removal)AR 051100440-01 (for documenting offsites' back-shift drill participation)
AR 040801204-02 (for Drill Records and Critique Report distribution)
AR 050101029-03 (for use of Form EP[123] 20)AR 070300353-03 (for limits on ERO participation for security drills)NN 200105582-19 (for Extensive Damage periodic objective)
NN 201421756 (Added note clarifying that "players" included CAS, SAS, Craft, Firefighters, etc.)NN 201489165 (Corrected typo -Step 6.1.2.1 -'on' should be 'one')ATTACHMENT 16PAGE 1 OF 1 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 17SO123-VIII-0.200 PAGE 71 OF 73SUMMARY OF CHANGESSO123-VIII-0.200 Rev 17Author: RLMcCannPAX:89281 Location:
D1NNN, Order, or Step, Section,Other Description of Change 50.59 Attachment orAction Page" Deleted reference to SO123-VIll-0.401, Emergency Preparedness Performance Indicators
" Added reference to S0123-VIII-0.210, Emergency Planning Drill Objectives and Demonstration Criteria" Updated revision date for FEMA REP Manual00Renamed section from Checklists to Responsibilities Added responsibilities for:o Manager, Emergency Preparedness Planning(EPM):o Manager, Safety, Human Performance andPerformance Improvement o Site Management teamo Drill/Exercise Coordinator o Scenario Development Teamo Emergency Planning Department staffSection 1Section 2Section 5202405588
- Combined the following Steps into new Section 6.1 EPDrill/Exercise Scheduleo 6.1.1 Exercise Scheduling o 6.1.2 Drill Scheduling o 6.1.3 Simulator Activity Scheduling o 6.1.4* Moved Step 6.2.1 Objectives into new Section 6.2SELECTION OF DRILL/EXERCISE OBJECTIVES
- Combined Steps 6.2.1.1 through 6.2.1.14 for filling outAttachment 2 into one step (6.2.5) to update Attachment 2.* Moved Step 6.2.2 Scenario Development into newSection 6.3 SCENARIO DEVELOPMENT
- Added section to describe acceptable drill/exercise scenarios
" Added requirement to assemble a ScenarioDevelopment TeamDNASection 6.1Section 6.2Step 6.2.5Section 6.3Step 6.3.1Step 6.3.4.1 _______ A. _______________
ATTACHMENT 17PAGE 1 OF 3 NUCLEAR ORGANIZATION UNITS 1,2 AND 3EPIPREVISION 17ATTACHMENT 17SO123-VIII-0.200 PAGE 72 OF 73NN, Order, or Step, Section,Other Descriptionof Change 50.59 Attachment orAction Page* Moved scenario condition and events instructions fromStep 6.2.2.5 to Section 6.4, SCENARIO PACKAGE* Deleted Step 6.2.7 as each controller receives a fullscenario package as described in Section 6.4,SCENARIO PACKAGE" Guidelines for Drill/Exercise Conduct moved from Step6.2.2.5.5 into Step 6.4.1 and Attachments:
o 10 Controller
/ Evaluator Guidelines o 11 Observer Guidelines o 13 Participant Briefing" Moved instructions from Step 6.2.2.5.6 through 6.2.2.5.7 to Step 6.4.1* Moved instructions from Step 6.2.2.5.8 to Step 6.4.1 andAttachment 3Section 6.4Step 6.4.1" Deleted Steps 6.2.11 through 6.2.15 and moved theinstructions to Section 6.6, CONDUCT OF DRILLS ANDEXERCISES
" Deleted Steps 6.2.16 through 6.2.20 and moved theinstructions to Section 6.7, Drill and Exercise Evaluation
- Moved instructions from Section 6.4 Corrective Actions/Event Trending to Section 6.7, Drill and ExerciseEvaluation Section 6.6Section 6.7202405588
- New Attachment describing Scenario Development Team process" Moved instructions from Step 6.2.3.1 through 6.2.3.4into Attachment 3, SCENARIODEVELOPMENT TEAM AND RESPONSIBILITIES DNAAttachment 3* New Attachment providing a Drill Planning Checklist
- Deleted Step 6.2.2.4 as this information is captured inAttachment 4, Drill Planning Checklist
- Step 6.2.9, Notifications and Announcements deleted asthe instructions are provided in Attachment 4, DrillPlanning Checklist
" New Attachment providing aCONTROLLER/EVALUATOR ORGANIZATION instructions
" Moved Steps 6.2.4 Controller Organization and 6.2.5Controller Requirements/Assignments, into Attachment 5, CONTROLLER/EVALUATOR ORGANIZATION Attachment 4Attachment 5Added new attachment providing DRILL PREPARATION FLOWCHART
- Added new attachment providing EXERCISEPREPARATION FLOWCHART Attachment 6Attachment 7Attachment 80Added CONTROLLER AND EVALUATOR BRIEFINGinstructions ATTACHMENT 17PAGE 2 OF 3 NUCLEAR ORGANIZATION UNITS 1, 2 AND 3EPIPREVISION 17ATTACHMENT 17SO123-VIII-0.200 PAGE 73 OF 73NN, Order, or Step, Section,Other Description of Change 50.59 Attachment orAction Page" Added new attachment providing CONTROLLER TRAINING guidelines Attachment 9* Moved Step 6.2.6, Controller training into Attachment 9CONTROLLER TRAINING* Added new attachment providing Attachment 10CONTROLLER/EVALUATOR guidelines
- Added new attachment providing OBSERVER guidelines Attachment 11202405588
- Added new attachment providing an example DNA Attachment 12SECURITY/CONFIDENTIALITY AGREEMENT
- Added PARTICIPANT BRIEFING instructions Attachment 13* Added attachment providing a DRILL REPORT template* Moved instructions from Section 6.5, Written Critique Attachment 14Report to Attachment 14, DRILL REPORT* Added new attachment providing DEFINITIONS Attachment 15* Renumbered old Attachment 3 Attachment 16Document Reviewers:
Name:EP -Cognizant Supervisor McCannEP Cleavenger EP KennelCFDM Final Approval:
LindbeckATTACHMENT 17PAGE 3 OF 3 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SO123-VIII-EOF REV: 1IiPage 1 of 62IProcedure Usage Requirements SectionsInformation Use e The user may complete the task from memory. However, the Attachment 10user is responsible for performing the activity according to theprocedure.
- Information use documents that contain a specific process orderare performed in the given order unless otherwise specified within the document.
Reference Use
- Review and understand the procedure before performing any All exceptsteps, including the prerequisite section.
Attachment 10* Have a copy or applicable pages/sections open at the work site.* Use Placekeeping method according to S0123-XV-HU-3.
- If any portion of the document is performed from memory, do soin the sequence specified.
Perform each step as written, exceptwhen an approved process specifically allows deviation.
- Refer to the procedure or instruction at least once to ensurecompletion of the task in accordance with the requirements.
- Review the document at the completion of the task to verify thatall appropriate steps are performed and documented.
TABLE OF CONTENTSSectionPage1.0 RESPONSIBILITIES
..........................................................................................................................
22.0 ACRO NYMS ......................................................................................................................................
43.0 PROCEDURE
....................................................................................................................................
74.0 RETENTION OF RECORDS .....................................................................................................
7ATTACHMENT 1 Corporate Emergency Director Checklist
.....................................................................................
82 EOF Manager Checklist
.................................................................................................................
163 EOF Technical Leader Checklist
...............................................................................................
204 EOF Security Director Checklist
.................................................................................................
235 EOF Adm inistrative Leader Checklist
.......................................................................................
326 EOF Emergency Planning Coordinator Checklist
......................................................................
407 EOF Radiation Protection Leader Checklist
...............................................................................
478 EOF Emergency
- Advisor, Notifications Checklist
......................................................................
539 EOF Offsite Field Monitoring Team Checklist
.............................................................................
5810 Sum m ary of Changes .....................................................................................................................
61QA PROGRAM AFFECTING 50.59 DNA / 72.48 DNA / 50.54(q)
APPLIES / RX DNAProcedure TypeEPIPProcedure OwnerDeborah Lindbeck
-SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 2 of 621.0 RESPONSIBILITIES 1.1 VERIFY level of use requirements on the first page of this procedure.
1.2 The responsibilities of the Emergency Operations Facility (EOF) ERO personnel are as follows:1.2.1 Corporate Emergency Director (CED)Assumes Emergency Coordinator (EC) function from either the Station Emergency
- Director, or directly from the Emergency Coordinator in the Control Room following activation of the EOF.* Makes decision to notify offsite agencies (non-delegable)
- Makes Protective Action Recommendations (PARs) to offsite agencies (non-delegable)
- Initiates Site Evacuation (non-delegable) 1.2.2 EOF Emergency
- Advisor, Notifications (EAN)* Responsible for advising the CED and preparing offsite notifications.
- Responsible for maintaining communications with applicable local offsite agenciesand the state.1.2.3 EOF Manager* Responsible for monitoring offsite activities and providing interface with offsiteagencies, advising the CED and developing PARs. The EOF Manager, if CEDqualified, may fill in as the CED (prior to CED arrival or if the CED falls ill, etc.).* Communicates Technical information to the JIC Director and coordinates approvalof press releases between the CED and JIC staff.* Briefs offsite representatives on radiological release and plant status.* Acts as liaison between EOF personnel and interjurisdictional offsite authorities.
1.2.4 EOF Emergency Planning Coordinator Advises the Emergency Advisors and/or the CED in all Emergency Planrequirements.
Ensures support to various general positions which provide warehouse, autoservices and telecommunication support to EOF personnel.
Includes communicating with INPO and supporting the OSC Maintenance Coordinator in the procurement ofemergency parts and supplies.
REFERENCE USE j 501 23-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists
=SONGS Page 3 of 621.2.5 EOF Technical Leader" Provides engineering technical updates from the Technical Support Center (TSC) tothe CED. Responsible for following the status of the plant, using information fromIvory Phone, the TSC and Critical Function Monitoring System (CFMS).* Monitors the Ivory Phone.* Updates the plant status board to keep EOF staff informed of plant conditions.
- Uses the Brown Phone to communicate with the TSC.1.2.6 EOF Administrative LeaderCoordinates provisions for food, transportation and other logistical support foremergency personnel.
Acts as a liaison with offsite groups in providing additional resources.
Keeps the assembly area personnel informed of emergency status.* Provides administrative and logistical support to support personnel including telephone and facsimile operations, and other coordination activities.
- Updates the offsite status board and acts as a runner when needed.1.2.7 EOF Security Director* Provides information on security activities to the Corporate Emergency
- Director, andacts as liaison to the FBI/Law Enforcement agencies in the Joint Operations Center(JOC), if manned.* Coordinates security activities in the EOF including access control andaccountability.
1.2.8 EOF Radiation Protection Leader* Directs onsite and offsite monitoring during plume phase and recovery phase." Advises the Corporate Emergency Director on radiological aspects of activities, including protective actions.* Supports EOF with respect to dosimetry.
- Briefs and controls the onsite and offsite monitoring during plume phase andrecovery phase.* Assists with keeping ODAC informed of position and results found by the onsite andoffsite field monitoring teams.* Performs radiological surveys in EOF to ensure EOF habitability.
REFERENCE USE j V~L~S01 23-VIIII-EOF
(' ~ Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 4of 621.2.9 EOF Offsite Field Monitoring Teams (Monitors)
(Drivers)
- Monitors and performs air samples usually within the Emergency Planning Zone(EPZ) from the owner controlled fence out to the EPZ boundary.
- Performs environmental sampling during recovery phase.2.02.12.22.32.42.52.62.72.82.92.102.112.122.132.142.152.162.17ACRONYMSARM:AWS:Cal OES:CAPR:CED:CEDE:CDE:CFMSCHPCR:DAC:DACSEAL:EAN:EAOEC:EDT:Area Radiation MonitorAdministration Warehouse
& Supply/Shop California Office of Emergency ServicesCorrective Action to Prevent Reoccurance Corporate Emergency DirectorCombined External Dose Equivalent Combined Dose Equivalent Critical Function Monitoring SystemCalifornia Highway PatrolControl RoomDerived Airborne Concentration Dose Assessment Computer SystemEmergency Action LevelEmergency
- Advisor, Notifications Emergency
- Advisor, Operations Emergency Coordinator Event Declaration TimeREFERENCE USE P'.... SO123-VIII-EOF 1Emergency Response Organization (ERO) Emergency REV: Iout Operations Facility Position Checklists SONGS Page 5 of 622.18 EGL Emergency Group Leader2.19 ENF: Event Notification Form2.20 EOC: Emergency Operations Center2.21 EOF: Emergency Operations Facility2.22 EP: Emergency Plan2.23 EPC: Emergency Planning Coordinator 2.24 EPIP: Emergency Plan Implementing Procedure 2.25 EPZ Emergency Planning Zone2.26 ERDS: Emergency Response Data System2.27 ERF: Emergency Response Facility2.28 ERO: Emergency Response Organization 2.29 ERTD: Emergency Response Telephone Directory 2.30 GCC: Grid Control Center2.31 IOC: Irvine Operations Center2.32 ISFSI: Independent Spent Fuel Storage Installation 2.33 JIC Joint Information Center2.34 JOC Joint Operations Center2.35 KI: Potassium Iodide2.36 NRC: Nuclear Regulatory Commission 2.37 OCA: Owner Controlled Area2.38 ODAC: Offsite Dose Assessment CenterREFERENCE USE I .S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: ISOperations Facility Position Checklists SONGS Page 6 of 622.39 OSL Optically Stimulated Luminescent Dosimeter 2.40 OSSC: Onsite Security Commander 2.41 PA: Protected Area2.42 PAPA: Protected Area Personnel Accountability 2.43 PAR: Protective Action Recommendation 2.44 PASS: Post Accident Sampling System2.45 PAZ: Protective Action Zone2.46 REPCET: Representative Core Exit Temperature 2.47 RP: Radiation Protection 2.48 SAMG: Severe Accident Management Guideline 2.49 SC: Shift Communicator 2.50 SCBA: Self-Contained Breathing Apparatus 2.51 SCE: Southern California Edison2.52 SCP: Safeguards Contingency Plan2.53 SED: Station Emergency Director2.54 SL: Security Leader2.55 SM: Shift Manager2.56 SONGS: San Onofre Nuclear Generating Station2.57 SRO: Senior Reactor Operator2.58 SSAB SONGS Site Access Badge2.59 SSPF: South Security Processing FacilityREFERENCE USE J IDISO\51 23-VIlI-EOF~ Emergency Response Organization (ERO) Emergency REV: 1ISOperations Facility Position Checklists SONGS Page 7 of 622.60 TEDE:2.61 TSC:2.62 VNF:2.63 YPS:Total Effective Dose Equivalent Technical Support CenterVerbal Notification FormYellow Phone System3.0 PROCEDURE 3.1 OBTAIN a copy of the applicable ERO Position Checklist.
This checklist may be found in the firsttab of each ERO Position Book.3.2 ACTIVATION AND OPERATION OF THE EOF3.2.13.2.2Upon declaration of an ALERT or higher classification, EOF personnel shall report to theEOF. ERO positions shall obtain their Position Checklist and follow the instructions contained within.The Corporate Emergency Director (CED) should declare the EOF activated when thefollowing minimum staff positions have been filled:" Corporate Emergency Director" EOF Emergency
- Advisor, Notifications
- EOF Technical Leader* EOF Security Director* EOF Administrative Leader* EOF Radiation Protection Leader* EOF Offsite Field Monitoring Teams (Monitors)
(Drivers) 4.0 RETENTION OF RECORDS4.1 COLLECT all paperwork generated in response to the emergency event (e.g., logs procedures, attachments, forms and checklists)
AND DELIVER to either the TSC Manager, EOF Emergency Planning Coordinator or OSC Emergency Planning Coordinator.
REFERENCE USE SO123-VIII-EOF
('i ~ Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 8 of 62Corporate Emergency Director Checklist Attachment 1POSITION CHECKLIST Corporate Emergency Director Supplemental Position Instructions Table of ContentsSection Title PageNumber2.0 EOF/AEOF Activation 3.0 EV EN T N O TIFICA TIO N S .................................................................................
114.0 C R E D IB LE T H R EA T ........................................................................................
125.0 SECURITY EVENT ACTIVITIES
.......................................................................
126.0 ACTIVATION OF ALTERNATE EOF AT IRVINE OPERATIONS CENTER ..........
137.0 RE-ENTRY INTO EVACUATED AREAS .........................................................
138.0 EVENT RECLASSIFICATION/PAR/PAR UPGRADE/RADIOLOGICAL R E L E A S E ..............................................................................................................
1 39.0 EMERGENCY RESPONSE COORDINATION
................................................
1410 .0 T U R N O V E R ....................................................................................................
..1411.0 EV E N T C LO S EO U T .........................................................................................
15NOTE1. Sections 2.0 through 11.0 provide supplemental instructions for performing the CED duties and may be referenced for clarification of duties.2. Steps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS1.1 REFER to the following contained in position notebook:
- EP(123) 5, Turnover Status* EP(123) 6, Emergency Response Log Book* EP(123) CED-1, CED-EOF Briefing Guidelines
- EP(123) EC-1, Emergency Coordinator Turnover Status* EP(123) EOF-17, Guidance for Assembly/Evacuation of Non-Essential Personnel 0 EP(123) ERO-2, Alternate Emergency Response Facility Status Checklist
- EP(123) ERO-5, Credible Threat Plan Development
- Controlled set of EPIPs* Emergency Response Telephone Directory (ERTD)REFERENCE USEAttachment 1Page 1 of 8 Z t o SO123-VIII-EOF i Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 9 of 62Corporate Emergency Director Checklist Attachment 11.2 MAINTAIN a log of activities.
1.3 MAINTAIN an open phone circuit with the SED to ensure awareness of changing plant conditions.
1.4 DECLARE the EOF/AEOF activated when minimum staffing requirements are met and EOFpersonnel are able to perform their emergency response duties.1.4.1 ANNOUNCE the activation of the EOF to EOF personnel AND PERFORM an Initial EOFBriefing using the Desktop job aide.1.5 REVIEW copies of completed EP(123) 10, Event Notification Form, and/or EP(123) 11, VerbalNotification Form.1.6 INFORM the SED the EOF/Alt EOF is activated and is ready for EC turnover.
1.7 Emergency Coordinator (EC) Turnover1.7.1 DIRECT EOF Leaders to come to the CED table for EC turnover:
- EOF Manager* EOF Technical Leader* EOF Radiation Protection Leader* EOF Emergency Planning Coordinator
- EOF Security Director* EOF Administrative Leader1.8 DIRECT the SED to begin EC Turnover using EP(1 23) EC-1, Emergency Coordinator TurnoverStatus.NOTESO123-VII1-10, Emergency Coordinator Duties may be referenced for detailedEC duties.1.9 WHEN EC Turnover is complete, THEN:1.9.1 PERFORM a Team Update to inform the EOF the EC title is turned over to the CEDusing CED/EOF Briefing Guidance (Section 2.0, only).REFERENCE USEAttachment 1Page 2 of 8 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1IPage 10 of 62ICorporate Emergency Director Checklist I Attachment 1NOTEEmergency announcements must be made by the Control Room (due to needto activate the Emergency Alarms).
This is accomplished by either calling theSM and providing instructions or faxing copy of the announcement to theControl Room and providing direction to make the announcement.
1.10 IF NRC Site Team is present in the EOF, THEN NOTIFY the NRC Site Team immediately aftercompletion of notification to local and state authorities.
1.11 Assume the following non-delegable duties:" Decision to notify offsite agencies* Making protective action recommendations to offsite agencies* Site Evacuation 1.12 CONDUCT periodic EOF briefings (approximately every 30-60 minutes) or following significant changes in plant status.1.13 DETERMINE AND SUPPORT plant priorities.
1.14 ENSURE that adequate technical and logistic support is available to the station emergency organization.
1.15 ENSURE Offsite Notifications are completed per S0123-VIII-30.7, Emergency Notifications.
1.16 ENSURE PARs are completed per S0123-VIII-10.3, Protective Action Recommendations.
1.17 PERFORM evacuation of non-essential site personnel per EP(123) EOF-17, Guidance forAssembly/Evacuation of Non-Essential Personnel at SAE or higher.1.18 ENSURE status boards are maintained.
1.19 ENSURE Offsite Organizations in EOF are briefed.1.20 CONDUCT shift turnover as warranted.
1.21 ENSURE event closeout and recovery per S0123-VII1-10.5, Event Closeout and Recovery.
REFERENCE USEAttachment 1Page 3 of 8 JA, 1I)SL S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists soNGS Page 11 of 62Corporate Emergency Director Checklist Attachment 11.21.1 COMPLETE all checklist items.1.21.2 ENSURE post-event critiques are conducted in each Emergency Response Facility.
1.21.3 RETURN the workstation to its original condition.
1.21.4 RETURN all document binders to their storage location.
1.21.5 RETURN any emergency response equipment to its original location.
1.2.1.6 PROVIDE all paperwork to the Emergency Preparedness Coordinator.
SUPPLEMENTAL POSITION INSTRUCTION NOTE1. Sections 2.0 through 11.0 provide supplemental instructions for performing the CED duties and may be referenced for clarification of duties.1. Steps may be performed in any order or concurrently.
- 2. The following steps are an enhancement to the position checklist.
Placekeeping is not required.
2.0 EOF/AEOF Activation 2.1 Notifications to California Office of Emergency Services (CAL OES) and Yellow Phone System(YPS) Stations2.1.1 REVIEW, APPROVE, AND SIGN required EP(123) 11 Forms (Verbal Notification Forms)prior to being communicated to CAL OES or YPS Stations.
2.1.2 REVIEW, APPROVE, AND SIGN all EP(123) 10 Forms (Event Notification Forms) priorto being faxed to CAL OES or YPS Stations.
2.2 Protective Action Recommendations (PARs)2.2.1 DETERMINE PARs in accordance with S0123-VIII-1 0.3.2.2.2 WHEN conditions require PAR upgrades, THEN UPGRADE PARs.2.2.2.1 MONITOR Changing wind direction from one Protective Action Zone (PAZ) to another inaccordance with S0123-VII1-1 0.3.2.2.2.2 MONITOR Changing radiological conditions when wind direction impacts PAZ 5 inaccordance with SO123-VII1-10.3.
REFERENCE USEAttachment 1Page 4 of 8 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 12 of 62Corporate Emergency Director Checklist I Attachment 1NOTE1) The Emergency Response Position (Shift Manager or Station Emergency Director) who is the EC is responsible for ensuring Non-Essential Personnel are assembled.
- 2) The Emergency Response Position (Shift Manager or Station Emergency Director) who is the EC is responsible for ensuring Non-Essential Personnel are evacuated.
- 3) The SED may use EP(1 23) EOF-17, (Guidance for Assembly/Evacuation of Non-Essential Personnel) to assist in the assembly/evacuation process.2.3 Evacuation of Non-Essential Personnel 2.3.1 PERFORM EP(1 23) EOF-1 7, Guidance for Assembly/Evacuation of Non-Essential Personnel.
2.3.2 ASSESS the status and potential for evacuation of Camp Mesa.2.3.3 EVALUATE the need for evacuation of non-emergency response personnel perSO1123-VIII-10.3:
3.0 EVENT NOTIFICATIONS 3.1 ENSURE the Technical Leader to notify American Nuclear Insurers (ANI) of the declaration of anemergency at San Onofre (refer to Emergency Response Telephone Directory
[ERTD] for PhoneNumber).3.2 REVIEW AND APPROVE news releases prior to their release.
(For Security-related events, directthe Security Director to review news releases prior to their approval).
4.0 CREDIBLE THREAT4.1 REVIEW EP(1 23) ERO-5, Credible Threat Plan Development, with the Security Director and theSED to develop an appropriate level of response to a credible threat.5.0 SECURITY EVENT ACTIVITIES 5.1 IF the emergency is a Security Event, THEN CONFER with the Security Director to determine theappropriate time to address EP(123) EC-2, EC Post-Security Event Checklist.
5.2 REFER to S01 23-VII1-10.6 for guidance on declared Security-related events.REFERENCE USEAttachment 1Page 5 of 8 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: IPage 13 of 62ICorporate Emergency Director Checklist Attachment 16.0 ACTIVATION OF ALTERNATE EOF AT IRVINE OPERATIONS CENTER6.1 IF conditions exist that prevent access to the EOF as a result of severe weather or other reason,THEN CONSULT with Emergency Advisors to direct activation of the Alternate EOF (AEOF) at theIrvine Operations Center (IOC).6.2 IF the EOF is already manned, AND IF conditions exist which require evacuation, THEN DIRECTthe EOF staff to relocate to the AEOF at the IOC.6.3 IF any of the hazards listed below affect the EOF, THEN CONSULT with EOF Staff to determine the necessity for relocation of the staff to the AEOF." High EOF or portable radiation monitor readings* Fire in or near the EOF* Security hazards which threaten personnel 6.4 TURN OVER EC functions to the SED in the TSC until the AEOF is staffed.6.5 COLLECT AND TRANSPORT materials and equipment necessary to perform emergency responsefunctions at the alternate facility.
6.6 WHEN time allows, THEN CONDUCT an assessment of emergency response facility status,command and control functions, and key ERO functions using EP(123) ERO-2, Alternate Emergency Response Facility Status Checklist.
7.0 RE-ENTRY INTO EVACUATED AREAS7.1 IF the hazard causing an evacuation of the EOF has been eliminated or controlled to a point thatwill allow use of the EOF, THEN DIRECT the EPC to coordinate re-entry efforts.8.0 EVENT RECLASSIFICATION/PAR/PAR UPGRADE/RADIOLOGICAL RELEASE8.1 DETERMINE PARs using SO123-VIII-10.3.
- 1. Classification and declaration of an emergency event.REFERENCE USEAttachment 1Page 6 of 8 110- 'IA" SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 14 of 62Corporate Emergency Director Checklist Attachment 19.0 EMERGENCY RESPONSE COORDINATION 9.1 BRIEF the following EOF Leads at periodic intervals so that they are aware of current emergency conditions in accordance with form EP(123) CED-1, CED-EOF Briefing Guidelines:
- EOF Manager* Radiation Protection Leader* Technical Leader* Emergency Advisor Notification
- Administrative Leader* Security Director* ODAC (if not already provided information)
- NRC (if present)9.2 Emergency Response Facility (ERF) Staff Minimization 9.2.1 IF the plant is stable and there is NO threat of escalation, THEN the CED may reduce thestaffing in the ERFs to appropriate levels.10.0 TURNOVER10.1 Turnover shall NOT prevent timely completion of the primary EC responsibilities of classification, notification and PAR.10.2 CONDUCT an assessment of notifications in progress prior to turnover of the EC duties.10.3 EP(1 23) EC-1, Emergency Coordinator Turnover Status, with the relief CED.10.3.1 IF alternate emergency response facilities have been activated, THEN COMPLETEEP(123) ERO-2, Alternate Emergency Response Facility Status Checklist, ANDDISCUSS with the relief CED.10.3.2 WHEN the off-going CED is relieved of all duties, THEN the relief CED shall announce toEOF personnel over the public address system the following:
- Name* Assumption of the CED position* Emergency Class* PARREFERENCE USEAttachment 1Page 7 of 8 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SO123-VIII-EOF REV: 1Page 15 of 62ICorporate Emergency Director Checklist Attachment 110.3.3 HAVE the turnover announced to all Emergency Response Facilities via the Ivory Phone.11.0 EVENT CLOSEOUT11.1 WHEN conditions have improved and meet the criteria for event closeout, THEN PERFORMactions lAW S0123-VIII-10.5.
REFERENCE USEAttachment 1Page 8 of 8 1Y~Ls~S51 23-VIII-EOF AN¶~Emergency Response Organization (ERO) Emergency REV: 1I_ Operations Facility Position Checklists
---SONGS Page 16 of 62EOF Manager Checklist Attachment 2POSITION CHECKLIST NOTESteps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS1.1 REFER to the following contained in position notebook:
- EP(123) 5, Turnover Status* EP(123) 6, Emergency Response Log Book.1.2 ASSUME the position of EOF Manager.1.2.1 SIGN in on the EOF Minimum Staffing Board.1.2.2 VERIFY communications devices function.
1.3 ESTABLISH AND MAINTAIN a log using form EP (123) 6.1.4 LOG onto the computer to receive press releases from the JIC.* Network User ID -enccomm" Network Password
-NewscenterQ (the last four digits of the password will always be currentquarter and current year, e.g. 0113)* Lotus Notes Email ID -ENC Communications
- Lotus Notes Password
-NewscenterQ (the last four digits of the password will always becurrent quarter and current year, e.g. 0113)1.5 IF the CED is NOT present, THEN IMPLEMENT the CED appropriate portions of this procedure UNTIL the CED arrives -ONLY IF CED QUALIFIED.
1.6 ESTABLISH AND MAINTAIN contact with the intrajurisdictional offsite authorities.
1.7 ASSIST Corporate Emergency Director (CED) in setting offsite priorities.
1.7.1 CONSIDER including minimum staffing and facility activation as initial priorities.
1.7.2 CONSIDER including initial and follow-up notifications as on-going priorities.
REFERENCE USEAttachment 2Page 1 of 4 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 17 of 62EOF Manager Checklist Attachment 21.8 ASSIST1.8.1in the activation of the facility.
VERIFY minimum staffing prior to declaring the EOF activated.
- Advisor, Notifications
- EOF Emergency Planning Coordinator
- EOF Technical Leader* EOF Security Leader* EOF Administrative Leader" EOF Radiation Protection Leader* EOF Offsite Field Monitoring Teams (Monitors)
(Drivers) 1.9 REPORT to the CED when the EOF is ready to assume responsibilities.
1.10 ESTABLISH contact with the JIC Director by calling 7-51502 AND PROVIDE initial conditions including radiological conditions and PAR.2.0 CONTINUING ACTIONS2.1 DISMISS EOF personnel not filling positions and instruct them to assemble in a designated area ofthe building.
2.2 ENSURE the EOF functions are executed in a timely and efficient manner.2.2.1 COORDINATE and direct all personnel assigned to the EOF.2.2.2 PROVIDE guidance to key members of the EOF staff.2.2.3 INFORM the CED of significant activities of the EOF.2.3 ENSURE offsite communications are being made.2.3.1 CONFIRM EAN has made contact with offsite Federal, State, and local officials to informthem of the current situation at SONGS.2.3.2 IF delegated by the CED is his absence from the area, THEN SIGN AND TRANSMITfollow-up notifications following a review.REFERENCE USEAttachment 2Page 2 of 4 jDso\ [S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 18 of62EOF Manager Checklist Attachment 22.4 Press Releases2.4.1 REVIEW press releases.
2.4.1.1 IF the CED has any changes to the press release, THEN COMMUNICATE thesechanges by phone to the JIC Director at 7-51502.2.4.1.2 IF there are NO changes required to the email, THEN COMMUNICATE this to the JICDirector via phone at 7-51502.2.4.1.3 PROVIDE a copy of the approved Press release to the EOF Administrative Leader fordistribution throughout the EOF.2.5 ACT as a liaison for CED for any topics concerning press releases.
2.6 ACT as a liaison to gather and provide information for the JIC.2.6.1 PROVIDE updates on changes to radiological conditions, PARs, or significant changes inplant or personnel conditions.
2.7 RECORD any JIC requested information AND ASK the EOF Technical Leader (for Operational questions) or the EOF RP Leader (for Radiological questions) to provide appropriate information.
2.8 ASSIST AND ADVISE the CED in formulation of the PAR.2.8.1 DETERMINE the status of implementation of any previously issued offsite protective actions.2.8.2 MAINTAIN liaison with the Radiation Protection Leader, Tech Team Leader and SecurityDirector for PAR development.
2.8.3 DISCUSS PARs with ODAC, including explanations of plant conditions.
2.9 ASSIST the EA Notifications in the preparation of Event Notification forms.2.10 ADVISE the EOF Administrative Leader and the EP Coordinator to perform the following:
- COORDINATE site arrival of NRC* Have Security ESCORT NRC to Joint Operations Center (JOC).* COLLECT pertinent information (provide list, includes most recent written; Verbal Notifications, EOF layout, etc.).* MEET NRC in JOC AND BRIEF them on the status of the emergency.
REFERENCE USEAttachment 2Page 3 of 4 15 .(I'O SO123-VIII-EOF (3: Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGs Page 19 of 62EOF Manager Checklist Attachment 22.11 ENSURE the EOF and Plant Priorities Board reflects pertinent offsite related activities.
2.12 DEVELOP a recovery plan for the emergency in accordance with S0123-VII1-1 0.6.2.13 PROVIDE oversight and direction for Evacuation of onsite personnel.
2.13.1 After consulting with the Radiation Protection Leader, DESIGNATE the evacuation routeto the EOF Administrative Leader based on wind direction.
2.14 CONDUCT shift turnover with oncoming EOF Manager.2.15 Upon event termination, ENSURE all EOF Manager materials have been returned to a state ofreadiness.
2.15.1 COMPLETE all checklist items.2.15.2 FACILITATE facility post-event critique.
2.15.3 RETURN the workstation to its original condition.
2.15.4 RETURN all document binders to their storage location.
2.15.5 RETURN any emergency response equipment to its original location.
2.15.6 PROVIDE all paperwork to the Emergency Planning Coordinator.
REFERENCE USEAttachment 2Page 4 of 4 I ~ S01 23-VIII-EOF (jN~Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 20 of 62EOF Technical Leader Checklist Attachment 3POSITION CHECKLIST NOTESteps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS.1.1 REFER to the following contained in position notebook:
- EP(123) 5, Turnover Status* EP(123) 6, Emergency Response Log Book1.2 ESTABLISH AND MAINTAIN a log using form EP(123) 6.1.3 WHEN ready to perform your ERO function, THEN SIGN-IN on the EOF minimum staffing board.1.4 ESTABLISH Ivory Phone communications with the Control Room, TSC, and Operations SupportCenter (OSC).1.5 INFORM the following persons of the current plant conditions:
" CED* Emergency
- Advisor, Notifications
" EOF Manager1.6 POST information on Plant Status Board.1.7 PROVIDE, at a minimum, the following information over the Ivory Phone:* Activation of the EOF* Assumption of the CED duties1.8 PARTICIPATE in facility staff briefings.
2.0 CONTINUING ACTIONS2.1 NOTIFY the CED and EOF RP Leader of changing plant conditions as notified by the TSCTechnical Team and/or CFMS.2.2 PROVIDE, at a minimum, the following information over the Ivory Phone:REFERENCE USEAttachment 3Page 1 of 3 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SO1v23-VIII-EOF REV: 1Page 21 of 62EOF Technical Leader Checklist Attachment 3" Changes in PARs* Major Decisions made by the CED/_12.3 IF requested by the TSC Technical Leader, THEN COORDINATE call-in of additional engineering personnel.
2.3.1 ACT as technical interface with ODAC.2.4 SUPPORT PAR recommendations.
2.5 PARTICIPATE in facility staff briefings.
2.6 ASSIST in the development of new or revised operational procedures and strategies for mitigating the emergency.
2.7 OBTAIN AND PROVIDE technical information to the EOF Manager.2.8 EVACUATION 2.8.1 IF the EOF is evacuated, THEN ENSURE you have the necessary materials beforeproceeding to the alternate EOF.2.9 TURNOVER2.9.1 WHEN a relief EOF Technical Leader arrives at the EOF, THEN:2.9.1.1 CONDUCT turnover with the oncoming EOF Technical Leader in accordance withForm EP(123) 5.2.9.1.2 REPORT completion of turnover to the CED.2.10 RECOVERY2.10.1 WHEN requested by the CED, THEN RECOMMEND additional personnel and equipment necessary for a recovery organization.
2.10.2 IF additional assistance is required, (beyond that available from SONGS and localagencies, Westinghouse,
- Bechtel, etc.), THEN OBTAIN aid from other utilities or fromINPO.2.10.3 EVALUATE staffing needs.2.11 Event Termination/Recovery REFERENCE USEAttachment 3Page 2 of 3 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SO123-VIII-EOF REV: 1Page 22 of 62IEOF Technical Leader Checklist Attachment 32.11.1 WHEN conditions have improved and meet the criteria for event closeout, THENPERFORM actions lAW SO123-VIII-10.5.
REFERENCE USEAttachment 3Page 3 of 3 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 23 of 62EOF Security Director Checklist Attachment 4POSITION CHECKLIST Security Director Supplemental Position Instruction Table of ContentsSectionNumber3.04.05.06.07.08.09.0TitlePageINITIAL ACTIO NS ......................................................................................................
28M ANUAL ACCO UNTABILITY
....................................................................................
29EVACUATIO N .................................................................................................................
29RE-ENTRY INTO EVACUATED EO F ........................................................................
30RADIO USE DURING A SECURITY EM ERG ENCY ...................................................
30TURNOVER
....................................................................................................................
30EVENT CLO SEO UT .....................................................................................................
31NOTE1. Sections 3.0 through 9.0 provide supplemental instructions for performing the Security Director duties and may be referenced for clarification ofduties.2. Steps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS1.1 REFER to the following contained in position notebook:
- EP(123) 5, Turnover Status* EP(123) 6, Emergency Response Log Book* EP(123) 295, EOF Personnel Accountability
- EP(123) ERO-5, Credible Threat Plan Development
- EP(123) EOF-18, Emergency Information for Oncoming Personnel 1.2 WHEN ready to perform your ERO function, THEN SIGN-IN on the EOF minimum staffing board.1.3 ESTABLISH AND MAINTAIN a log using form EP(123) 6.1.4 CLOSE EOF steel doors AND ESTABLISH Site Electronic Access System (SEAS) access.REFERENCE USEAttachment 4Page 1 of 9 SO123-VIII-EOF 1w Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 24 of 62EOF Security Director Checklist
-Attachment 41.5 PROVIDE additional security for EOF to limit EOF access to Emergency Response Organization (ERO) members.2.0 CONTINUING ACTIONS2.1 IF the emergency is due to a Security Event, THEN PERFORM the following:
2.1.1 REVIEW, EP(123) ERO-5, Credible Threat Plan Development.
2.1.2 SUPPORT discussions with the CED and the SED to develop an appropriate level ofresponse to a credible threat.2.1.3 Continually ASSESS evacuation routes AND NOTIFY the CED IF any evacuation impediments exist.2.1.4 IF status of the event is established, THEN CONTACT the Security Leader and IncidentCommand Post AND ACQUIRE information regarding the following:
- Event description (include personnel status and plant status)" Status of Law Enforcement Agencies notifications
- Known response to requests for assistance 2.2 INITIATE Form EP(123) 295, EOF Personnel Accountability, as follows:* Whenever EOF entry/exit card reader is inoperable;
- For personnel requiring EOF entry who do NOT have an SONGS Site Access Badge (SSAB);* For personnel who have another type of generic badge (e.g., Orange County);* For personnel requiring EOF entry who are assigned to OSC/TSC who do NOT have EOFSEAS access.2.3 IF notified by the EOF EPC that there are personnel at the ERO Staging Areas, THENCOORDINATE the movement of ERO personnel to the EOF with local law enforcement agencies.
2.4 ASSIST with the review of security event related news releases prepared by the ERO to ensure thefollowing:
2.4.1 IF present in the Joint Operations Center (JOC), THEN GIVE Law enforcement anopportunity to review the news release prior to its approval.
2.4.2 IF there are revisions needed prior to its issuance, THEN PROVIDE the suggested changes to the CED.2.4.3 PROVIDE a copy of the approved news release to the JOC.REFERENCE USEAttachment 4Page 2 of 9
-ru SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 25 of 62EOF Security Director Checklist Attachment 42.5 Joint Operations Center (JOC) Liaison and Support2.5.1 IF the JOC is to be staffed, THEN ENSURE that the CED/SED and the EOF EPC areaware that the JOC will be staffed.2.5.2 ENSURE the JOC is open and ready for use by responding agencies and personnel.
2.5.3 COMPLETE EP(123) EOF-18, Emergency Information for Oncoming Personnel, ANDUTILIZE it to brief JOC responders.
2.5.4 INFORM the CED/SED on the status of JOC staffing.
2.5.5 PROVIDE information to the JOC regarding site security actions associated with theevent.2.5.6 PROVIDE information to the JOC regarding plant conditions throughout the emergency by utilizing the Technical Leader.2.5.7 INTERFACE with law enforcement personnel responding to the JOC AND PROVIDEperiodic feedback to the CED/SED regarding actions taken by the JOC staff.2.5.8 PROVIDE periodic information to the CED regarding the status of the security responsethroughout the emergency.
2.5.9 PROVIDE road conditions to the EOF Manager to support PARs.2.5.10 In the event that the EOF HVAC System is operated in the Isolation mode, INFORM theJOC, staffing may be limited due to the constraints of the system.2.6 Emergency Response Coordination 2.6.1 ENSURE that the CED is aware when ERO personnel may safely respond to the Stationfor mitigation and/or recovery actions.2.6.2 COORDINATE ERO staff movement with the Law Enforcement Agencies to supportresponse activities which may include:2.6.2.1 The movement of ERO personnel from the North and/or South Staging areas to the site.2.6.2.2 The movement of personnel to support ERO shift change and/or additional ERO staff.2.6.2.3 IF the OSC and TSC have relocated to the EOF/E50, THEN COORDINATE site accessfor ERO staff and OSC teams with the Security Leader and Law Enforcement Agencies.
REFERENCE USEAttachment 4Page 3 of 9 S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists Page 26 of 62EOF Security Director Checklist Attachment 42.7 ASSIST with evacuation of Camp Mesa and Assembly Areas by:2.7.1 Supporting the Administrative Leader2.7.2 Contacting the TSC Security Leader to coordinate support with:* Assembly/evacuation of Camp Mesa personnel
- Assembly/evacuation of non-essential personnel 2.8 IF any hazards listed below affect a major portion of Mesa Area, THEN CONTACT EOF EPC ANDRECOMMEND a Mesa Area assembly or evacuation.
" High radiation alarms or unexpected high radiation levels on Area Radiation Monitors (ARMs),building or containment ventilation
- monitors, portable radiation
- monitors, or continuous airmonitors* Spills of radioactive material which may result in excessive personnel exposure" Fire in any occupied area* Toxic/flammable gases or heavy smoke reported* Chemical hazards to personnel
- High pressure steam or water leaks* Security hazards which threaten personnel or equipment safety2.9 Upon direction of EOF EPC or CED to evacuate/relocate Primary EOF to Alternate EOF at IrvineOperations Center (IOC), or if initially rendered uninhabitable, THEN:2.9.1 NOTIFY Security Leader and OSC Security Coordinator; 2.9.2 CONDUCT a sweep of EOF to ensure all personnel have evacuated; 2.9.3 ENSURE NO Safeguards Information (SGI) material is left unattended; 2.9.4 WHEN EOF evacuation is complete/Building E50 has been secured, THEN NOTIFYOSC Security Coordinator and Security Leader.2.9.5 Upon arrival at Alternate EOF in Irvine, NOTIFY OSC Security Coordinator and SecurityLeader of your PAX number.2.10 PERFORM necessary security support functions to facilitate re-entry.
2.11 IF possibility of a bomb or other explosive device exists, THEN ADVISE EOF EPC or CED toannounce restrictions of radio transmissions for a 300-foot radius from device location.
REFERENCE USEAttachment 4Page 4 of 9 i'LS9 SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 27 of 62EOF Security Director Checklist Attachment 42.12 CONDUCT turnover with oncoming Security Director per Form EP(123) 5.2.13 RECORD completion of turnover in Security Director Log, AND REPORT completion of turnover toSecurity Director and EOF EPC.2.14 Event Closeout2.14.1 OPEN EOF steel doors AND RETURN temporary security badges to storage.REFERENCE USEAttachment 4Page 5 of 9 l SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists SONGS Page 28 of 62EOF Security Director Checklist Attachment 4SUPPLEMENTAL POSITION INSTRUCTION NOTE1. Sections 3.0 through 9.0 provide supplemental instructions for performing the Security Director duties and may be referenced for clarification ofduties.2. Steps may be performed in any order or concurrently.
- 3. The following steps are an enhancement to the position checklist.
Placekeeping is not required.
3.0 INITIAL ACTIONS3.1 CLOSE AND SECURE large EOF steel doors.3.2 ESTABLISH security controlled entry/exit to EOF by restricting EOF access to use of a singleentry-exit door.3.2.1 ENSURE personnel responding to EOF scan their SONGS Site Access Badge (SSAB)through Site Electronic Access System (SEAS) card reader.3.2.2 IF E50 must be used as an alternate OSC or TSC, THEN DIRECT responding OSC/TSCmembers to the E50 lunch room door for access to the alternate OSC and TSC.3.2.3 During activation of EOF, REQUEST EOF EPC to assign another person to assist withaccess and badging duties.3.2.4 ENSURE classrooms 1-4 are open.3.2.5 WHEN EOF security doors have been secured and EOF access control has beenestablished, THEN REQUEST EOF EPC to make the following EOF PA announcement:
"All non-emergency response personnel, exit the EOF and report to Classrooms 1through 4.""EOF personnel who have NOT logged into SEAS, report to the security office to cardinto SEAS at this time."3.3 OBTAIN EOF EPC authorization for access for those persons who do NOT possess photoidentification.
3.3.1 Personnel or visitors who do NOT have an SSAB and/or do NOT have EOF access,SIGN-IN on Form EP(123) 295, EOF Personnel Accountability, AND PROVIDE photoidentification.
REFERENCE USEAttachment 4Page 6 of 9 S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists Page 29 of 62EOF Security Director Checklist I Attachment 43.4 IF personnel declare they have consumed alcohol within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of reporting to EOF, THEN,DIRECT them to E50 Local Assembly Area (classrooms 1 through 4) to await further instructions.
3.4.1 INFORM EOF EPC or CED.3.4.2 FORWARD all communications/instructions received from EOF EPC or CED topersonnel who have declared alcohol consumption.
3.5 Immediately NOTIFY OSC Security Coordinator when NRC personnel arrive on site, providing theirnames.3.6 DIRECT news media or other related inquiries to JIC Director at Joint Information Center (JIC) orEOF EPC.3.7 WHEN directed by EOF EPC or CED, THEN CONFIRM radiological survey conducted by the RPTechnicians prior to permitting personnel access to EOF.3.8 GRANT access to medical casualties delivered to EOF medical treatment room on a priority basiswith RP Technician's approval.
3.9 IF notified of an inbound helicopter, THEN INFORM EOF RP Leader and EOF EPC.3.10 ACT as the primary Security interface within the EOF liaison organization.
3.11 COORDINATE security matters with TSC Security Leader and OSC Security Coordinator.
3.12 ASSIST with Site Evacuation AND MONITOR security sweeps of Mesa work areas.4.0 MANUAL ACCOUNTABILITY 4.1.1 INITIATE Form EP(123) 295, EOF Personnel Accountability, as follows:* Whenever EOF entry/exit card reader is inoperable;
- For personnel requiring EOF entry who do NOT have an SSAB;* For personnel who have another type of generic badge (e.g., Orange County).* For personnel requiring EOF entry who are assigned to OSC/TSC who do NOThave EOF SEAS access.5.0 EVACUATION 5.1 IF any hazards listed in step 5.2 exist, THEN immediately NOTIFY EOF EPC AND AWAITinstructions.
REFERENCE USEAttachment 4Page 7 of 9
": 1 S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists
-- soNGs Page 30 of 62EOF Security Director Checklist Attachment 45.2 IF any hazards listed below affect a major portion of Mesa Area, THEN CONTACT EOF EPC ANDRECOMMEND a Mesa Area assembly or evacuation.
" High radiation alarms or unexpected high radiation levels on Area Radiation Monitors (ARMs),building or containment ventilation
- monitors, portable radiation
- monitors, or continuous airmonitors* Spills of radioactive material which may result in excessive personnel exposure" Fire in any occupied area* Toxic/flammable gases or heavy smoke reported* Chemical hazards to personnel
" High pressure steam or water leaks* Security hazards which threaten personnel or equipment safety5.3 WHEN directed by EOF EPC or CED to evacuate/relocate Primary EOF to Alternate EOF at IrvineOperations Center (IOC), OR IF initially rendered uninhabitable, THEN:5.3.1 NOTIFY TSC Security Leader and OSC Security Coordinator; 5.3.2 CONDUCT a sweep of EOF to ensure all personnel have evacuated; 5.3.3 ENSURE NO Safeguards Information (SGI) material is left unattended; 5.3.4 WHEN EOF evacuation is complete/Building E50 has been secured, THEN NOTIFYOSC Security Coordinator and TSC Security Leader.5.3.5 Upon arrival at Alternate EOF in Irvine, NOTIFY OSC Security Coordinator andTSC Security Leader of your PAX number.6.0 RE-ENTRY INTO EVACUATED EOF6.1 WHEN requested by personnel coordinating re-entry
- efforts, THEN PERFORM necessary securitysupport functions to facilitate re-entry.
7.0 RADIO USE DURING A SECURITY EMERGENCY 7.1 IF possibility of a bomb or other explosive device exists, THEN ADVISE EOF EPC or CED toannounce restrictions of radio transmissions for a 300-foot radius from device location.
8.0 TURNOVER8.1 CONDUCT turnover with oncoming EOF Security Director per Form EP(123) 5, Turnover Status.REFERENCE USEAttachment 4Page 8 of 9 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SO123-VIII-EOF REV: 1Page 31 of 62EOF Security Director Checklist I Attachment 48.2 RECORD completion of turnover in Security Liaison Log, AND REPORT completion of turnover toSecurity Director and EOF EPC.9.0 EVENT CLOSEOUT9.1 OPEN EOF steel doors AND RETURN temporary security badges to storage.9.2 EOF members LOG OUT of SEAS at the Security Office.REFERENCE USEAttachment 4Page 9 of 9 501S 23-VIII-EOF (3 _ Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists soNGs Page 32 of 62EOF Administrative Leader Checklist Attachment 5POSITION CHECKLIST Administrative Leader Supplemental Position Instruction Table of ContentsSectionNumber Title Page9 .0 A C T IV A T IO N .............................................................................................................
3 80...................................................................................................................................
3 810.0 SITE AREA EMERGENCY/SITE ASSEMBLY
.....................................................
380...................................................................................................................................
3 811.0 EMERGENCY RESPONSE COORDINATION
....................................................
380...................................................................................................................................3 80...................................................................................................................................
3 80...................................................................................................................................
3 80...................................................................................................................................
3 812.0 LOGISTICAL SUPPORT ......................................................................................
380...................................................................................................................................
3 90...................................................................................................................................
3 9NOTE1. Sections 9.0 through 12.0 provide supplemental instructions for performing the Administrative Leader duties and may be referenced for clarification ofduties.2. Steps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS1.1 REFER the following contained in position notebook:
- EP(123) 5, Turnover Status* EP(123) 6, Emergency Response Log Book* EP(123) EOF-5, Reporting Of Accidents
- EP(123) EOF-6, Notification Of Emergency Contact* EP(123) ERO-4, Site And Local Assembly Area Tracking Sheet* EP(123) ERO-6, Assembly Area Briefing Script1.2 WHEN ready to perform your ERO function, THEN SIGN-IN on the EOF minimum staffing board.1.3 ESTABLISH AND MAINTAIN a log using form EP(123) 6.REFERENCE USEAttachment 5Page 1 of 8 S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists so1GS Page 33 of 62EOF Administrative Leader Checklist Attachment 51.4 ASSIST EOF Security Director and EOF Emergency Planning Coordinator (EPC) with activation ofthe EOF.1.5 ASSIST the EPC with facility set-up.1.6 COORDINATE the following:
1.6.1 Set-up of the hard-copy distribution boxes.1.6.2 Distributing/sending FAX messages.
1.6.3 Providing and distributing copies.1.6.4 Providing Corporate Documentation Management (CDM) support to the OSC and TSC.1.7 CONSULT with the EPC with questions.
1.8 IF a bomb threat is received, THEN IMPLEMENT S0123-IV-9.6, Bomb Threats.2.0 EMERGENCY RESPONSE COORDINATION 2.1 Administrative Support2.1.1 CONSULT with EPC and other facility leaders to determine the need for resources orsupport.2.1.2 ENSURE material is copied and distributed.
2.1.2.1 CONSULT with the EPC with questions on distribution of material.
2.1.3 ENSURE distribution boxes, assigned to Offsite Dose Assessment Center (ODAC), andOffsite Liaison are checked periodically for material to distribute.
2.1.4 COORDINATE food and lodging for Emergency Response Personnel via ERTDCorporate Support contacts.
2.2 CDM Support2.2.1 REQUEST support from Information Governance (Rosemead) or CDM Pomona at PAX61633 for assistance with required
- drawings, manuals, or documents.
REFERENCE USEAttachment 5Page 2 of 8 JII)LS951 23-VIII-EOF (3 Emergency Response Organization (ERO) Emergency REV: 1IOperations Facility Position Checklists SONGS Page 34 of 62EOF Administrative Leader Checklist Attachment 52.3 Facsimile Operations 2.3.1 ENSURE material is faxed." Initial News Release as delivered by the EOF Manager/EPC:
FAX to the JointInformation Center (JIC) and the Technical Support Center (TSC)." Subsequent News Releases:
FAX to the TSC." Offsite Dose Assessment Center Notification Forms: FAX as directed by ODACpersonnel.
2.4 Recall of Additional Personnel 2.4.1 CONSULT with EOF RP Leader and Security Director to determine safest and mostdirect route to plant.2.4.2 INFORM EOF Leaders, TSC Manager, OSC (Emergency Planning Coordinator) and CR(Operations Leader) of relief shift plans (as discussed with CED or EOF Manager).
2.4.3 COORDINATE recall, advising requested recall personnel, including relief shift reporting time and route recalled personnel should take to plant. [NN 201507385]
2.4.4 ENSURE recall of requested personnel is coordinated, as directed.
2.4.5 COORDINATE recall for EOF, TSC, OSC and CR personnel.
2.4.6 OBTAIN a copy of relief rosters from TSC Manager and OSC Emergency PlanningCoordinator (EPC).2.4.7 TRACK current staffing and relief staffing.
3.0 EOF TELEPHONE OPERATIONS 3.1 ENSURE incoming messages are delivered directly to EOF personnel (including local, state andfederal representatives).
REFERENCE USEAttachment 5Page 3 of 8 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SO123-VIII-EOF REV: 1Page 35 of 62EOF Administrative Leader Checklist Attachment 54.0 CONTINUING ACTIONS4.1 DETERMINE from any ERO Leader whether they are aware of any injuries or fatalities that haveoccurred.
4.1.1 REPORT injuries or fatalities to EC, CED, Operations Leader, Joint Information Center(JIC) Director and Grid Control Center (GCC) per EP(123) EOF-5, Reporting ofAccidents.
4.1.2 NOTIFY emergency contacts per, EP(123) ERO-4, Site and Local Assembly AreaTracking Sheet4.2 REPORT phone problems to Telecommunications Control Center at PAX 51200.4.3 IF conditions exist which require EOF evacuation, THEN ASSIST the EPC with relocation activities to the Alternate EOF at the Irvine Operations Center.4.4 Upon arrival at the Alternate EOF, ASSIST the EPC with the set up and activation.
5.0 SITE AREA EMERGENCY/SITE ASSEMBLYNOTE1. Site Assembly followed by site evacuation is mandatory for all non-emergency response personnel at a Site Area Emergency or higherclassification, unless assembly or evacuation exposes personnel to agreater hazard.2. Site Assembly is mandatory for Camp Mesa during an Alert classification.
- 3. CED will use form EP(123) EOF-17, Guidance for Assembly/Evacuation of Non-Essential Personnel for Assembly and Evacuation.
5.1 COMPLETE EP(1 23) ERO-6, Assembly Area Briefing Script.5.2 COORDINATE with EOF Radiation Protection Leader to identify the following:
5.2.1 Alternate Assembly Area(s) when an assembly area(s) is contaminated or when radiation levels are high near an assembly area.5.2.1.1 CONTACT affected Assembly Area with relocation information.
5.2.1.2 UPDATE EP(123) ERO-4, Site and Local Assembly Area Tracking Sheet, with updatedlocation.
5.2.1.3 Parking lot(s) inaccessible due to radiological or other hazardous conditions.
REFERENCE USEAttachment 5Page 4 of 8 J tI'SO\ SO123-VIII-EOF (3 Emergency Response Organization (ERO) Emergency REV: IS Operations Facility Position Checklists
-soNGs Page 36 of 62EOF Administrative Leader Checklist Attachment 55.3 TRACK activation of Site and Local Assembly Areas EP(1 23) ERO-4, Site and Local AssemblyArea Tracking Sheet.5.4 OBTAIN CED review and approval on Assembly Area Coordinators using EP(123) ERO-6,Assembly Area Briefing Script, forms prior to disseminating information to Assembly Areas. Includethe following:
- Emergency Classification
- Radioactive Release in progress* Application or Removal of NO eating, drinking, or smoking rule0 Parking lot or other areas closed due to radiological or other hazardous conditions
- Evacuation Route direction and need to report to Reception Centers* Other plant information appropriate to the event as directed by CED (i.e., PARs issue, PADsimplemented, actions planned or underway) 5.5 OBTAIN a head count of carpool riders who need transportation from Assembly Area Coordinators.
5.6 COORDINATE with RP and Security Leaders (SL) to obtain a count of vehicles affected by actualor potential parking lot closures given current or forecast radiological and weather conditions.
5.7 ESTIMATE number of 40 passenger buses that may be required using the following calculation:
5.7.1 Buses Required
= (Impacted Vehicles
+ carpool riders who need transportation)
X 0.031255.7.2 Contact number listed in Emergency Response Telephone Directory (ERTD), underTransportation, to request dispatch for needed vehicles.
6.0 SITE EVACUATION 6.1 WHEN a site evacuation has been directed by SED, THEN:6.1.1 OBTAIN direction from EOF RP leader and EOF Security Director for evacuation vianorth, south, or normal departure routes.6.1.2 ENSURE Assembly Area coordinators received PA information AND VERIFY evacuation direction (north, south, or normal departure routes).6.1.3 ENSURE Assembly Area coordinators hold personnel whose transportation isinaccessible until requested transportation arrives.6.1.4 ENSURE Assembly Area coordinators contact Administrative Leader when evacuation iscomplete.
REFERENCE USEAttachment 5Page 5 of 8 J tIPSO SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists soNGS Page 37 of 62EOF Administrative Leader Checklist Attachment 57.0 TURNOVER7.1 CONDUCT turnover with oncoming Administrative Leader per Form EP(1 23) 5.7.2 REPORT completion of turnover to Emergency Planning Coordinator AND RECORD completion ofturnover in Administrative Leader Log.8.0 RECOVERY8.1 WHEN requested by SED, or CED, THEN8.1.1 EVALUATE AND REPORT assessment of spare parts and equipment, site documents, and other administrative areas.8.1.2 RECOMMEND additional personnel and equipment necessary for a RecoveryOrganization.
REFERENCE USEAttachment 5Page 6 of 8 I ......0..SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists A----SONGS Page 38 of 62EOF Administrative Leader Checklist I Attachment 5SUPPLEMENTAL POSITION INSTRUCTION NOTE1. Sections 9.0 through 12.0 provide supplemental instructions for performing the Administrative Leader duties and may be referenced for clarification ofduties.2. Steps may be performed in any order or concurrently.
- 3. The following steps are an enhancement to the position checklist.
Placekeeping is not required.
9.0 ACTIVATION
9.1 REFER to the Emergency Response Telephone Directory (ERTD), located in the Administrative Leader notebook, as a source of phone numbers during declared emergencies.
9.2 REPORT status of Administrative staffing to the Emergency Planning Coordinator (EPC).9.3 PROVIDE supplies for other emergency responders.
9.4 REVIEW the checklist periodically during emergency response and following each reclassification.
10.0 SITE AREA EMERGENCYISITE ASSEMBLY10.1 Continuously UPDATE all EP(123) ERO-6, Assembly Area Briefing Script, forms.11.0 EMERGENCY RESPONSE COORDINATION 11.1.1 Facsimiles received at the EOF may include:* Turnover Status Forms: Deliver to the Corporate Emergency Director or EPC.* Recall Roster: Deliver to the EPC.* Technical Team Data: Deliver to the Technical Leader.12.0 LOGISTICAL SUPPORT12.1 Recall of Additional Personnel 12.1.1 IF ERO Leaders request recall of additional personnel, THEN:12.1.1.1 CONSULT with EOF RP Leader and Security Director to determine safest and mostdirect route to plant.REFERENCE USEAttachment 5Page 7 of 8 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SO123-VIII-EOF REV: 1IPage 39 of 62EOF Administrative Leader Checklist Attachment 512.2 Administrative Support12.2.1 IF emergency response personnel may be required on shift for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, THEN DISCUSSneed for the following with CED or EOF Manager:000Work Hours ControlsOn shift and management personnel recallFood and lodgingREFERENCE USEAttachment 5Page 8 of 8 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 40 of 62IEOF Emergency Planning Coordinator Checklist Attachment 6POSITION CHECKLIST Emergency Planning Coordinator Supplemental Instruction Table of ContentsSectionNumberTitlePage3.04.05.06.07.08.09.010.0ACTIVITIES TO SUPPORT THE EOF DURING A SECURITY-RELATED NOTIFICATION OFUNUSUAL EVENT AFTER ARRIVING AT THE EOF ............................................................
43ACTIVITIES TO SUPPORT THE EOF DURING AN ALERT OR HIGHER CLASSIFICATION
..43M ED IA R ES PO N S E TEA M ....................................................................................................
44NOTIFICATIONS AFTER EC TURNOVER TO CED ..............................................................
44R E P E T IT IV E A C T IO N S ..............................................................................................................
4 4EMERGENCY DIESEL GENERATOR OPERATIONS
..........................................................
45E O F H V A C S Y S T E M ..................................................................................................................
4 5ASSIST WITH THE PLACEMENT OF PERSONNEL DURING A RELOCATION OF TSCA N D /O R O SC TO TH E EO F ..................................................................................................
45NOTE1. Sections 3.0 through 10.0 provide supplemental instructions for performing the Emergency Planning Coordinator duties and may be referenced forclarification of duties.2. Steps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS1.1 REFER to the following contained in position notebook:
- EP (123) 5, Turnover Status" EP (123) 6, Emergency Response Log Book* EP(123) EOF-4, EOF HVAC System1.2 WHEN ready to perform your ERO function, THEN SIGN-IN on the EOF minimum staffing board.1.3 ESTABLISH AND MAINTAIN a log using form EP(123) 6.1.4 UNLOCK all emergency response cabinets and equipment (i.e., desk drawers, YPS cabinet, E-kitsand CDM cabinets).
1.5 REPORT to the CED and review staffing requirements.
1.6 ENSURE leader books are distributed and assist in facility setup.REFERENCE USEAttachment 6Page 1 of 7 J E SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 41 of 62EOF Emergency Planning Coordinator Checklist I Attachment 61.7 ENSURE the FAX clock is synchronized clock to the EOF wall clock (Atomic Clock).1.8 REMIND personnel to check PAX phones for dial tone and the ringer control is turned on.2.0 CONTINUING ACTIONS2.1 Activities to Support the EOF During a Security-Related Notification of Unusual Event after arrivingat the EOF:2.1.1 REMIND personnel to sign-in on the Minimum Staffing Board and to scan their badge onthe EOF card reader in the hall by the Security post.2.1.2 INTERFACE with and provide information relating to the event to the JICDirector/Spokesperson while they are at the site.2.1.3 CALL in additional support to provide information to the JIC Director/Spokesperson whilethey are at the site.2.1.4 TRACK CED briefings (approximately every 30 minutes).
2.2 Activities to Support the EOF During an Alert or Higher Classification:
2.2.1 REMIND personnel to sign-in on the Minimum Staffing Board and to scan their badge onthe EOF card reader in the hall by the Security post.2.2.2 CONTACT JIC for activation times and notify the CED and SRO Briefer (to announceover Ivory Phone).2.3 OBTAIN media response team location, and request Security to send media to that location.
2.4 ENSURE the Emergency
- Advisor, Notifications initiates offsite notifications immediately following changes of emergency class, upgrade in PAR including additional PAZ(s), start or stop of aradiological release.2.5 OBTAIN status of offsite sirens from the Telecom Control Center (TCC) in Irvine (PAX 51200).2.5.1 REVIEW with EOF Manager and advise CED of compensatory actions.2.6 MAKE brief EOF PA announcement following CED briefings (as directed by the CED).2.7 Emergency Diesel Generator Operations:
2.7.1 IF normal power is lost, THEN VERIFY proper emergency diesel generator operation.
2.8 EOF HVAC System: (per Attachment 3)REFERENCE USEAttachment 6Page 2 of 7 I rI~soSO123-VIII-EOFEmergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists A SONGS Page 42 of 62EOF Emergency Planning Coordinator Checklist Attachment 62.8.1 ENSURE EOF HVAC system is in the proper mode.2.9 Assist with the placement of personnel during a relocation of TSC and/or OSC to the EOF.2.9.1 RELOCATE the following position with their counterparts:
" SED/CED" Emergency Advisor Operations/SRO Briefer" TSC Technical Lead/EOF Technical Lead* TSC RP Leader/EOF RP Leader2.9.2 ASSEMBLE remaining TSC staff in E-50, Classroom 11.2.9.3 ASSEMBLE OSC staff in E-50, Learning Center A/B.2.9.4 Additional classrooms may also be utilized.
2.10 IF staffing of the EOF is not progressing as expected, THEN COORDINATE with the SecurityDirector WHEN contacting the ERO staging locations to ensure contact is made and NOTduplicated.
2.10.1 MAKE contact with the ERO Staging locations to determine if there are responders awaiting instruction or assistance in responding to their ERF. The telephone numbersare located in the ERTD.* The north staging location is the CHP Office at San Juan Capistrano.
- The south staging location is the CHP Office at Oceanside.
2.10.2 DETERMINE the amount of SONGS ERP that are at each staging location.
- ENSURE that you have a name of an ERO contact at the staging location ANDMAKE periodic contact with him/her providing status updates.2.10.3 RECORD information acquired from the staging location.
- PROVIDE your telephone number to the staging location contacts.
- PROVIDE information regarding the staging locations to the Security Director.
REFERENCE USEAttachment 6Page 3 of 7 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 43 of 62IEOF Emergency Planning Coordinator Checklist I Attachment 6SUPPLEMENTAL POSITION INSTRUCTION NOTE1. Sections 3.0 through 10.0 provide supplemental instructions for performing the Emergency Planning Coordinator duties and may be referenced forclarification of duties.2. Steps may be performed in any order or concurrently.
- 3. The following steps are an enhancement to the position checklist.
Placekeeping is not required.
3.0 ACTIVITIES TO SUPPORT THE EOF DURING A SECURITY-RELATED NOTIFICATION OFUNUSUAL EVENT AFTER ARRIVING AT THE EOF3.1 REPORT to the CED AND REVIEW staffing requirements.
3.2 UNLOCK all emergency response cabinets and equipment (i.e., desk drawers, YPS cabinet, E-kitsand CDM cabinets).
3.3 ENSURE leader books are distributed AND ASSIST in facility setup.3.4 ENSURE the FAX clock is synchronized to the EOF wall clock (Atomic Clock).3.5 INTERFACE with AND PROVIDE information relating to the event to the JICDirector/Spokesperson while they are at the site.3.6 CALL IN additional support to provide information to the JIC Director/Spokesperson while they areat the site.4.0 ACTIVITIES TO SUPPORT THE EOF DURING AN ALERT OR HIGHER CLASSIFICATION 4.1 REPORT to the CED AND REVIEW staffing requirements.
4.2 REMIND personnel to sign-in on the Minimum Staffing Board and to scan their badge on the EOFcard reader in the hall by the Security office.4.3 UNLOCK all emergency response cabinets and equipment (i.e., desk drawers, YPS cabinet, E-kitsand CDM cabinets).
4.4 ENSURE leader books are distributed AND ASSIST in facility setup.4.5 CONTACT JIC for activation times AND NOTIFY the CED EOF Technical Leader (to announceover Ivory Phone).REFERENCE USEAttachment 6Page 4 of 7 S01S23-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists
)SONGS Page 44 of 62EOF Emergency Planning Coordinator Checklist Attachment 65.0 MEDIA RESPONSE TEAMNOTEPrior to JIC activation, a media response team will report to a near site locationto manage the media that will report to SONGS. The specific location willdepend on the incident and the ability to get to SONGS (i.e., road closures).
5.1 OBTAIN media response team location, AND REQUEST Security to send media to that location.
6.0 NOTIFICATIONS AFTER EC TURNOVER TO CED6.1 ENSURE the EOF Emergency
- Advisor, Notifications is making notifications per S0123-VIII-30.7, Emergency Notifications and time requirements are being met.6.2 ASSIST the EOF Emergency
- Advisor, Notifications with the printed message hand-drafted EventNotification Form (ENF) to ensure sufficient time to meet the 30-minute requirement.
6.3 OBTAIN status of offsite sirens from the Telecom Control Center (TCC) in Irvine (PAX 51200).6.3.1 REVIEW with EOF Manager and advise CED of compensatory actions.7.0 REPETITIVE ACTIONS7.1 ENSURE the CED provides facility briefings about every 30 minutes.7.2 MAKE EOF PA announcements following:
" Event reclassification
- EOF activation
- Turnover of EC duties7.3 ENSURE the proper declaration time and event code are posted on the Plant Status Board.7.4 CONTACT TSC Manager in TSC AND ASK for the top 3 to 4 priorities the TSC is tracking.
7.5 PLACE these top priorities under Onsite Portion of the Priority Status Board.7.6 PLACE additional EOF priorities on the Priority Status Board, as directed by the CED.7.7 OBTAIN offsite siren status from the TCC in Irvine at PAX 51200. REVIEW status with the EOFManager AND ADVISE the CED of any required compensatory actions.7.8 REVIEW this checklist frequently, specifically after emergency class changes.REFERENCE USEAttachment 6Page 5 of 7 S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists Page 45 of 62EOF Emergency Planning Coordinator Checklist Attachment 68.0 EMERGENCY DIESEL GENERATOR OPERATIONS 8.1 IF power is lost and the diesel generator automatically starts, THEN CHECK the diesel for properoperation by:8.1.1 GO TO EOF Security Office (302 Watch).8.1.2 REVIEW the Diesel Generator Remote Control Panel EOFLOO02 for any Alarms ornoticeable problems with the Panel.8.1.3 IF any noticeable problems are found with the Diesel Generator Remote Control PanelEOFLOO02, THEN NOTIFY the CED and Site Support Services of problems.
8.1.4 IF any portion of the panel is in Alarm, THEN NOTIFY the CED and Site SupportServices of Alarms.8.1.5 REQUEST the Security Force person to notify you at PAX 83811 or 83821 if any Alarmscome in on the Diesel Generator Remote Control Panel EOFLOO02.
9.0 EOF HVAC SYSTEM9.1 WHEN requested by the RP Leader, THEN PLACE the EOF HVAC system in either the emergency filtration or isolation mode using EP(123) EOF-4, EOF HVAC System. ASSIST the CED to ensurethat the number of personnel in the controlled ventilation area are maintained within permissible limits as described in EP(123) EOF-4, EOF HVAC System, Section 3 Caution statements.
9.2 ENSURE EOF HVAC system is in the proper mode lAW EP(1 23) EOF-4.10.0 ASSIST WITH THE PLACEMENT OF PERSONNEL DURING A RELOCATION OF TSC AND/OROSC TO THE EOF10.1 RELOCATE the following position with their counterparts:
- SED / CED* Emergency Advisor Operations
/ SRO Briefer* TSC Technical Leader / EOF Technical Leader* TSC RP Leader / EOF RP Leader10.2 ASSEMBLE remaining TSC staff in E-50, Classroom 11.10.3 ASSEMBLE OSC staff in E-50, Learning Center A / B10.4 ADDITIONAL classrooms may also be utilized.
REFERENCE USEAttachment 6Page 6 of 7 SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists Page 46 of 62EOF Emergency Planning Coordinator Checklist Attachment 610.5 IF staffing of the EOF is NOT progressing as expected, THEN COORDINATE with the SecurityDirector when contacting the ERO staging locations to ensure contact is made and NOT duplicated.
10.6 MAKE contact with the ERO Staging locations to determine if there are responders awaitinginstruction or assistance in responding to their ERF. The telephone numbers are located in theERTD." The north staging location is the CHP Office at San Juan Capistrano.
- The south staging location is the CHP Office at Oceanside.
10.7 DETERMINE the amount of SONGS ERP that are at each staging location.
10.7.1 ENSURE that you have a name of an ERO contact at the staging location AND MAKEperiodic contact with him/her providing status updates.10.7.2 RECORD information acquired from the staging location.
10.7.3 PROVIDE your telephone number to the staging location contacts.
10.7.4 PROVIDE information regarding the staging locations to the Security Director.
10.8 Communication with Media Response Team and JIC10.8.1 OBTAIN media response team location from the JIC Communications/Technical Liaison.10.8.2 REQUEST Security to direct media to the media response team near site location or tothe JIC.REFERENCE USEAttachment 6Page 7 of 7 O SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists SONGS Page 47 of 62EOF Radiation Protection Leader Checklist Attachment 7POSITION CHECKLIST NOTESteps may be performed in any order or concurrently.
1.0 INITIAL TASKS1.1 ENSURE the following is contained in position notebook:
- EP (123) 5, Turnover Status* EP (123) 6, Emergency Response Log Book* EP (123) EOF 4, EOF HVAC System" EP(123) EOF-9, Radioactive Release Data For Joint Information Center* EP(1123)
EOF-10, Environmental Sample Log* EP(123) EOF-13, Offsite Field Monitoring Team Briefing/instructions
- EP(123) EOF-14, CDE Thyroid Correction Factor* EP(123) EOF-15, Offsite Field Monitoring Team Data Vs. Raddose-V Plume Data* EP(123) ERO-3, Authorization To Issue Potassium Iodide* EP(123) ERO-9, Response Team Guidelines
- EP(123) OFMT-2, Dosimetry Log" EP(123) OFMT-3, Offsite Field Monitoring Team Survey/Sampling Log1.2 WHEN ready to perform your ERO function, THEN SIGN-IN on the EOF minimum staffing board.1.3 Test PAX phone.1.4 REPORT equipment malfunctions to the EOF Emergency Planning Coordinator orTelecommunications Control Center at PAX 51200.1.5 ESTABLISH AND MAINTAIN a log using form EP (123) 6.1.6 REPORT all radiation monitoring equipment malfunctions to OSC RP Coordinator.
1.7 SET-UP/CHECK air and dose rate monitoring equipment in EOF.1.8 PERFORM surveys in EOF to assess potential exposure to EOF personnel.
1.9 PROVIDE RP support to individuals planning to approach EOF by air or ground.REFERENCE USEAttachment 7Page 1 of 6 SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists Page 48 of 62EOF Radiation Protection Leader Checklist Attachment 71.10 CONTACT TSC RP Leader upon arrival AND CHECK on any abnormal radiological conditions, radiation monitor readings, or radiological release.1.11 ASSIST the EOF Security Director and the EOF Emergency Planning Coordinator with theactivation of the EOF.1.12 ASSIST with PAR development.
1.13 ENSURE Offsite field monitoring teams are dispatched and being controlled in accordance withAttachment 9, EOF Offsite Field Monitoring Team Checklist.
1.13.1 The EOF RP Leader may retain Field Monitoring Team members in the EOF to assist inEOF activities.
2.0 CONTINUING ACTIONS2.1 MAINTAIN communications between the TSC and OSC.( 2.2 CHECK area radiation monitors (e.g., north EOF door, south EOF door, east EOF door and E49Conference Room) for operability and trends at least hourly.2.3 POST source term, radiation levels and weather conditions on EOF Radiation Status Boardperiodically.
2.4 TRACK onsite and offsite field teams by number, location, and dose rate.2.5 As dose rate data is updated, INDICATE an increasing trend with an up arrow and a decreasing trend with a down arrow.2.6 ENSURE one Raddose-V computer is being operated in the SLAVE mode.2.7 Immediately NOTIFY CED, Technical Team Leader, and TSC RP Leader of any changingradiological conditions thought to be significant.
2.8 COMPLETE form EP(123) EOF-9, Radioactive Release Data For Joint Information Center for anychanging radiological conditions.
2.9 Declared General Emergency OR a Radiological Release in Progres2.9.1 IF a radiological release starts or stops, THEN PERFORM the following:
2.9.1.1 NOTIFY the CED of the start or stop of any radiological release and the applicable start/stop times.2.9.1.2 NOTIFY the EOF Emergency Advisor Notifications of the start or stop of a radiological release and the applicable start/stop times.REFERENCE USEAttachment 7Page 2 of 6 J I I),SO\ SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists SONGS Page 49 of 62EOF Radiation Protection Leader Checklist Attachment 72.9.1.3 MAKE an announcement in the EOF of the start/stop of the radiological releaseincluding applicable time.2.9.2 CONSIDER requesting EPC to place EOF HVAC into Emergency Filtration Mode.2.9.3 CHECK the 15-minute average "from" wind speed every 15-minutes for possible impacton the EOF and PAR upgrade.2.9.4 IF conditions require surveys of EOF, THEN PERFORM surveys of EOF are beingperformed every 30 minutes or more often.2.9.5 Until surveys are performed showing NO radiological contamination, THEN CONSIDERprohibiting eating and drinking in the EOF.2.9.6 ENSURE Offsite field monitoring teams briefing/review of offsite field team monitoring information is performed with ODAC.2.9.7 REQUEST radiological information from onsite and offsite field monitoring teams.3.0 CHEMICAL OR GASEOUS RELEASE3.1 IF a chemical or gaseous release is in progress AND IF the wind direction "from" is 135 degrees to"from" 165 degrees, THEN CONSIDER requesting EPC to place EOF HVAC in Isolation Mode.4.0 EOF DOSIMETER ISSUE4.1 ENSURE personnel who may receive exposures in excess of 10 CFR 20 limits have authorization from EC/SED.4.2 MAINTAIN a hard copy exposure and dose-tracking
- records, form EP(123) OFMT-2, Dosimetry Log, for all personnel assigned to EOF.4.3 ENSURE SRDs are issued when dose rates reach 2.5 mR/hr in EOF.5.0 MONITORING COORDINATION 5.1 PREPARE Offsite Field Monitoring Team briefing lAW EP(123)-EOF-13 (Offsite Field Monitoring Team Briefing/Instructions) and Offsite Field Monitoring Team Briefing Guidelines (pages 5 and 6 ofthis attachment).
5.1.1 COORDINATE placement of Field Monitoring Teams with Offsite Dose Assessment Center (ODAC), as time and circumstances permit.5.2 PERFORM a briefing to the Field Monitoring Team(s) IAW form EP(123) EOF-13 (Offsite FieldMonitoring Team Briefing/Instructions).
5.3 PERFORM communication checks with the Field Monitoring Team hand held portable radios.REFERENCE USE Attachment 7 Page 3 of 6 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 50 of 62EOF Radiation Protection Leader Checklist I Attachment 75.4 STAY in communications with AND DIRECT the Onsite and Offsite Field Monitoring Team(s).5.5 During the recovery phase RECORD field monitoring survey and sampling data onEP(123) EOF-10, Environmental Sample Log.5.6 PERFORM appropriate calculations using field monitoring survey and sampling data lAWS0123-VIII-40.300, form EP(123) EOF-10, Environmental Sample Log, and EP(123) EOF-14,CDE Thyroid Correction Factor, as time permits.5.7 RECORD Offsite Field Monitoring Team locations and survey data on appropriate map.5.8 SHARE field monitoring data with ODAC representative.
REFERENCE USEAttachment 7Page 4 of 6
SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists A- SONGS Page 51 of 62EOF Radiation Protection Leader Checklist Attachment 7OFFSITE FIELD MONITORING TEAM BRIEFING GUIDELINES 1.0 ACTIONS1.1 Radio Protocol1.1.1 ENSURE radio protocol is conducted in the following manner:1.1.1.1 USE of 3-way communications (REPEAT BACKS).1.1.1.2 USE of the phonetic alphabet.
1.1.1.3 Do NOT USE slang or profanity.
1.1.1.4 LIMIT use of acronyms and abbreviations.
1.2 ENSURE the Radiation Protection Leader has a cell phone number for the Offsite Field Monitoring Team(s).1.3 Potassium Iodide (KI)1.3.1 IF member(s) of the Offsite Field Monitoring Team(s) is allergic or believes he/she maybe allergic to KI, THEN CONSIDER possible reassignment of individual.
1.3.2 IF the Offsite Field Monitoring Team have been or will be exposed to a Thyroid CDE inexcess of 25 rem, THEN REFER to AND SIGN EP(123) ERO-3, Authorization To IssuePotassium Iodide in preparation of taking KI.1.4 Meteorological Conditions 1.4.1 OBTAIN AND PROVIDE current and forecast meteorological information to Offsite FieldMonitoring Team(s) including the following:
- Wind direction(s) and map areas (Sectors) that are or may be impacted* Wind Speed" Precipitation 1.5 Hazards1.5.1 ENSURE any current road hazards that are known are included in the briefing such as:* Flooded Roads* Closed Roads* Traffic Accidents REFERENCE USEAttachment 7Page 5 of 6 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 52 of 62EOF Radiation Protection Leader Checklist Attachment 71.5.2 EMPHASIZE that personnel safety is a higher priority than obtaining surveys and/orsamples.1.5.2.1 IF it is NOT safe to survey/sample from the requested location due to traffic,surroundings, etc, THEN RELOCATE to an area close to the original requested survey/sampling location AND BEGIN survey/sampling.
REFERENCE USEAttachment 7Page 6 of 6 I 501 23-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1IOperations Facility Position Checklists SONGS Page 53 of 62EOF Emergency
- Advisor, Notifications Checklist Attachment 8POSITION CHECKLIST NOTESteps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS1.1 ENSURE the following is contained in position notebook:
- EP(123) 6, Emergency Response Log Book* EP(123) 10, Event Notification Form* EP(123) 11, Verbal Notification Form1.2 VERIFY YPS equipment is ready for use.1.2.1 VERIFY the YPS is operational by calling at least one other Emergency ResponseFacilities (TSC 37, EOF 35, CR 38).1.2.2 VERIFY fax clock is set to facility clock. (The Pacific Time Zone at http://www.time.gov can be used as a backup, JAVA animation may need to be disabled.)
1.2.3 TEST fax transmission of YPS and backup fax.1.2.4 CHECK paper supply to ensure there is enough paper.1.3 IF YPS equipment is not working properly, THEN CONTACT Telecommunications Control Centerat PAX 51200.1.4 ESTABLISH AND MAINTAIN a log of all decisions and actions required by EPIPs, AND IDENTIFYitems requiring feedback.
1.5 SIGN-ON to the Staffing Board.1.6 OBTAIN emergency status from status boards and ERO leaders and previous ENF/VNFs for theevent.1.7 MAINTAIN the Notification Status Board.1.8 MONITOR the Yellow Phone using the orator.1.9 IF transfer of EC duties to Corporate Emergency Director (CED) has occurred, THEN ASSUMEresponsibility for notifications AND CONTACT TSC EAN to confirm transfer of duties.REFERENCE USEAttachment 8Page 1 of 5 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 54 of 62IEOF Emergency
- Advisor, Notifications Checklist Attachment 81.10 WHEN the SED conducts turnover of EC functions to the EOF, THEN REVIEW the status ofnotifications with the TSC EA, Notifications to determine which facility should complete thenotifications.
1.11 COMPLETE Form EP(123) 11, Verbal Notification, based on Event declaration, PAR upgrade, startor stop of radiological
- release, activation of the EOF/Alternate EOF, and follow-up or close outmessage requirements.
2.0 CONTINUING ACTIONS2.1 VERIFY notifications are initiated as soon as possible and NO later than the times indicated below(event declaration/reclassification, PAR upgrade, start or stop of radiological release sets EDTtime 0):NOTIFICATION TIME LIMITSTIME LIMIT NOTIFICATION RESPONSIBILITY EDT + 15 minutes EP(123) 11, Verbal to Local & EANStateAs soon as possible but Red Phone verbal to NRC OPSwithin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of EDTEDT + 30 minutes EP(123) 10, ENF to Local & State EANEDT + 90 minutes and every EP(123) 10, ENF Follow-up EAN60 minutes thereafter (EDT = Event Declaration Time)2.2 COMPLETE Form EP(1 23) 11, Verbal Notification form (VNF), based on Event declaration, PARupgrade, start or stop of radiological release and follow-up or close out message requirements (stepmay be repeated to facilitate completing new forms).(O2.2.115-Minute Verbal Notification.
2.2.1.1 PREPARE Form EP(123) 11, Verbal Notification Form (VNF).2.2.1.2 OBTAIN Verbal Notification independent Verification from EOF Manager and approvalinitials from the EC.2.2.1.3 PERFORM Blue Phone verbal notification.
2.2.1.4 PERFORM YPS verbal notification lAW S0123-VIII-30.7, Emergency Notifications.
2.2.1.5 REPORT verbal notification status to the EC AND UPDATE notification board withactual times of notification.
REFERENCE USEAttachment 8Page 2 of 5 SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists Page 55 of 62JEOF Emergency
- Advisor, Notifications Checklist Attachment 82.2.22.2.2.12.2.2.22.2.2.32.2.2.42.2.2.52.2.2.62.2.2.72.2.32.2.3.12.2.3.22.2.3.32.2.3.42.2.3.52.2.3.62.2.3.72.2.3.82.2.3.92.2.42.2.4.12.2.4.22.2.4.32.2.4.430-Minute Printed Message.ENTER AND PRINT Event Notification Form (ENF), EP(123) 10.OBTAIN EC approval on both forms.FAX ENF to all YPS stations by pressing the BATCH TX key followed by the START keyon the dedicated FAX Machine.FAX ENF to the California Office of Emergency Services (CAL OES).RECORD Fax start time on VNF, Section 6.0.FAX completed VNF to TSC and/or EOF (ref ERTD).RECORD printed message status on the Notification Board.Follow-Up Notification PREPARE VNF (Sections 2 and 5 only).ENTER AND PRINT ENF.OBTAIN EC approval on both forms.PERFORM blue and yellow phone verbal notification using VNF Sections 2 and 5.FAX ENF to all YPS stations by pressing the BATCH TX key followed by the START keyon the dedicated FAX Machine.FAX ENF to the California Office of Emergency Services (CAL OES).RECORD completion time on VNF, Section 6.0.FAX completed VNF to TSC.RECORD message status on the Notification Board.Close-out Notifications.
PREPARE VNF (Sections 2 and 5 only).ENTER AND PRINT ENF.OBTAIN EC approval on both forms.PERFORM blue and yellow phone verbal notification using VNF Sections 2 and 5.REFERENCE USEAttachment 8Page 3 of 5 SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1Operations Facility Position Checklists Page 56 of 62EOF Emergency
- Advisor, Notifications Checklist Attachment 82.2.4.5 FAX ENF to all YPS stations by pressing the BATCH TX key followed by the START keyon the dedicated FAX Machine.2.2.4.6 FAX ENF to the California Office of Emergency Services (CAL OES).2.2.4.7 RECORD completion time on VNF, Section 6.0.2.2.4.8 FAX completed VNF to TSC and/or EOF.2.2.4.9 RECORD printed message status on the Notification Board.2.3 Administrative Actions.2.3.1 DELIVER one copy of printed message to EOF Administrative Leader for distribution.
3.0 YELLOW PHONE SYSTEM PROBLEMS3.1 IF there are YPS system problems, THEN CONTACT Telecom Control Center (TCC) atPAX 51200.3.2 IF nearest YPS is not working or is inaccessible (i.e., equipment malfunction or uninhabitable atmosphere),
THEN emergency notifications could be completed using the YPS at otherEmergency Response Facilities, or from a safe location using the alternate telephone and faxnumbers.3.2.1 REFER to Verbal Notification Form. EP(123)11 for CAL OES alternate number. (REFER3.3to ERTD for Yellow Phone alternate numbers.)
IF Yellow Phone Voice Circuit is completely inoperable, THEN:3.3.1 Using the alternate number found in the ERTD, CONTACT Orange County (Station 27),3.3.1.1 READ the VNF information AND3.3.1.2 INFORM them the Yellow Phone is inoperable.
3.3.1.3 REQUEST Orange County relay the information to the cities of Dana Point, San JuanCapistrano and San Clemente.
3.3.2 INFORM the jurisdictions that further updates will be through the Yellow Phone BridgeLine (949-368-3800, access code 0852).3.3.3 Using the alternate number found in the ERTD; CONTACT the San Diego County EOC(Station 46), USMC Command Center (Station 23), State Parks Dispatch (Station 29),Edison Generation Operations (Station 42).REFERENCE USEAttachment 8Page 4 of 5 SO123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists
., Page 57 of 62EOF Emergency
- Advisor, Notifications Checklist Attachment 83.3.3.1 READ the VNF information AND, INFORM them the Yellow Phone is inoperable.
3.3.3.2 INFORM the jurisdictions that further updates will be through the Yellow Phone BridgeLine (949-368-3800, access code 0852).3.3.3.3 INFORM the jurisdictions that further updates will be through the Yellow Phone BridgeLine (949-368-3800, access code 0852).3.3.4 REPORT all phone problems to EOF Telecom Supervisor, facility EPC or TSC Manager.3.3.5 IF all stations report no message receipt, THEN FAX printed message from another faxmachine.NOTEThe following steps will tie an outside phone call directly into YPS. The stationmust maintain an open line.3.4 IF a YPS voice circuit fails, THEN CONTACT affected station AND DIRECT them to dial(949) 368-3880 followed by Access Code 0852 to connect to YPS verbal circuit.3.4.1 IF more than three backup lines are needed, THEN CONTACT affected station ANDDIRECT them to dial (949) 368-3800 followed by Access Code 0852 to YPS verbalcircuit.3.4.2 Immediately INFORM Telecommunications Control Center at PAX 51200 of circuitproblem.REFERENCE USEAttachment 8Page 5 of 5 J E~iSON 01 23-VIII-EOF Emergency Response Organization (ERO) Emergency REV: 1IOperations Facility Position Checklists SI O NsGS Page 58 of 62EOF Offsite Field Monitoring Team Checklist I Attachment 9POSITION CHECKLIST NOTESteps may be performed in any order or concurrently.
1.0 INITIAL ACTIONS1.1 SIGN-IN on the EOF Position Sign-In Board.1.2 ENSURE the following is contained in position notebook:
- EP(123) OFMT-1, Offsite Field Monitoring Team Equipment Inventory Checklist
- EP(123) OFMT-2, Dosimetry Log* EP(123) OFMT-3, Offsite Field Monitoring Team Survey/Sampling Log1.3 REPORT to EOF Radiation Protection (RP) Leader.1.4 OBTAIN the Offsite Emergency Vehicle keys, room key, and Ekit key located in EOF key lock box.1.5 The Offsite Field Monitoring Team (Monitor and/or Driver) PERFORM the following:
1.5.1 IF the seal on Cabinet Door 1 is intact, THEN Portable Action Kits (Black Cloth BriefCase) do NOT have to be inventoried prior to use.1.5.2 IF the seal on Cabinet Door 1 is NOT intact, THEN INVENTORY the Portable Action Kits(PAKs) prior to use, using EP(123) OFMT-1, Offsite Field Monitoring Team Equipment Inventory Checklist.
1.6 PERFORM a response check on all count and dose rate instruments.
1.7 PERFORM Radio and/or cell phone checks.1.8 READ AND ENSURE you understand form EP(123) ERO-3 concerning the issuing of Potassium Iodide (KI).1.9 NOTIFY the RP Leader if after reading form EP(123) ERO-3, you do NOT believe you can ingestKI.1.10 ZERO dosimetry (self-reading or electronic).
1.11 COMPLETE dosimetry information form EP(123) OFMT-2, Dosimetry Log.1.12 GIVE completed EP(123) OFMT-2, Dosimetry Log to EOF RP Leader.REFERENCE USEAttachment 9Page 1 of 3 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 59 of 62EOF Offsite Field Monitoring Team Checklist I Attachment 91.13 RECEIVE a briefing from EOF RP Leader prior to leaving the EOF to perform survey and samplingduties.1.14 LOAD equipment into Offsite Field Monitoring vehicle.NOTEProvide input to RP Leader due to changing conditions for the following items:* Where to survey and sample* To move to other survey/sampling locations
- Any observed changing radiological and/or meteorological conditions Report any transportation or safety concerns.
2.0 IN FIELD ACTIONS2.1 The Offsite Field Monitoring Team (Monitor)
PERFORM the following:
2.1.1 MAINTAIN contact with the Radiation Protection Leader at least every 15 minutes.2.1.2 MONITOR dose rates and check dosimetry upon entering what is thought to be theradiological plume every 5 minutes.NOTEAir Samples should be taken for a total of 48 liters, which is 12 minutes for thedefault setting for Air Samplers used (running at 4LPM).2.1.3 TAKE Air Samples as requested by RP Leader.2.1.4 USE proper contamination controls to prevent cross contamination of samples,instruments, or other equipment.
2.1.5 ENSURE all appropriate survey and sampling information is recorded onEP(123) OFMT-3, Offsite Field Monitoring Team Survey/Sampling Log.2.1.6 TRANSMIT all sample data recorded on EP(123) OFMT-3 to RP Leader.2.1.7 IF the dose rate of a sample is greater than 5 mR/hr at 30 centimeters, THEN STORE thesample in back corner of the vehicle.REFERENCE USEAttachment 9Page 2 of 3 Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists S0123-VIII-EOF REV: 1Page 60 of 62IEOF Offsite Field Monitoring Team Checklist Attachment 9NOTELow level contamination (background to 5,000 cpm above background by directsurvey) of Offsite Field Team personnel or vehicle is NOT a reason for havingthem return to the EOF for decontamination.
2.2 PERFORM a cursory survey of all Offsite Field Monitoring Team members, equipment, and vehicleafter exiting what was thought to be the radiological plume and when asked to return to the EOF.2.2.1 REPORT back results to EOF Radiation Protection Leader.2.2.2 Upon arrival at the EOF, REMAIN in vehicle until directed otherwise.
3.0 POST JOB-DEBRIEFINGITURNOVER 3.1 PROVIDE a post job briefing to the EOF RP Leader and the oncoming Offsite Field Monitoring Team(s),
if available, concerning appropriate issues:" Safety* Traffic* Gasoline Level" Vehicle Contamination
- Equipment Contamination
- Vehicle Problems" Equipment Problems* Radiological status4.0 REPLENISH SUPPLIES4.1 PERFORM the following at the end of actual event or drill/exercise:
4.1.1 PERFORM an inventory of the PAKs using EP(123) OFMT-1, Offsite Field Monitoring Equipment Inventory, AND REPLACE any needed supplies or equipment.
REFERENCE USEAttachment 9Page 3 of 3 S0123-VIII-EOF Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists rage 6 I 1 oL 6Summary of Changes Attachment 10Author: Genschaw/Remick/'Schmitt
'4" 4~r ~Step eti6n WDescription~s 6049. tl tooOther~"
7 .fCag~2 R eer ) *. ,~~etpComments Remove items not contained in CED position Attachment 1Notebook.
Step 1.1Add Note to ensure direct/timely communication with Jump Ate aOA.Sholler D ANtetachet1 ODAC. Genschaw DNA pNote1aCleavenger Step 1.16Revise Network User ID to receive JIC press Attachment 2releases.
Step 1.4202557982 Delete establishment of Brown Phone Attachment 3communication with TSC. Step1.4Delete Control Room decision making monitoring.
Attachment 3Step 1.6Revise terminology from update to inform for current Attachment 3plant conditions.
Step 1.7Delete steps that are performed by EAN. Attachment 3Jump Steps 1.10.1Sholler D and 1.10.2Genschaw DNDelete plant conditions not applicable to Spent Fuel Ceavenge Attachment 3Pool. Cleavenger Step 2.1Delete step to print non-existent CFMS parameter Attachment 3information.
Step 2.2Move information to be provided via Ivory Phone Attachment 3(Changes in PARs and Major decisions made by Step 2.2CED) from Initial Actions to Continuing Actions.Move participation in facility staff briefings from Attachment 3Initial Actions to Continuing Actions.
Step 2.5INFORMATION USEAttachment 10Page 1 of 2 4106- A 'R'KIý S0123-VIII-EOF c k 16._ Emergency Response Organization (ERO) Emergency REV: IOperations Facility Position Checklists soNGs Page 62 of 62Smayof Changes Attachment 10Comments Revised Administrative Leader Checklist as follows:Attachment 5" Added TSC as area to provide support." Combined all steps regarding performance ofrecall or shift relief and moved to Section 2.4 forclarity of sequence timing." Add step to consult EPC with questions.
" Moved Step regarding receipt of bomb threat toSection 1.0" Moved Steps in Section 2.1 for clarity of timingof sequence.
" Clarified CDM Support contact information.
- Removed step regarding Facsimile Instructions.
" Removed steps regarding centralized phonefunction.
- Revised step regarding determination of injuryor fatality information for clarity." Revised step regarding phone problems to allowfor generic phone issues." Add Note in Section 5.0 to alert Admin Leader ofSite Assembly for Camp Mesa requirement.
" Add Note in Section 5.0 for CED's use ofEP(123) EOF-17." Moved Steps in Section 5.0 for clarity of timingsequence.
" Add Step to ensure Assembly Area coordinators contact Admin Leader of evacuation completion.
" Delete duplicate steps and section fromSupplemental Position Instruction section.JumpShollerGenschawCleavenger DNA" Step 1.6.4" Section 2.4" Step 1.7" Step 1.8" Section 2.1* Step 2.2.1" Step 2.3.1" Section 3.0" Step 4.1* Step 4.2" Note 2" Note 3* Section 5.0" Step 6.1.4" Section 9.0thru 12.0Attachment 7Step 1.13.1Throughout.
Add step to allow RP Leader to effectively useexisting personnel resources.
Correct typos and spelling errors.INFORMATION USEAttachment 10Page 2 of 2 Attachment 2SONGS EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIPs) INDEX SONGS EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIPs) INDEXDOCUMENT REV. # EC TITLESO123-VIII-0.100 17 MAINTENANCE AND CONTROL OFEMERGENCY PLANNING DOCUMENTS SO123-VIII-0.101 0 EMERGENCY RESPONSE EQUIPMENT MANAGEMENT SO123-VIII-0.200 17 EMERGENCY PLAN DRILLS ANDEXERCISES SO123-VIII-0.201 27 EMERGENCY PLAN EQUIPMENT SURVEILLANCE PROGRAM (EPESP)S0123-VIII-0.202 11 1 ASSIGNMENT OF EMERGENCY RESPONSEPERSONNEL SO123-VIII-0.301 16 EMERGENCY TELECOMMUNICATIONS TESTINGS0123-VIII-0.302 7 ONSITE EMERGENCY SIREN SYSTEM TESTS0123-VIII-0.303 5 PERIMETER PUBLIC ADDRESS SYSTEM(PPAS) ROUTINE TESTSO123-VIII-1 37 RECOGNITION AND CLASSIFICATION OFEMERGENCIES SO123-VIII-10 32 1 EMERGENCY COORDINATOR DUTIESSO123-VII1-10.3 16 PROTECTIVE ACTION RECOMMENDATIONS SO123-VIII-10.5 5 EVENT CLOSE OUT AND RECOVERYSO123-VIII-10.6 SO123-VIII-30.7 S0123-VII1-40.100 SO123-VIII-40.200 S023-VI 11-50.3SO123-VIII-CR 717197110EMERGENCY RESPONSE ACTIONS FOR ADECLARED SECURITY EVENTEMERGENCY NOTIFICATIONS DOSE ASSESSMENT RADDOSE-V DOSE ASSESSMENT CORE DAMAGE ASSESSMENT EMERGENCY RESPONSE ORGANIZATION (ERO) CONTROL ROOM POSITIONCHECKLISTS 1
SONGS EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIPs) INDEXDOCUMENTS0123-VIII-EOF Sa123-VIII-JIC Sa123-VIII-OSC SO123-VIII-TSC REV. #1000EC TITLEEMERGENCY RESPONSE ORGANIZATION (ERO) EMERGENCY OPERATIONS FACILITYPOSITION CHECKLISTS EMERGENCY RESPONSE ORGANIZATION (ERO) JOINT INFORMATION CENTER (JIC)POSITION CHECKLIST EMERGENCY RESPONSE ORGANIZATION (ERO) OPERATIONS SUPPORT CENTERPOSITION CHECKLISTS EMERGENCY RESPONSE ORGANIZATION (ERO) TECHNICAL SUPPORT CENTERPOSITION CHECKLISTS Attachment 3SONGS EMERGENCY PLAN REFERENCED MANUALS,ORDERS AND TRAINING PROCEDURES INDEX SONGS EMERGENCY PLAN REFERENCED MANUALS,ORDERS AND TRAINING PROCEDURES INDEXDOCUMENTS0123-EP-1 REV. #TITLE9S0123-XXI-1.11.3 29SONGS EMERGENCY PLANIMPLEMENTATION EMERGENCY PLAN TRAININGPROGRAM DESCRIPTION EMERGENCY ACTION LEVELTECHNICAL BASESSECTION 1.0 -PURPOSEEPSD-1EPSD-1 1.0EPSD-1 2.0EPSD-1 3.0EPSD-1 4.0EPSD-1 5.0EPSD-1 5.16233524EPSD-1 5.24SECTION 2.0 -DISCUSSION SECTION 3.0 -REFERENCES SECTION 4.0 -DEFINITIONS, ACRONYMSAND ABBREVIATIONS SECTION 5.0 -EAL TECHNICAL BASESSECTION 5.1 -CATEGORY A -ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENTSECTION 5.2 -CATEGORY C -COLDSHUTDOWN
/ REFUELING SYSTEMMALFUNCTION SECTION 5.3 -CATEGORY E -EVENTSRELATED TO INDEPENDENT SPENTFUEL STORAGE INSTALLATIONS SECTION 5.4 -CATEGORY F -FISSIONPRODUCT BARRIER DEGRADATION SECTION 5.5 -CATEGORY H -HAZARDSAND OTHER CONDITIONS AFFECTING PLANT SAFETYSECTION 5.6 -CATEGORY S -SYSTEMMALFUNCTION EPSD-1 5.33EPSD-1 5.4EPSD-1 5.555EPSD-1 5.66 Attachment 4Report and Analysis Summary
Reference:
S0123-VIII-0.100 San Onofre Nuclear Generating StationReport and Analysis Summary10 CFR 50.54(q)(iv)(5)
Document Number: 501 23-VIII-40.100 Rev. 19Title: Dose Assessment SONGS Nuclear Notification (NN) 202596380-1 Section and Change Description Analysis SummaryChange 1Throughout procedure added additional guidance onsource term calculation.
Change 2Added additional guidance on source termassessment from field readings to Section 6.3 andAttachment 1.The following information identifies the technical basis foroptimizing the procedure;
- Nuclear fuel has been permanently offloaded on both unitsand SONGS is no longer authorized to replace fuel in eitherreactor.* Following the termination of reactor operations at SONGSand the permanent removal of the fuel from the reactorvessel, classifiable events involving the reactor coolantsystem (RCS) or secondary system are no longer possible.
Additionally, APPENDIX 15G of the SONGS Final Safety AnalysisReport (FSAR) was recently revised and identifies the following postulated accidents that are applicable in a permanently defuelcondition:
-Fuel handling accident inside the fuel handling building (FHA-FHB)-Spent fuel cask drop accident-Spent fuel pool boiling-Waste gas system failure (release to atmosphere)
-Radioactive liquid waste system leak or failure (release toatmosphere)
Additionally 15G identifies that for all following postulated accidents iodine releases are not applicable twenty months after reactoroperation.
Based on the above, the remaining credible release scenarios involve a release from a Fuel Handling
- Building, and anunmonitored release.
The revisions to the procedure improve theability of the SONGS Emergency Response Organization to assessand accurately calculate the impact of radiological releases.
This assessment determines that the changes noted in theSummary of Changes do not decrease the effectiveness of theEmeraencv Plan.PREPARED BY: Richard Garcia REVIEWED BY: Dan Cleavenger DATE: 9/30/13 DATE: 10/6/13Refer to S0123-XV-109.1, Processing Procedures and Instructions for the types of allowed editorial corrections.
EP(123)26 RevO 09/12Page 1 of 1
Reference:
S0123-VIII-0.100 San Onofre Nuclear Generating StationReport and Analysis Summary10 CFR 50.54(q)(iv)(5)
Document Number: S01123-VIII-40.200 Revision 7Title: RADDOSE-V Dose Assessment SONGS Nuclear Notification (NN) 202596380-4 Section and Change Description Analysis SummaryChange 1Throughout procedure removed references to SGTR,LOCA, and Thyroid dose as they are no longerapplicable at SONGS.Change 2Throughout procedure added additional guidance onentering Iodine release rates as Iodine releases areno longer possible at SONGS.The following information identifies the technical basis foroptimizing the procedure;
- Nuclear fuel has been permanently offloaded on both unitsand SONGS is no longer authorized to replace fuel in eitherreactor." Following the termination of reactor operations at SONGSand the permanent removal of the fuel from the reactorvessel, classifiable events involving the reactor coolantsystem (RCS) or secondary system are no longer possible.
Additionally, APPENDIX 15G of the SONGS Final Safety AnalysisReport (FSAR) was recently revised and identifies the following postulated accidents that are applicable in a permanently defuelcondition:
-Fuel handling accident inside the fuel handling building (FHA-FHB)-Spent fuel cask drop accident-Spent fuel pool boiling-Waste gas system failure (release to atmosphere)
-Radioactive liquid waste system leak or failure (release toatmosphere)
Additionally 15G identifies that for all following postulated accidents iodine releases are not applicable twenty months after reactoroperation.
Based on the above, the remaining credible release scenarios involve a release from a Fuel Handling
- Building, and anunmonitored release.
The revisions to the procedure improve theability of the SONGS Emergency Response Organization to assessand accurately calculate the impact of radiological releases.
This assessment determines that the changes noted in theSummary of Changes do not decrease the effectiveness of theEmerqency Plan.PREPARED BY: Richard Garcia REVIEWED BY: Dan Cleavenger DATE: 9/30/13 DATE: 10/06/13Refer to S0123-XV-109.1, Processing Procedures and Instructions for the types of allowed editorial corrections.
EP(123)26 Rev0 09/12Page 1 of 1
Reference:
S0123-VIII-0.100 San Onofre Nuclear Generating StationReport and Analysis Summary10 CFR 50.54(q)(iv)(5)
Document Number: S01123-VIII-0.200 Revision 17Title: Emergency Plan Drills and Exercises SONGS Nuclear Notification (NN) #: 202405588-8 Section and Change Description Analysis SummarySection 1Deleted reference to S0123-VIll-0.401, Emergency Preparedness Performance Indicators Added reference to S01 23-VIII-0.21 0, Emergency Planning DrillObjectives and Demonstration CriteriaSection 2Updated revision date for FEMA REP ManualSection 5Renamed section from Checklists to Responsibilities Added responsibilities for:Manager, Emergency Preparedness Planning (EPM):Manager, Safety, Human Performance and Performance Improvement Site Management teamDrill/Exercise Coordinator Scenario Development TeamEmergency Planning Department staffSection 6.1Combined the following Steps into new Section 6.1 EPDrill/Exercise Schedule6.1.1 Exercise Scheduling 6.1.2 Drill Scheduling 6.1.3 Simulator Activity Scheduling Section 6.2Moved Step 6.2.1 Objectives into new Section 6.2 SELECTION OF DRILL/EXERCISE OBJECTIVES Step 6.2.5Combined Steps 6.2.1.1 through 6.2.1.14 for filling outAttachment 2 into one step (6.2.5) to update Attachment 2.Section 6.3Moved Step 6.2.2 Scenario Development into new Section 6.3SCENARIO DEVELOPMENT Step 6.3.1Added section to describe acceptable drill/exercise scenarios Step 6.3.4Added requirement to assemble a Scenario Development TeamSection 6.4During the 2013 INPO EP Review, the team presented aRecommendation for Improvement for weaknesses indrill preparation resulted in an inadequate drill scenarioand controller performance issues. It was noted thatthese weaknesses may adversely impact the ERO'sability to respond to real events and also adversely impact Emergency Planning's ability to accurately assess gaps in ERO performance.
The changes to Revision 17 of S0123-VIII-0.200, Emergency Plans Drills and Exercises wereimplemented as a result of the findings by the 2013INPO EP Review team.A review of the revised document indicates that noinformation contained in the previous revision wasdeleted from the procedure.
As noted in the Summaryof Changes the revision moved sections of theprocedure to other locations for better understanding and clarity.
The revision also added additional information that better assists the Emergency Planningorganization in conducting drills and exercises.
This revision complies with the requirements of1OCFR50 Appendix E, 1OCFR50.47b, NUREG 0654 anddoes not reduce the effectiveness of the SONGSEmergency Plan.EP(123) 26 Rev 0 09/12 Page 1 of 3EP(123)26 RevO 09/12Page 1 of 3 Moved scenario condition and events instructions from Step6.2.2.5 to Section6.4, SCENARIO PACKAGEDeleted Step 6.2.7 as each controller receives a full scenariopackage as described in Section6.4, SCENARIO PACKAGEStep 6.4.1Guidelines for Drill/Exercise Conduct moved from Step 6.2.2.5.5 into Step 6.4.1 and Attachments:
10 Controller
/ Evaluator Guidelines 11 Observer Guidelines 13 Participant BriefingMoved instructions from Step 6.2.2.5.6 through 6.2.2.5.7 to Step6.4.1Moved instructions from Step 6.2.2.5.8 to Step 6.4.1 andAttachment 3Section 6.6Deleted Steps 6.2.11 through 6.2.15 and moved the instructions to Section 6.6, CONDUCT OF DRILLS AND EXERCISES Section 6.7Deleted Steps 6.2.16 through 6.2.20 and moved the instructions to Section 6.7, Drill and Exercise Evaluation Moved instructions from Section 6.4 Corrective Actions/Event Trending to Section 6.7, Drill and Exercise Evaluation Attachment 3New Attachment describing Scenario Development TeamprocessMoved instructions from Step 6.2.3.1 through 6.2.3.4 intoAttachment 3, SCENARIODEVELOPMENT TEAM AND RESPONSIBILITIES Attachment 4New Attachment providing a Drill Planning Checklist Deleted Step 6.2.2.4 as this information is captured inAttachment 4, Drill Planning Checklist Step 6.2.9, Notifications and Announcements deleted as theinstructions are provided inAttachment 4, Drill Planning Checklist Attachment 5 New Attachment providing aCONTROLLER/EVALUATOR ORGANIZATION instructions Moved Steps 6.2.4 Controller Organization and 6.2.5 Controller Requirements/Assignments, into Attachment 5,CONTROLLER/EVALUATOR ORGANIZATION Attachment 6Added new attachment providincq DRILL PREPARATION EP(123)26 RevO 09/12 Page 2 of 3W yEP(123)26 RevO 09/12Page 2 of 3 FLOWCHART Attachment 7Added new attachment providing EXERCISE PREPARATION FLOWCHART Attachment 8Added CONTROLLER AND EVALUATOR BRIEFINGinstructions Attachment 9Added new attachment providing CONTROLLER TRAININGguidelines Moved Step 6.2.6, Controller training into Attachment 9CONTROLLER TRAININGAttachment 10Added new attachment providing CONTROLLER/EVALUATOR guidelines Attachment 11Added new attachment providing OBSERVER guidelines Attachment 12Added new attachment providing an exampleSECURITY/CONFIDENTIALITY AGREEMENT Attachment 13Added PARTICIPANT BRIEFING instructions Attachment 14Added attachment providing a DRILL REPORT templateMoved instructions from Section 6.5, Written Critique Report toAttachment 15, DRILL REPORTAttachment 15Added new attachment for EAL TRACKINGAttachment 16Added new attachment providing DEFINITIONS Attachment 17Renumbered old Attachment 3PREPARED BY: Richard Garcia REVIEWED BY: Dan Cleavenger DATE: 10/1/13 DATE: 10/28/13Refer to SO123-XV-109.1, Processing Procedures and Instructions for the types of allowed editorial corrections.
EP(123)26 RevO 09/12Page 3 of 3
Reference:
S0123-VIII-0.100 San Onofre Nuclear Generating StationReport and Analysis Summary10 CFR 50.54(q)(iv)(5)
Document Number: S0123-VIII-EOF Revision 1Title: Emergency Response Organization (ERO) Emergency Operations Facility Position Checklists SONGS Nuclear Notification (NN) #: 202557982 Change Descriptions Analysis SummaryRevision 1 of this Emergency Plan Implementing Procedure makes the following changes:* Multiple editorial changes* Re-ordering of actions* Clarifications
- Removal of duplicate information
- Deletion of actions that reflect changes inresponsibilities following transition to ashutdown Emergency ResponseOrganization
- Deletion of actions that reflect conditions foran operating plant* Deletion of an action that is obsolete giventhe permanently shutdown condition ofSONGS Units 2 and 3Editorial changes do not result in a reduction in effectiveness in theSONGS Emergency Plan.Certain procedural actions have been re-ordered.Procedural information is not lost and therefore these changes do not cause areduction in effectiveness in the SONGS Emergency Plan.Several changes were made to add information for clarity andimproved task performance, and therefore these changes do notcause a reduction in effectiveness SONGS Emergency Plan.Changes were made that remove duplicate information contained inthe procedure.
Procedural information is not lost, and therefore these changes do not cause a reduction in effectiveness SONGSEmergency Plan.An action for the EOF Technical Leader to establish Brown Phonecommunications with TSC was deleted.
With the optimized ERO,Attachment 3 of this procedure has an action for the EOF Technical Leader to establish communication with the TSC via the IvoryPhone. In addition this change does not delete the Brown PhoneCommunication System required by the SONGS Emergency Plan.Therefore this change does not cause a reduction in effectiveness SONGS Emergency Plan.One change deletes plant conditions that are not applicable to thepermanently defueled condition of SONGS Units 2 and 3.This is based on the following information; Nuclear fuel has been permanently offloaded on both units andSONGS is no longer authorized to replace fuel in either reactor.Following the termination of reactor operations at SONGS and thepermanent removal of the fuel from the reactor vessel, classifiable events involving the reactor coolant system (RCS) or secondary system are no longer possible.
Additionally, APPENDIX 15G of the SONGS Final Safety AnalysisReport (FSAR) was recently revised and identifies the following postulated accidents that are applicable in a permanently defuelcondition:
-Fuel handling accident inside the fuel handling building (FHA-FHB)-Spent fuel cask drop accident-Spent fuel pool boiling-Waste gas system failure (release to atmosphere)
EP(123) 26 Rev0 09/12Page 1 of 2
-Radioactive liquid waste system leak or failure (release toatmosphere)
Additionally 15G identifies that for all following postulated accidents iodine releases are not applicable twenty months after reactoroperation.
Based on the above, the remaining credible release scenarios involve a release from a Fuel Handling
- Building, and anunmonitored release.
This revision to the procedure improves theability of EOF Technical Leader to assess and respond to credibleaccident scenarios and does not result in a reduction ineffectiveness of the SONGS Emergency Plan.One Change deletes the action to print plant parameter information from CFMS. The information available on CFMS for a permanently defueled facility is extremely limited.
This revision to the procedure improves the ability of EOF Technical Leader to assess andrespond to credible accident scenarios by removing an obsoleteaction. Therefore, this change does not result in a reduction ineffectiveness of the SONGS Emergency Plan.This assessment determines this revision does not reduce theeffectiveness of the SONGS Emergency Plan.Refer to S0123-XV-109.1, Processing Procedures and Instructions for the types of allowed editorial corrections.
EP(123) 26 Rev0 09/12Page 2 of 2