ML20054A847

From kanterella
Revision as of 13:14, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Interim Deficiency Rept Re Undersized Welds Found on Some of 193 Seismic I Pipe Hangers,Initially Reported on 820203. Reportability Evaluation Will Be Completed by 820430.Final Rept Will Be Submitted by 820503
ML20054A847
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/06/1982
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, CQAD-82-603, NUDOCS 8204160200
Download: ML20054A847 (1)


Text

.

t GP&L

Carolina Power & Light Company

,7,, p ,

'Apri 6, 1982 File: SH N-2/18 CQAD 82-603 Item 69 Mr. James P. O'Reilly g G -Q United States Nuclear Regulatory Commission c3 /

4 jU Region II 101 Marietta Street, Northwest <

Atlanta, Georgia 30303 l7l ,

,3 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT (li ,

DOCKET NO. 50-400 SEISMIC I PIPE HANGERS WITH UNDERSIZE WELDSJ \

\i' "(()]

~ f; 7. . './ ,i .

Dear Mr. O'Reilly:

%i _-

On February 3,1982, the NRC (Mr. C. Julian) was notified by Carolina Power &

Light Company (Mr. N. J. Chiangi) of an item considered potentially reportabic per the provisions of 10CFR50.55(e). The NRC was informed that welds on some of the 187 previously accepted Seismic I pipe hangers were subsequently found to be rejectable; the primary problem being that the welds are undersized.

The QA/QC Inspector, who originally performed the inspections on those 187 Seismic I pipe hangers and accepted the welds, has since been terminated.

j The intent of this letter is to inform you that Carolina Power & Light Company has not been able to complete its evaluation concerning this matter since the reinspection and evaluation program has not been completed. It has now been determined through reinspection that there are 193 Seismic I pipe hangers involved. It is now anticipated that the reportability evaluation will be completed by April 30, 1982, at which time the NRC will be informed of the results. If reportable, a final report will be submitted by May 3, 1982 as indicated in our first interim report.

Thank you for your consideration in this matter.

Yours very truly, W' - s N. Chian -

nager Engineer Construction Quality Assurance / Quality Control NJC/ecc cc: Mr. G. Maxwell Mr. V. Stello (2)