ENS 50739
ENS Event | |
---|---|
21:45 Jan 15, 2015 | |
Title | Offsite Notification Due To Hospitalized Injured Employee |
Event Description | This notification is being made in accordance with NUREG-1022, Event Report Guidelines 10 CFR 50.72 and 50.73 Section 3.2.12, News Release or Notification of Other Government Agency.
On January 15, 2015 at 0720 CST, with Arkansas Nuclear One, Unit 2 (ANO-2) at 100% power, an on-site injury occurred on ANO-2. An individual fell while descending stairs and was injured. Pope County EMS transported the individual to a local medical facility. No contaminated individuals were transported off-site. No individuals were contaminated during the event. The individual was admitted to the local hospital. 29 CFR 1904.39(a) requires a report to the Occupational Safety and Health Administration (OSHA), US Department of Labor with twenty-four (24) hours after the in-patient hospitalization of one or more employees as a result of a work-related incident. At 1545 CST, ANO determined that this is a 24-hour OSHA reportable occurrence. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Arkansas Nuclear Arkansas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-4.27 h-0.178 days <br />-0.0254 weeks <br />-0.00585 months <br />) | |
Opened: | Theron Rowbothem 17:29 Jan 15, 2015 |
NRC Officer: | Donald Norwood |
Last Updated: | Jan 15, 2015 |
50739 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 50739\u003C/a\u003E - \u003Ca href=\"/Arkansas_Nuclear\" title=\"Arkansas Nuclear\"\u003EArkansas Nuclear\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EOffsite Notification Due to Hospitalized Injured Employee\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 50739 - Arkansas Nuclear\n","link":"","lat":35.31055555555555,"lon":-93.23084444444444,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |