ENS 52881
ENS Event | |
---|---|
14:34 Aug 1, 2017 | |
Title | High Pressure Coolant Injection Steam Supply Valve Failed To Reposition |
Event Description | At 0934 CDT, while appropriately removed from service for pre-planned testing, the High Pressure Coolant Injection (HPCI) inboard steam isolation valve, MO-2238, valve position indication was found to be inadequate. As a result, MO-2238 was declared inoperable in accordance with Technical Specification (TS) 3.6.1.3. This resulted in a condition that caused the HPCI system to be inoperable.
The cause of the inadequate valve position indication is currently being investigated. This report is being made pursuant to 10 CFR 50.72(b)(3)(v)(D). The NRC Resident Inspector has been informed.
The purpose of this notification is to retract a previous report made on 8/1/17 at 1700 (EDT) (EN 52881). NRC notification was initially made as a result of the High Pressure Coolant Injection (HPCI) inboard steam isolation valve, MO-2238, valve position found to be inadequate. Subsequent to the initial report, NextEra Energy Duane Arnold (NextEra) has determined that the condition observed on 8/1/17 for MO-2238 did not exist prior to removing the system from service for pre-planned testing, but was observed during post maintenance testing. Consequently, the failure does not meet the reporting requirements of 10 CFR 50.72 or 10 CFR 50.73. The NRC Resident Inspector has been notified. Notified the R3DO (Riemer). |
Where | |
---|---|
Duane Arnold Iowa (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+2.43 h0.101 days <br />0.0145 weeks <br />0.00333 months <br />) | |
Opened: | Mark Bussell 17:00 Aug 1, 2017 |
NRC Officer: | Bethany Cecere |
Last Updated: | Sep 11, 2017 |
52881 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52881\u003C/a\u003E - \u003Ca href=\"/Duane_Arnold\" title=\"Duane Arnold\"\u003EDuane Arnold\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EHigh Pressure Coolant Injection Steam Supply Valve Failed to Reposition\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52881 - Duane Arnold\n","link":"","lat":42.10089166666667,"lon":-91.77759444444445,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (99 %) |
After | Power Operation (99 %) |
Duane Arnold with 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
WEEKMONTHYEARENS 528812017-08-01T14:34:0001 August 2017 14:34:00
[Table view]10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection Steam Supply Valve Failed to Reposition ENS 516972016-01-29T15:20:00029 January 2016 15:20:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Offsite Power Declared Inoperable Due to Lowering Generator Voltage ENS 510062015-04-23T15:50:00023 April 2015 15:50:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Safety Systems Declared Inoperable Due to Equipment Malfunction ENS 508912015-03-13T17:30:00013 March 2015 17:30:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Low Pressure Coolant Injection Declared Inoperable ENS 501542014-05-30T15:43:00030 May 2014 15:43:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection Pump Received an Invalid Isolation Signal ENS 495662013-11-21T08:29:00021 November 2013 08:29:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Diesel Generator Inoperability ENS 480642012-07-02T20:05:0002 July 2012 20:05:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Declared Inoperable ENS 475612011-12-30T02:09:00030 December 2011 02:09:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Lpci Instrumentation Required Repair and Recalibration ENS 466452011-02-26T15:48:00026 February 2011 15:48:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection System Inoperable ENS 450102009-04-23T00:45:00023 April 2009 00:45:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection (Hpci) System Declared Inoperable ENS 436922007-10-05T09:08:0005 October 2007 09:08:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Loss of Both Emergency Service Water Pumps ENS 436022007-08-27T05:00:00027 August 2007 05:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident One Channel of Low Main Steam Line Pressure Signal Mistakenly Removed from Service for 33 Minutes ENS 433312007-05-01T01:17:0001 May 2007 01:17:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Declared Inoperable Due to Primary Containment Nitrogen Leak ENS 432622007-03-28T18:41:00028 March 2007 18:41:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Hpci Inoperable Due to Surveillance Test Failure ENS 431612007-02-12T16:52:00012 February 2007 16:52:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Both Standby Filter Units Inoperable ENS 431182007-01-24T15:55:00024 January 2007 15:55:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Missing Pipe Clamp Bolt Found on High Pressure Coolant Injection (Hpci) System ENS 428352006-09-08T09:01:0008 September 2006 09:01:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Containment Atmospheric Dilution (Cad) System Inoperable ENS 420252005-09-29T20:34:00029 September 2005 20:34:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Coolant Injection (Hpci) Declared Inoperable 2017-08-01T14:34:00 | |