ML24127A162

From kanterella
Revision as of 01:27, 29 August 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Non-Prop - Meeting Summary - Apr 11 2024 - Quarterly NRC-NuScale Sdaa Status Public Meeting
ML24127A162
Person / Time
Site: 05200050, 99902078
Issue date: 05/08/2024
From: Vivanco R
NRC/NRR/DNRL/NRLB
To: Jardaneh M
NRC/NRR/DNRL/NRLB
Vivanco, R., NRR/DNRL, 301-415-0021
Shared Package
ML24127A161 List:
References
Download: ML24127A162 (5)


Text

May 8, 2024

MEMORANDUM TO: Mahmoud Jardaneh, Chief New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation

FROM: Ricky A. Vivanco, Project Manager /RA/

New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION

SUMMARY

OF THE APRIL 11, 2024, OBSERVATION PUBLIC MEETING ON THE STATUS OF NUSCALES US460 STANDARD DESIGN APPROVAL APPLICATION

The U.S. Nuclear Regulatory Commission (NRC) held an observation public meeting on April 11, 2024, to discuss topics related to NuScale Power, LLCs (NuScale) US460 Standard Design Approval application (SDAA) available in the NRCs Agencywide Documents Access and Management Systems (ADAMS) Package A ccession No. ML23306A033. This meeting was part of a periodic NRC and NuScale management engagem ent to discuss the status of the application, technical topics of interest, project processes and workflows. The meeting consisted of open and closed portions.

During the open portion of the meeting, the NRC sta ff gave an overview of the current status of the NuScale application review. The staff discussed the progress of the ongoing audit for Phase A of the safety review. The staff noted complet ion of the following SDAA review phases:

  • Phase A (Advanced Safety Evaluation Report (ASER) without open items) - Chapters 2, 7, 9, 10, 11, 12,13, 17 (except 17.4), and 18.
  • Phase B (ASER review (technical edit ing), Legal and Management concurrence) -

Chapters 2, 10, 11, 13, and 17 (except 17.4)

  • Phase C (ACRS Review of ASER) - Chapters 2, 10, 11, 13, and 17 (except 17.4)

The staff also discussed the current status of the High Impact Technical Issues (HITIs). The staff noted that the main issues associated with the following two HITIs have been resolved and removed from the list:

  • HITI-4: A containment vessel material change for the lower containment vessel (CNV) shell above the reactor pressure vessel (RPV) flange elevation, the lower flange, upper flange, upper shell, and top head (i.e., a change from low alloy steel to martensitic stainless steel).
  • HITI-5: A lower RPV material change (i.e., a change from low alloy steel to austenitic stainless steel).

The staff identified the following two new HITIs which have been added to the list:

  • HITI-9: Upper-to-lower RPV flange bolted joint shear loading that result from differential thermal expansion
  • HITI-10: Loss of Coolant Accident outside containment at the connection between any of the four CVCS containment nozzle safe-end welds and associated CIVs

CONTACT: Ricky A. Vivanco, NRR/DNRL Getachew Tesfaye, NRR/DNRL 301-415-0021 301-415-8013 M. Jardaneh

The staff also presented the statuses of the eight Licensing Topical Reports (LTRs) submitted in the pre-application phase and the four LTRs submitted with the SDAA. The review of all eight of the LTRs submitted in the pre-application phase are completed. The four LTRs that were submitted at same time as the SDAA are being reviewed concurrently with the SDAAs safety review. Additionally, NuScale has submitted two generic LTRs and plans to submit two more generic LTRs to support future licensing applications. The presentation material for the open portion of the meeting can be found in ML24099A032 (nonproprietary).

The closed portion of the meeting was held to discuss proprietary items.

The public meeting notice dated April 11, 2024, was posted on the NRC public website, and can be found under ML24101A270. The enclosure to this summary provides a list of the meeting participants.

Docket Nos. 99902078 and 05200050

Enclosure:

List of Attendees

cc w/encl.: NuScale Power, LLC Listserv

Pkg: ML24127A161 Memo: ML24127A162 Action Items: ML24127A163 (Proprietary)

Slides: ML24099A032 (Nonproprietary)

Slides: ML24099A031 (Proprietary) *via email NRR-106 OFFICE NRR/DNRL/NRLB: PM NRR/DNRL/NLIB: LA NRR/DNRL/NRLB: PM NAME RVivanco SGreen GTesfaye DATE 5/06/24 5/07/24 5/07/24 OFFICE NRR/DNRL/NRLB: BC NRR/DNRL/NRLB: PM NAME MJardaneh RVivanco DATE 5/07/24 5/08/24 U.S. NUCLEAR REGULATORY COMMISSION

SUMMARY

OF THE APRIL 11, 2024, OBSERVATION PUBLIC MEETING ON THE STATUS OF NUSCALES US460 STANDARD DESIGN APPROVAL APPLICATION

LIST OF ATTENDEES

April 11, 2024

Name Organization Andrea Kock U.S. Nuclear Regulatory Commission (NRC)

Rob Taylor NRC Mahmoud Jardaneh NRC Getachew Tesfaye NRC Brian Smith NRC Joe Donoghue NRC Tania Martinez Navedo NRC Samuel Lee NRC Michael Franovich NRC Joe Colaccino NRC Carrie Fosaaen NuScale Mark Shaver NuScale Tom Griffith NuScale Robert Gamble NuScale Gary Becker NuScale Melissa Bates U.S. Department of Energy (DOE)

Enclosure 1