MONTHYEARML20197H8581990-11-14014 November 1990 Summarizes ACRS 367th Meeting on 901108-10 Re SECY-90-353 Concerning Licensing Review Basis Document for C-E ML20059L0071990-09-12012 September 1990 Notification of 901003 Meeting W/Abb C-E in Rockville,Md to Discuss Sys 80+ Seismic Envelope & Design ML20246E2921989-08-17017 August 1989 Forwards Licensing Review Basis for CESSAR-DC.Document Establishes Schedule & Process for Design Certification Review of C-E Sys 80+ ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H7651989-04-25025 April 1989 Requests Input Re Acceptability of C-E 890330 Design Certification Application for Sys 80+ Std Design ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20195K3481988-11-28028 November 1988 Notification of 881220 Meeting w/C-E in Rockville,Md to Discuss Seismic Issues Involved in Containment Design for CESSAR-DC Sys 80e Re Soil/Structure Interaction Phase ML20197D8161988-06-0202 June 1988 Notification of 880628 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20154E8081988-05-12012 May 1988 Notification of 880601 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20148C8221988-01-13013 January 1988 Notification of 880126 Meeting w/C-E in Bethesda,Md to Discuss base-line PRA for Sys 80+ design,CESSAR-DC.Portions of Meeting Will Be Proprietary ML20147C3881988-01-11011 January 1988 Notification of 880127 Meeting w/C-E in Bethesda,Md to Discuss Steam Generator Vibration Issue for Sys 80 Design ML20236W9231987-12-0303 December 1987 Requests That Encl Matl Re Sys 80 Should Be Added to File for Docket.Info Transmitted by C-E Via Telecopy on 871130, Per 871119 Telcon ML20197A8741986-10-22022 October 1986 Notification of 861024 Meeting w/C-E in Bethesda,Md to Discuss Submittal Re CESSAR ML20136H6051985-08-16016 August 1985 Notification of 850821 Meeting w/C-E in Bethesda,Md to Discuss Status of CESSAR Sser 3 & FDA-2 Amend ML20140G8031985-06-13013 June 1985 Requests Set of Questions/Issues for Consideration as Discussion Topics at Upcoming ACRS C-E Subcommittee Meeting as Result of ACRS 302nd Meeting Re DHR Sys & Rapid Depressurization Capability ML20054G5821982-06-15015 June 1982 Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components ML20054G5871982-05-12012 May 1982 Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful ML20213E1231982-02-26026 February 1982 Notification of Assistant Director 820303 Meeting in Bethesda,Md to Resolve Outstanding Licensing Issues 1990-09-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20197H8581990-11-14014 November 1990 Summarizes ACRS 367th Meeting on 901108-10 Re SECY-90-353 Concerning Licensing Review Basis Document for C-E ML20059L0071990-09-12012 September 1990 Notification of 901003 Meeting W/Abb C-E in Rockville,Md to Discuss Sys 80+ Seismic Envelope & Design ML20246E2921989-08-17017 August 1989 Forwards Licensing Review Basis for CESSAR-DC.Document Establishes Schedule & Process for Design Certification Review of C-E Sys 80+ ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H7651989-04-25025 April 1989 Requests Input Re Acceptability of C-E 890330 Design Certification Application for Sys 80+ Std Design ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20195K3481988-11-28028 November 1988 Notification of 881220 Meeting w/C-E in Rockville,Md to Discuss Seismic Issues Involved in Containment Design for CESSAR-DC Sys 80e Re Soil/Structure Interaction Phase ML20197D8161988-06-0202 June 1988 Notification of 880628 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20154E8081988-05-12012 May 1988 Notification of 880601 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20148C8221988-01-13013 January 1988 Notification of 880126 Meeting w/C-E in Bethesda,Md to Discuss base-line PRA for Sys 80+ design,CESSAR-DC.Portions of Meeting Will Be Proprietary ML20147C3881988-01-11011 January 1988 Notification of 880127 Meeting w/C-E in Bethesda,Md to Discuss Steam Generator Vibration Issue for Sys 80 Design ML20236W9231987-12-0303 December 1987 Requests That Encl Matl Re Sys 80 Should Be Added to File for Docket.Info Transmitted by C-E Via Telecopy on 871130, Per 871119 Telcon ML20197A8741986-10-22022 October 1986 Notification of 861024 Meeting w/C-E in Bethesda,Md to Discuss Submittal Re CESSAR ML20136H6051985-08-16016 August 1985 Notification of 850821 Meeting w/C-E in Bethesda,Md to Discuss Status of CESSAR Sser 3 & FDA-2 Amend ML20140G8031985-06-13013 June 1985 Requests Set of Questions/Issues for Consideration as Discussion Topics at Upcoming ACRS C-E Subcommittee Meeting as Result of ACRS 302nd Meeting Re DHR Sys & Rapid Depressurization Capability ML20054G5821982-06-15015 June 1982 Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components ML20054G5871982-05-12012 May 1982 Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful ML20213E1231982-02-26026 February 1982 Notification of Assistant Director 820303 Meeting in Bethesda,Md to Resolve Outstanding Licensing Issues 1990-09-12
[Table view] |
Text
,
/ q) UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION
'( g y WASHINGTON, D. C. 20555
\*****/ August 16, 1985 Docket No. 50-470 MEMORANDUM FOR: Cecil 0. Thomas, Chief Standardization and Special Projects Branch, DL FROM: Pierre R. Moriette Standardization and Special Projects Branch, DL
SUBJECT:
FORTHCOMING MEETING WITH COMBUSTION ENGINEERING, INC.
Date and Time: August 21, 1985 10:00 a.m.
Location: P-422, Phillips Building Bethesda, Maryland 20814
Purpose:
To discuss the status of CESSAR SSER 3 and FDA-2 Amendment
Participants:
NRC Combustion Engineering -
C. Thomas _ G. Davis .
C. Patel S. Ritterbush P. Moriette C. Brinkman Pierre R. Moriette Standardization and Special Projects Branch Division of Licensing cc: See next page 8508200440 850816 PDR A ADOCK 05000470 PDR , l 1
l E
o r ,.
Docket No. 50-470 August 16, 1985 MEMORANDUM FOR: Cecil 0. Thomas, Chief Standardization and Special Projects Branch, DL FROM: Pierre R. Moriette Standardization and Special
-Projects Branch,.DL JUBJECT: FORTHCOMING MEETING WITH COMBUSTION ENGINEERING, INC.
Date and Ticie: August 21, 1985 10:00 a.m.
Location: P-422, Phillips Building Bethesda, Maryland 20814
Purpose:
To discuss the status of CESSAR SSER 3 and FDA-2 Amendment
Participants:
NRC Combustion Engineering C. Thomas G. Davis C. Patel S. Ritterbush P. Moriette C. Brinkman Pierre R. Moriette Standardization and Special Projects Branch Division of Licensing '
cc: See next page l I
i I
i SSPB:DL C SPB- l PMoriette:dm l 8/(J/85 5 8//
u _
j
.- )
DISTRIBUTIdN:
4; Docket fjley-NRC PDR DCS NSIC -
SSPB Reading file P. Anderson D. Eisenhut I H. Thompson /F. Miraglia !
D. Crutchfield C. Thomas J. Youngblood A. Schwencer E. Adensam J. Miller G. Lainas S. Varga T. Novak J. Stolz
C. Grimes J. Zwolinski G. Holahan J. P. Knight
~
W. Johnston D. Muller F. Rowsome R. Houston L. Rubenstein F. Schroeder W. Russell -
Attorney, OELD E. L. Jordan J. Partlow '
ACRS-Receptionist, Bethesda NRC
Participants:
D. Crutchfield C. Thomas-E.. Butcher J. Donohew P. Moriette C,Patel