Environ Assessment & Finding of No Significant Impact Re Indirect Transfer of Control of Interests in Units 2 & 3, Licenses to Extent Affected by Proposed Merger of Alantic Energy,Inc & Delmarva Power & Light CoML20197G399 |
Person / Time |
---|
Site: |
Peach Bottom |
---|
Issue date: |
12/02/1997 |
---|
From: |
Stolz J NRC (Affiliation Not Assigned) |
---|
To: |
|
---|
Shared Package |
---|
ML20197G373 |
List: |
---|
References |
---|
NUDOCS 9712310008 |
Download: ML20197G399 (4) |
|
|
---|
Category:ENVIRONMENTAL IMPACT APPRAISALS
MONTHYEARML20210T5591999-08-12012 August 1999 Environ Assessment & Finding of No Significant Impact Re 990202 Application for Amends to Plant,Units 1 & 2.Proposed Action Would Correct Existing Editorial & Typographical Errors in TSs ML20249A7781998-06-15015 June 1998 Environ Assessment & Finding of No Significant Impact. Proposed Action Would Exempt Licensee from Requirement of 10CFR70.24(a) ML20197G3991997-12-0202 December 1997 Environ Assessment & Finding of No Significant Impact Re Indirect Transfer of Control of Interests in Units 2 & 3, Licenses to Extent Affected by Proposed Merger of Alantic Energy,Inc & Delmarva Power & Light Co 1999-08-12
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20210T5591999-08-12012 August 1999 Environ Assessment & Finding of No Significant Impact Re 990202 Application for Amends to Plant,Units 1 & 2.Proposed Action Would Correct Existing Editorial & Typographical Errors in TSs ML20195B6241998-12-31031 December 1998 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept 56 for 980101-1231 ML20206E0351998-12-31031 December 1998 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 14 for 1998. with ML20206C5631998-12-31031 December 1998 Radioactive Effluent Release Rept 41 for Jan-Dec 1998 for Pbaps,Units 1 & 2 ML20249A7781998-06-15015 June 1998 Environ Assessment & Finding of No Significant Impact. Proposed Action Would Exempt Licensee from Requirement of 10CFR70.24(a) ML20217H5791997-12-31031 December 1997 Radiation Dose Assessment Rept Number 13 Jan-Dec 1997 ML20217M7971997-12-31031 December 1997 Radioactive Effluent Release Rept 40,970101-1231, for Peach Bottom Atomic Power Station Units 1 & 2 ML20248E1801997-12-31031 December 1997 PBAPS Annual Radiological Environ Operating Rept,Rept 55 for Jan-Dec 1997 ML20197G3991997-12-0202 December 1997 Environ Assessment & Finding of No Significant Impact Re Indirect Transfer of Control of Interests in Units 2 & 3, Licenses to Extent Affected by Proposed Merger of Alantic Energy,Inc & Delmarva Power & Light Co ML20138A9931996-12-31031 December 1996 Annual Effluent Release Rept Number 39,for 960101-1231 ML20138C8201996-12-31031 December 1996 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 12 for Period Jan-Dec 1996 ML20141C7391996-12-31031 December 1996 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept,Rept 54 Jan-Dec 1996 ML20112B6061995-12-31031 December 1995 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept 53,Jan-Dec 1995 ML20107L9201995-12-31031 December 1995 Annual Effluent Release Rept No 38 Jan-Dec 1995 ML20107M2521995-12-31031 December 1995 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 11 for Jan-Dec 1995 ML20082P9991994-12-31031 December 1994 Annual Effluent Release Rept 37 Jan-Dec 1994 ML20082M6551994-12-31031 December 1994 PBAPS Units 2 & 3 Radiation Dose Assessment Rept 10 for Jan-Dec 1994 ML20084A0411994-12-31031 December 1994 PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept, Rept 52 for Period of 940101-1231 ML20029C7651993-12-31031 December 1993 Radiation Dose Assessment Rept 9 for 1993. ML20076K7801993-12-31031 December 1993 Corrected Copies of Semi-Annual Effluent Release Rept 36 Jul-Dec 1993, for PBAPS Units 2 & 3 ML20064H8801993-12-31031 December 1993 Revised Occupational Exposure Rept for 1993 ML20067D2611993-12-31031 December 1993 Semiannual Effluent Release Rept 36 Jul-Dec 1993 ML20063K2881993-12-31031 December 1993 PBAPS 1993 Occupational Exposure Tabulation 18 ML20056G0921993-06-30030 June 1993 Semiannual Effluent Release Rept 35 for Jan-June 1993 for Pbaps,Units 2 & 3 ML20044E3811992-12-31031 December 1992 Annual Radiological Environ Operating Rept,Rept 50 for Jan-Dec 1992. ML20114B5291992-06-30030 June 1992 Semiannual Effluent Release Rept 33,Jan-June 1992,Peach Bottom Atomic Power Station,Units 2 & 3 ML20095J8231991-12-31031 December 1991 Radiation Dose Assessment Rept,1991 ML20096G6911991-12-31031 December 1991 Annual Radiological Environ Operating Rept,Rept 49, for 1991 ML20094G7731991-12-31031 December 1991 Semi-Annual Effluent Release Rept for Jul-Dec 1991 ML20115A6251991-12-31031 December 1991 Revised 1991 Recorded Annual Whole Body Exposure Rept, Consisting of Listing of Std Format for Reporting Number of Personnel & man-rem by Work & Job Function for 1991 & Number of Individuals in Each Range ML20090B4321991-12-31031 December 1991 Standard Format for Reporting Number of Personnel & Man-Rem by Work & Job Function for the Period Jan-Dec 1991 ML20082L8751991-06-30030 June 1991 Semiannual Effluent Release Rept,Jan-June 1991 ML20115A6351990-12-31031 December 1990 Revised 1990 Occupational Exposure Rept, Consisting of Listing of Recorded Annual Whole Body Exposures ML20073Q7051990-12-31031 December 1990 Annual Radiological Environ Operating Rept 48,1990 ML20073H3461990-12-31031 December 1990 Radiation Dose Assessment Rept, 1990 ML20082M0181990-12-31031 December 1990 Corrected Solid Radwaste Portion of Semiannual Effluent Release Rept for Jul-Dec 1990 ML20029B0801990-12-31031 December 1990 Exposure Rept. W/910227 Ltr ML20090B4441990-12-31031 December 1990 Revised Annual Whole Body Exposure for 1990 ML20029B0791990-12-31031 December 1990 Semiannual Effluent Release Rept 30,Jul-Dec 1990. W/910227 Ltr ML20028G8201990-06-30030 June 1990 Peach Bootom Atomic Power Station Semiannual Effluent Release Rept,Jan-June 1990. ML20043J1001990-05-25025 May 1990 NPDES Nonccompliance Notification:On 900329,discharge of 30-40 Gallons of Fuel Oil Into Storm Sewer Drain Occurred & Release of 25 Gallons Fuel Oil Into Discharge Canal Occurred on 900510.Spill Prevention Control Plan Encl.W/O Encl ML20090B4561989-12-31031 December 1989 Revised Annual Whole Body Exposure for 1989 ML20043B6441989-12-31031 December 1989 1989 Annual Radiological Environ Operating Rept 47. W/ 900524 Ltr ML20115A6391989-12-31031 December 1989 Revised 1989 Occupational Exposure Rept, Consisting of Listing of Recorded Annual Whole Body Exposure ML20012C2541989-12-31031 December 1989 Recorded Annual Whole Body Exposure for Period Jan-Dec 1989. W/900309 Ltr ML20012C6181989-12-31031 December 1989 Semiannual Effluent Release Rept 28,Jul-Dec 1989. W/900228 Ltr ML20247G9191989-09-14014 September 1989 NPDES Noncompliance Notification:On 890907,bypass of Onsite Sewage Plant Resulted in Discharge of Not More than 1,000 Gallons of Untreated Sewage.Caused by Crack in Sewage Line. Domestic Water Secured & Sewage Pipe Repaired ML20245H4811989-08-0707 August 1989 NPDES Noncompliance Notification:On 890626,11 Gallons of Houghto-Safe 620 Hydraulic Fluid Spilled in Subpile Room of Unit During Preparation for CRD Removal Work.Major Portion of Spill Collected in Dry Well Sumps & Floor Flushed ML20246J9431989-06-30030 June 1989 Semiannual Effluent Releases Rept 27 for Jan-June 1989 ML20247M0291989-06-30030 June 1989 Rev 1 to Semiannual Effluent Releases Rept,Jan-June 1989 1999-08-12
[Table view] |
Text
..
. l i
l 7590-01-P i
UNITED STATES NUCLEAR REGULATORY CDPMIS$10N !
PECO ENERGY COMPANY
- PUBLIC SERVICE ELECTRIC AND GAS COMPANY I !
DELf98tVA POWER AND Ll4HT COMPANY ,
4 ATLANTIC CITY ELECTRIC COMPANY ,
PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 j Doctri N05. 50-277 AND 50-12A ENVIRONMENTAL ASSESSMENT AND FINDING 0F NO SIGNIFICANT IMPACT 4
The U.S. Nuclear Regulatory Commission (the Commission) is considering f
approval, by issu6, ice of an order, under 10 CFR 50.80, of the indirect ,
transfer of control of the inttrests in the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, licenses to the extent effected by a proposed merger of Atlantic Energy Inc. (the parent holding company of Atlantic City Electric Company (ACE)) and Delmarva Power & Light Company (DP&L), resulting in-the r
formation of a new holding company, Conectiv, Inc. ACE is co-holder of Facility Operating Licenses Nos. DPR-44 and DPR-56, along with Public Service _!
ElectricandGasCompany(PSE&G),PECOEnergyCompany(PECO),andDP&L, issued for operation of the PBAPS, Units 2 and 3, located in Peach Botton Township, York County, Pennsylvania. .
INVIRONMENTAL ASSESSMENT i Identification of the Prooosed Action!
- The proposed action would consent to the indirect transfer of the interests in P8APS to the extent effected by the proposed merger of Atlantic Energy. Inc. and DF&L, resulting in the formation of a new holding company, fDFM Pyg7 .
-t-l l
Conectiv, Inc., under which ACE and DP,tt would become wholly owned subsidiaries. No direct transfer of the licenses as held by ACE and DP&L l would occur. PECO, the licensed operator;of the facilities, and PSE&G are not involved in the merger and restructuring. -
l The proposed action is in accordance with an application flied by ACE and DP&L under cover of a letter dated April 30, 1997, from John H. O'Neill, '
Jr., of Shaw, Pittman, Potts & Trowbridge, Counsel for ACE and DP&L.
The Need for the Prooosed Action The proposed action is required to enable the proposed merger and restructuring of Atlantic Energy, Inc., ACE and DP&L to occur to the extent indirect transfers of control of the licenses will be effected by the menger and restructuring.
Environmental Imoacts of the Pronosed Action:
The Commission has completed its evaluation of the proposed action and ,
concludes that there will be no physical or operational changes as a result of l the proposed action. The corporate merger and restructuring will not affect the qualifications or organizational affiliation of the personnel who operate the facilities, as PECO, not involved in the merger, will continue to be responsible for the operation of PBAPS, Units 2 and 3.
The change will no c increase the probability or consequences of accidents, no changes are being made in the types of any effluents that may be released offsite, and there is no significant increase in the allowable
-individual or cumulative occupational radiation exposure. Accordingly, the Comission :oncludes.that there are no significant radiological environmental impacts associated with the. proposed action.
l .
i With regard to potential nonradiological impacts, the proposed action
! will not affect nonradiological plant effluents and will have no other I-l- environmental impact. Accordingly, the Commission concludes that there are no l significant nonradiological environmental impacts associated with the proposed l i
action. [
- -Alternatives to the Proonsed Action l t
Since the Commistion.has concluded there is no measurable environmental l 4
impact associated with the proposed action, any alternatives with equal or ;
greater environmental impact need not be evaluated. As an alternative to the
]
, proposed action, the staff considered denial of the proposed action. Denial l of the application would result in no change in current environmental impacts. :
t The environmental impacts of the proposed action and the alternative action are similar. '
Alternative Use of Resources:
This-action does not involve the use of any resources not previously ,
- considered in the ' Final Environmental Statement Related to the Operation of Peach Bottom Atomic Power Station, Units 2 and 3," April 1973.
Aaencias and Persons Consultad: ;
! In accordance with its stated policy, on September 15, 1997, the staff consulted with the Pennsylvania State official, Mr. S. Maingi of the State of Pennsylvania, Bureau of Radiation Protection, regarding 'the environmental impact of the proposed action. The State official had no comments. )
- z. , . . .:- , . . . . _ - . . . ~ - ,
-- , - . - .- -- . - - ,, . - -..- .-- - - - .,. - - ~3
. l i
4-f.1NQING 0F NO SIGNIFICANT IMPACT Based upon the environmental assessment, the Commission concludes that l the proposed action will not have a significant effect on the quality of the t human environment. Ac.ordingly, the Commission has determined not to prepare an environmental impact st.'.ement for the proposed action.
For further details with respect to the proposed action, see the <
application filed by ACE and DP&L under cover of a letter dated April 30, 1997, as supplemented November 7,1997, from John H. O'Neill, Jr., of Shaw, Pittman, Potts & Trowbridge (Counsel for ACE and DP&L), rhich is available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washingtor, DC, and at the local public document room located at the Government Publications Section, State Librsry of Pennsylvania, (REGIONAL DEPOSITORY) Education Building, Walnut Street and Commonwealth Avenue, Box 1601, Harrisburg, Pennsylvania.
Dated at Rockville, Maryland, this 2nd day of December 1997.
FOR THE NUCLEAR REGULATORY COMMISSION
~
'F. Stolz, Dire or ect Directorate -2 1sion of Reactor Projects - 1/II Office of Nuclear Reactor Regulation 1