The inspectors identified a non- cited violation in which three senior reactor operator (
SRO) licenses had expired without the appropriat
renewal forms being submitted. Two of these individuals improperly fulfilled Technical Specification positions that required an SRO license from October 2, 2002, to October 11, 2002. The violation was determined to be of very low safety significance and a non-cited violation of Technical Specification Sections 5.2.2.b & 5.2.2.e, whic
requires, in part, that two (2) SRO licensed individuals must be on the operating crew and the operating supervisor must hold an SRO license, respectively. Traditional enforcement was used because failure to submit the license renewa
forms affected the NRCs ability to perform its regulatory function to periodically review the medical and requalification training qualifications of licensed operators.