MONTHYEARML20211D1321999-08-20020 August 1999 Application for Amend to License DPR-50 to Revise TS Bases Re Degraded Undervoltage Relay Setpoint Calibration Frequency & Degraded Voltage Relay Tolerance Rev ML20210J0941999-07-29029 July 1999 Suppl TS Change Request 274 to License DPR-50,revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance Tss,As Result of NRC Generic Concerns Re CR Habitability Issues ML20196K5901999-06-29029 June 1999 LAR 285 for License DPR-50,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls Can Continue to Be Moved ML20209C0551999-06-29029 June 1999 LAR 77 for License DPR-73,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matl May Continue to Be Moved ML20195E3341999-06-0404 June 1999 TS Change Request 265 to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20209B5891999-05-26026 May 1999 LAR 281 to License DPR-50,revising TMI-1 UFSAR Chapters 5 & 14 to Permit Use of Conservative Deterministic Failure Margin Methodology for Seismic Analysis of Portions of Auxiliary Steam Line.Rept 240046-R-001 Encl.Rept Withheld ML20206R1111999-05-13013 May 1999 Application for Amend to License DPR-50,requesting That License Sections 2.a.(3) & 2.c.(7) & TS Section 3.1.1 Be Revised to Incorporate Administrative Updating & Changes to Bases Statement ML20205H0691999-04-0101 April 1999 TS Change Request 262 to License DPR-50,revising TS by Adding LCO Action Statements & Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0421999-02-0202 February 1999 TS Change Request 274 to License DPR-50,expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems ML20196G4401998-12-0303 December 1998 LAR 278 to License DPR-50,requesting Consent to Transfer & Authorize Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License.Supporting Documentation,Encl ML20196H9751998-12-0303 December 1998 LAR 279 to License DPR-50,reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G7671998-11-25025 November 1998 TS Change Request 277 to License DPR-50,changing Surveillance Specs for OTSG ISIs for TMI-1 Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only ML20154Q6201998-10-19019 October 1998 TS Change Request 248 to License DPR-50,adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18, Remote Shutdown Sys ML20154P8441998-10-19019 October 1998 Application for Amend to License DPR-50,providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage.Proprietary & non- Proprietary Calculation,Encl.Proprietary Info Withheld ML20154M3691998-10-15015 October 1998 Application for Amend to License Amend Request 276 to License DPR-50 Revising UFSAR Chapter 14 Accident Analysis Atmospheric Dispersion Factors.Ufsar Revised Pages Encl ML20249B2391998-06-11011 June 1998 TS Change Request 273 to License DPR-50,incorporating Alternate High Radiation Area Control Consistent W/Reg Guide 8.38 ML20217E5131998-03-23023 March 1998 Application for Amend to License DPR-50,revising TS Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 Efpy.Request Also Submitted in Response to NRC ML20217G0161997-10-0303 October 1997 Suppl to License Amend Request 268 to License DPR-50, Replacing Pages 4-80 & 4-81 Previously Submitted w/TMI-1 License Amend Request 268 on 970812 ML20211C3211997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re License Amend Request 269 Submitted on 970814.Suppl Includes Addl Change to TS Section 3.1.4 & Proposed Page Rev Clarifying That UFSAR Analysis Is More Conservative ML20211C2221997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re TS Change Request 266.Supplement Provides for Phased Review & Issuance of License Amends & Involves Administrative Correction to TS Decay Heat Removal Sys Leakage Rate ML20210J9951997-08-14014 August 1997 Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J3981997-08-12012 August 1997 Tech Spec Change Request 268 for License DPR-50,revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operations ML20198E7871997-07-30030 July 1997 TS Change Request 266 to License DPR-50,incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 ML20141E1311997-05-0808 May 1997 Application for Amend to License DPR-50,consisting of Change Request 264,incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2351997-04-21021 April 1997 Application for Amend to License DPR-50,requesting Rev to TS 3.3 Re Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Systems ML20134M1111997-02-0707 February 1997 Application for Amend to License DPR-50,incorporating Certain Improvements from Revised STS for B&W Plants, NUREG-1430 & Addl Changes as Described in Encl TS ML20133D2651996-12-24024 December 1996 Application for Amend to License DPR-50,requesting Reinstatement of Auxiliary & Fuel Handling Bldg Ventilation Sys TS ML20132F3221996-12-16016 December 1996 Application for Amend to License DPR-50,consisting of Change Request 260,reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135C5201996-12-0202 December 1996 TS Change Request (Tscr) 75 to License DPR-73,relocating Audit Frequency Requirements to Pdms QA Plan ML20117H0181996-08-29029 August 1996 Application for Amend to License DPR-50,consisting of TS Change Request 257,incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1901996-06-28028 June 1996 Application for Amend to License DPR-50,consisting of Change Request 259,allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8751996-05-24024 May 1996 Errata to Application for Amend to License DPR-50,consisting of TS Change Request 243,replacing Pages for App a ML20101R1361996-04-10010 April 1996 Application for Amend to License DPR-50,consisting of Change Request 243,revising Addl Group of Surveillances in Which Justification Has Been Completed Following Receipt of 930623 Application ML20100J6831996-02-22022 February 1996 Application for Amend to License DPR-50,consisting of Change Request 254,revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Station Battery Cell Parameters Not Met ML20095J2261995-12-21021 December 1995 Revised TS Change Request 254,raising Low Voltage Action Level to 105 Volts DC ML20091L2831995-08-23023 August 1995 Rev to TS Change Request 223 to License DPR-50,incorporating Ref to 10CFR20.1302 ML20087F4881995-08-11011 August 1995 Rev to TS Change Request 252 to License DPR-50,removing TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements.Certificate of Svc Encl ML20086R3001995-07-24024 July 1995 Rev to LAR 250 to License DPR-50,clarifying Section III, SE Justifying Change for source-range Nuclear Instrumentation SRs ML20085N1551995-06-22022 June 1995 TS Change Request 227 to License DPR-50,replacing Pages for App A.Certificate of Svc Encl ML20084N3461995-06-0101 June 1995 TS Change Request 223 to License DPR-50,deleting Remaining Portions of RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084L4201995-06-0101 June 1995 TS Change Request 251 to DPR-50,revising TS 5.3.1.1 to Describe Use of Advanced Clad Assemblies ML20084B3261995-05-24024 May 1995 Application for Amend to License DPR-50.Amend Would Change Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7771995-05-17017 May 1995 Application for Amend to License DPR-50,consisting of Change Request 252,removing Chemical Addition Sys Requirements from TS to COLR ML20079A7771994-12-23023 December 1994 Rev to TS Change Request 221 to License DPR-50,revising TS Page 3-32a ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20069A6731994-05-20020 May 1994 TS Change Request 244 to License DPR-50,requesting Revised CR Trip Insertion Time Testing Acceptance Criterion for Remainder of Cycle 10 for 12 Specific CRs Which Initially Experienced Slow Rod Drop Times During Testing on 940317 ML20065M6681994-04-19019 April 1994 TS Change Request 237 to License DPR-50,deleting Audit Program Frequency Requirements from TS & Relocating Subj Requirements to Operational QA Plan ML20065K0381994-04-11011 April 1994 TS Change Request 238 to License DPR-50,relocating Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR ML20073C7701994-03-22022 March 1994 Application for Amend to License DPR-50 Re TS Change Request 242 Concerning Control Rod Trip Insertion Time Testing ML20064J3771994-03-11011 March 1994 Application for Amend to License DPR-50,revising TS Re Allowable Outage Time for Emergency Feedwater Pumps During Surveillance Activities 1999-08-20
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211D1321999-08-20020 August 1999 Application for Amend to License DPR-50 to Revise TS Bases Re Degraded Undervoltage Relay Setpoint Calibration Frequency & Degraded Voltage Relay Tolerance Rev ML20210J0941999-07-29029 July 1999 Suppl TS Change Request 274 to License DPR-50,revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance Tss,As Result of NRC Generic Concerns Re CR Habitability Issues ML20209D6651999-07-0808 July 1999 Corrected TS Pages 3-21,4-5a,4-9,4-38 & 6-3 to Amends 211 & 212 to License DPR-50.Pages Failed to Reflect Previously Approved Changes Granted in Amends 203 & 204 in Case of Amend 211 & 207 in Case of Amend 212 ML20196K5901999-06-29029 June 1999 LAR 285 for License DPR-50,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls Can Continue to Be Moved ML20209C0551999-06-29029 June 1999 LAR 77 for License DPR-73,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matl May Continue to Be Moved ML20195E3341999-06-0404 June 1999 TS Change Request 265 to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20209B5891999-05-26026 May 1999 LAR 281 to License DPR-50,revising TMI-1 UFSAR Chapters 5 & 14 to Permit Use of Conservative Deterministic Failure Margin Methodology for Seismic Analysis of Portions of Auxiliary Steam Line.Rept 240046-R-001 Encl.Rept Withheld ML20206R1111999-05-13013 May 1999 Application for Amend to License DPR-50,requesting That License Sections 2.a.(3) & 2.c.(7) & TS Section 3.1.1 Be Revised to Incorporate Administrative Updating & Changes to Bases Statement ML20205H0691999-04-0101 April 1999 TS Change Request 262 to License DPR-50,revising TS by Adding LCO Action Statements & Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0421999-02-0202 February 1999 TS Change Request 274 to License DPR-50,expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems ML20196H9751998-12-0303 December 1998 LAR 279 to License DPR-50,reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G4401998-12-0303 December 1998 LAR 278 to License DPR-50,requesting Consent to Transfer & Authorize Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License.Supporting Documentation,Encl ML20196G7671998-11-25025 November 1998 TS Change Request 277 to License DPR-50,changing Surveillance Specs for OTSG ISIs for TMI-1 Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only ML20195C6811998-11-12012 November 1998 Amend 52 to License DPR-73,relocating Audit Frequency Requirements from TMI-2 to TMI-2 Post Defueling Monitored Storage QA Plan & Extends Max Allowed Interval Between Certain Audits from 12 Months to 24 Months ML20154P8441998-10-19019 October 1998 Application for Amend to License DPR-50,providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage.Proprietary & non- Proprietary Calculation,Encl.Proprietary Info Withheld ML20154Q6201998-10-19019 October 1998 TS Change Request 248 to License DPR-50,adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18, Remote Shutdown Sys ML20154M3691998-10-15015 October 1998 Application for Amend to License Amend Request 276 to License DPR-50 Revising UFSAR Chapter 14 Accident Analysis Atmospheric Dispersion Factors.Ufsar Revised Pages Encl ML20249B2391998-06-11011 June 1998 TS Change Request 273 to License DPR-50,incorporating Alternate High Radiation Area Control Consistent W/Reg Guide 8.38 ML20217E5131998-03-23023 March 1998 Application for Amend to License DPR-50,revising TS Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 Efpy.Request Also Submitted in Response to NRC ML20217G0161997-10-0303 October 1997 Suppl to License Amend Request 268 to License DPR-50, Replacing Pages 4-80 & 4-81 Previously Submitted w/TMI-1 License Amend Request 268 on 970812 ML20211C2221997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re TS Change Request 266.Supplement Provides for Phased Review & Issuance of License Amends & Involves Administrative Correction to TS Decay Heat Removal Sys Leakage Rate ML20211C3211997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re License Amend Request 269 Submitted on 970814.Suppl Includes Addl Change to TS Section 3.1.4 & Proposed Page Rev Clarifying That UFSAR Analysis Is More Conservative ML20210J9951997-08-14014 August 1997 Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J3981997-08-12012 August 1997 Tech Spec Change Request 268 for License DPR-50,revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operations ML20198E7871997-07-30030 July 1997 TS Change Request 266 to License DPR-50,incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 ML20141E1311997-05-0808 May 1997 Application for Amend to License DPR-50,consisting of Change Request 264,incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2351997-04-21021 April 1997 Application for Amend to License DPR-50,requesting Rev to TS 3.3 Re Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Systems ML20134M1111997-02-0707 February 1997 Application for Amend to License DPR-50,incorporating Certain Improvements from Revised STS for B&W Plants, NUREG-1430 & Addl Changes as Described in Encl TS ML20133D2651996-12-24024 December 1996 Application for Amend to License DPR-50,requesting Reinstatement of Auxiliary & Fuel Handling Bldg Ventilation Sys TS ML20132F3221996-12-16016 December 1996 Application for Amend to License DPR-50,consisting of Change Request 260,reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135C5201996-12-0202 December 1996 TS Change Request (Tscr) 75 to License DPR-73,relocating Audit Frequency Requirements to Pdms QA Plan ML20134D7761996-10-24024 October 1996 Amend 51 to License DPR-73,revising TS to Extend Surveillance Interval for Demonstrating Operability of Containment Airlock ML20128K1831996-10-0808 October 1996 Amend 50 to License DPR-73,revising TS to Incorporate Improvement from Administrative Controls Section of Revised STS for B&W Plants ML20117H0181996-08-29029 August 1996 Application for Amend to License DPR-50,consisting of TS Change Request 257,incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1901996-06-28028 June 1996 Application for Amend to License DPR-50,consisting of Change Request 259,allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8751996-05-24024 May 1996 Errata to Application for Amend to License DPR-50,consisting of TS Change Request 243,replacing Pages for App a ML20101R1361996-04-10010 April 1996 Application for Amend to License DPR-50,consisting of Change Request 243,revising Addl Group of Surveillances in Which Justification Has Been Completed Following Receipt of 930623 Application ML20100J6831996-02-22022 February 1996 Application for Amend to License DPR-50,consisting of Change Request 254,revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Station Battery Cell Parameters Not Met ML20095J2261995-12-21021 December 1995 Revised TS Change Request 254,raising Low Voltage Action Level to 105 Volts DC ML20091L2831995-08-23023 August 1995 Rev to TS Change Request 223 to License DPR-50,incorporating Ref to 10CFR20.1302 ML20087F4881995-08-11011 August 1995 Rev to TS Change Request 252 to License DPR-50,removing TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements.Certificate of Svc Encl ML20086R3001995-07-24024 July 1995 Rev to LAR 250 to License DPR-50,clarifying Section III, SE Justifying Change for source-range Nuclear Instrumentation SRs ML20085N1551995-06-22022 June 1995 TS Change Request 227 to License DPR-50,replacing Pages for App A.Certificate of Svc Encl ML20084N3461995-06-0101 June 1995 TS Change Request 223 to License DPR-50,deleting Remaining Portions of RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084L4201995-06-0101 June 1995 TS Change Request 251 to DPR-50,revising TS 5.3.1.1 to Describe Use of Advanced Clad Assemblies ML20084B3261995-05-24024 May 1995 Application for Amend to License DPR-50.Amend Would Change Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7771995-05-17017 May 1995 Application for Amend to License DPR-50,consisting of Change Request 252,removing Chemical Addition Sys Requirements from TS to COLR ML20079A7771994-12-23023 December 1994 Rev to TS Change Request 221 to License DPR-50,revising TS Page 3-32a ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20069A6731994-05-20020 May 1994 TS Change Request 244 to License DPR-50,requesting Revised CR Trip Insertion Time Testing Acceptance Criterion for Remainder of Cycle 10 for 12 Specific CRs Which Initially Experienced Slow Rod Drop Times During Testing on 940317 1999-08-20
[Table view] |
Text
._ ._ - - _ - _
- j
. i 1
i GPU Nuclear Corporation 5 Nuclear ;;gnir" Middletown, Pennsylvania 17057-0480 (717)944 7621 Writer's Direct Dial Number:
(717) 948-8005 March 11, 1994 C311-94-2024 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Dear Sir:
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No. 241 In accordance with 10 CFR 50.4(b)(1), enclosed is Technical Specification Change Request (TSCR) No. 241.
Also enclosed is a Certificate of Service for this request, certifying service to the chief executives of the township and county in which the facility is located, as well as the designated official of the Commonwealth of Pennsylvania, Bureau of Radiation Protection.
The purpose of this TSCR is to specify an allowable outage time for the Emergency Feedwater Pumps during surveillance activities. Also, this TSCR changes the requirement to test redundant components for operability to a requirement to ensure operability based on verification of completion of appropriate surveillance activities. Finally, administrative errors made during the processing of Amendments 133 and 174 are corrected.
l Sincerely, Q41'k.g A.
T. G. Brotidhton )
Vice President and Director, TMI l
1 AWM/ emf I l
Enclosure:
- 1) Technical Specifications Change Request No. 241 ;
- 2) Certificate of Service for Technical Specification Change Request No. 241 cc: Region I Administrator l THI-l Senior Project Manager l TMl Sr '~ Dacirient Inspector
$b(ICO._hEMNUEsois, -@' I PDR ,
GPU Nuclear Corporation is a subsidiary of General Public Utihties Corporation
! l
f1ETROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION, UNIT 1 Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No. 241 COMMONWEALTH OF PENNSYLVANIA )
) SS:
COUNTY OF DAUPHIN )
This Technical Specification Change Request is submitted in support of Licensee's request to change Appendix A to Operating License No. DPR-50 for Three Mile Island Nuclear Station, Unit 1. As part of this request, proposed replacement pages for Appendix A are also included.
GPU NUCLEAR CORPORATION BY: bb W bA Vice President und Director, IMI Sworn and Subscribed to before me this _jlb day of J e , 1994.
Notarf'Public Em M NAc w%"TJbEW%
Mentwt, Porsgivusa Amx2TKn of FKAW.es
. ..-- . . . ~ . . - _ . . - _ _ - - . . -
V .'
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 1
d IN THE MATTER OF DOCKET NO. 50-289
^
GPU NUCLEAR CORPORATION LICENSE N0. DPR-50 CERTIFICATE OF SERVICE This is to certify that a copy of Technical Specification Change Request No. 241 to Appendix A of the Operating License for Three Mile Island Nuclear Station Unit 1, has, on the date given below, been filed with executives of Londonderry Township, Dauphin County, Pennsylvania; Dauphin County, Pennsylvania; and the Pennsylvania Department of Environmental Resources, Bureau of Radiation Protection, by deposit in the United States mail, addressed as follows:
4 Mr. Darryl LeHew, Chairman Mr. Russell L. Sheaffer, Chairman Board of Supervisarr of Board of Ceraty Commissioners Londonderry Township of DaupF n County R. D. #1, Geyers Church Road Dauphin f .unty Courthouse Middletown, PA 17057 Harrisbu~g, PA 17120 ,
Director, Bureau of Radiation Protection PA. Department of Environmental Resources Fifth Floor, Fulton Building Third and Locust Streets P. O. Box 2063 Harrisburg, PA 17120 Attn: Mr. Robert Barkanic GPU NUCLEAR CORPORATION :
i
- ^
BY: "@
Vice President a6) Director, TMi-~
March 11, 1994 DATE:
4
---,,------n,. e -- - , p- - - -w.
~..-,-~w -- e ,-, --. --, - , - -
. : l C311-94-2024 Page 1
- 1. 'TECHPICAL SPECIFICATION CHANGE RE0 VEST (TSCR) NO. 241 ~
GPU Nuclear requests that the following changed replacement pages be I inserted into existing Technical Specifications (T.S.): j Replace the existing pages 3-22, 3-25, 3-26b, 3-41, and 3-61 with the attached revised pages 3-22, 3-25, 3-26b, 3-41, and 3-61.
II. REASON FOR CHANGE This requested change to the T.S. will modify the existing requirements as follows:
- a. T.S. 3.3.1.3.b is modified to correct an administrative error. TSCR No. 222 made no changes to this specification, however, this specification was retyped for this submittal. In the process of retyping, the "1" sign between 8 ft, and 6 inches was inadvertently omitted and not detected during review. Amendment 174 was issued with the i sign omitted.
- b. T.S. 3.3.2 is modified to clarify that maintenance or testing shall be allowed during reactor operation on the components associated with emergency core cooling, reactor building (RB) emergency cooling, and the RB spray systems,
- c. T.S. 3.4.1.1(2) is modified to provide a specified allowable outage time for the Emergency Feedwater (EFW) pumps during T.S. required surveillance testing,
- d. Bases for T.S. 3.4, last paragraph on page 3-26b, is modified to correct an administrative error. A change was made to this paragraph with Amendment 124 which stated that either both motor driven EFW pumps or the single steam-driven EFW pump are required initially to remove .1 decay heat, with one EFW pump eventually sufficing. When Amendment 133 l was issued, this paragraph was inadvertently changed to pre-Amendment 124 wording. In addition, a clarifying sentence was added to explain that acceptably minor operator action may be required during -
surveillance testing to ensure both motor driven EFW pumps are .l available, j
- e. T.S. 3.6.6 is modified to change the requirement to test a redundant RB isolation valve for OPERABILITY following a determination that the other valve in the line is inoperable. Instead of testing the redundant valve to verify OPERABILITY, the redundant valve is verified to be OPERABLE by ensuring the appropriate T.S. surveillance is current.
- f. T.S. 3.15.1.3 is modified to change the requirement to test the redundant control room air treatment system when the other system is made or found to be inoperable for any reason. Instead of testing the redundant system to verify OPERABILITY, the redundant system is verified to be OPERABLE by ensuring the appropriate T.S. surveillance ,
is current. l l
o n C311-94-2024 1y Page'2 1
'l
.l 1hese changes, in conjunction with TSCRs 228.and 230, arc being made.to .l permit full implementation of the guidance provided to licensees regarding OPERABILITY determinations in Generic Letter 91-18. Guidance from NUREG-1366, " Improvements to Technical Specifications Surveillance Requirements," and NUREG-1430, " Standard Technical. Specifications for ;
Babcock and Wilcox Plants," was used to dev lop these changes. j III. SAFETY EVALUATION JUSTIFYING CHANGE
- 1. Page 3-22 T.S. 3.3.2 currently specifies that maintenance is allowed during reactor operation on any component (s) in the makeup and purification, i decay heat, RB emergency cooling water, RB spray, Core Flood Tank (CFT) pressure instrumentation, CFT level instrumentation, BWST level instrumentation, or cooling water systems, which will not remove more than one train of each system from service. T.S. 3.3.2 also requires that only one train can be affected such that it is inoperable no more than 72 consecutive hours.
This proposed change would clarify the intent of this specification to also allow any component (s) to be removed from service for T.S.
surveillance testing. Thus, when any component (s) becomes inoperable in the course of T.S. surveillance ter. ting, the same restrictions as those for maintenance apply and thet a is no change in the safety function capability of the systems with redundant trains.
This proposed change also includes a modification to T.S. 3.3.1.3.b to il correct an administrative error. The " " sign between 8 ft. and 6 inches was inadvertently omitted when submitting TSCR No. 222 and was subsequently missing when the associated Amendment 174 was issued. 3
- 2. Page 3-25 T.S. 3.4.1.1 provides the requirements for EFW pumps and associatsd flow paths with the Reactor Coolant System (RCS) temperature greater than 250' F. The following test requirements have an impact on the EFW pumps and associated flow paths:
- a. T.S. 4.9.1.2 requires that if one steam generator flow path is made inoperable a dedicated qualified individual who is in communication with the control room shall be continuously stationed at the affected EFW local manual valves. On instruction from the control room operator, the individual shall . realign the valves from the test mode to their operational alignment.
- b. T.S. Table 4.1-1, Section 51.a requires quarterly EFW Auto Initiation testing.
. ~ -- . - - . _ . . . . ._ , - _. .
C311-94-2024 Page 4 inoperable. The periodic satisfactory completion of the existing surveillance tests assures that the associated valves are OPERABLE.
, 5. Page 3-61 T.S. 3.15.1.3 requires testing the redundant control room air treatment system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and daily thereafter from the time one control i
room air treatment system is made or found to be inoaerable. This requirement reflects an earlier NRC staff position t1at has been revised and is not included in the revised B&W STS. By verifying the required periodic surveillance testing is current and there are no known reasons to suggest the redundant train is inoperable, adequate assurance exists that the redundant train is OPERABLE.
4 IV. NO SIGNIFICANT HAZARDS CONSIDERATIONS GPU Nuclear has determined that this TSCR involves no significant hazards j consideration as defined by NRC in 10 CFR 50.92.
- 1. Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability of occurrence or the consequences of an accident previously evaluated.
The proposed amendment specifies an allowable outage time for testing of the EFW pumps. Also, this preposed change reflects the current NRC staff position regarding the need for additional testing to assure OPERABILITY. The allowable outage time this change provides for EFW pump testing is acceptable because the operator action required to make the motor driven EFW pump OPERABLE is minimal and can be performed in a very short time by the Control Room Operato! who is continuously present during the time the motor-drivan EFV pump is in the !
Pull-To-lock position.
The changes affecting OPERABILITY determ; nations of redundant train / components for reactor building isolation valves and the control room air treatment systems reflect the current NRC staff position.
Verifying that the required periodic surveillance testing is current .l and there are no known reasons to suggest the redundant train / component i is inoperable, provides adequate assurance of system OPERABILITY.
Therefore it can be concluded that the proposed changes do not involve a significant increase in the probability or consequences of an i accident previously evaluated, i
- 2. Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment specifies an allowable outage time and deletes unnecessary redundant equipment testing. These changes do not change system operational requirements or response to system transients.
Therefore, the proposed amendment does not create the possibility of a new or different kind of accident.
.-e- , ,- , r w,.-- ,, , - , . - , y
. : i l
C311-94-2024 l Page 5
'3. Operation of the facility in accordance with the proposed amendment )
would not involve a_significant reduction in a margin of safety. l l
The proposed amendment specifies an allowable outage time and replaces I redundant equipment testing with verification that surveillance is !
current as an adequate means to ensure OPERABILITY. These changes do l not involve any activities associated with the margin of safety j envelope. Thus, operation of the facility in accordance with the proposed amendment does not involve a significant reduction in a margin ;
of safety.
V. IMPLEMENTATION It is requested that the amendment authorizing this TSCR be effective 30 days after issuance.