MONTHYEARML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4682022-01-28028 January 2022 ES-301-4 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2312021-04-13013 April 2021 Post Exam Submittal Letter ML21144A2382021-04-13013 April 2021 ES-301-6 ML21144A2582021-04-13013 April 2021 Scenarios ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A3032021-04-13013 April 2021 Administered RO Written Exam ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A2152021-04-13013 April 2021 ES-401-4 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A2682021-04-13013 April 2021 SRO Admin JPM 2023-09-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2102021-04-13013 April 2021 Ile Outline Review Comments ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2302021-04-13013 April 2021 ES-403-1 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3202021-04-13013 April 2021 ES-401-1 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3102021-04-13013 April 2021 Administered Sim JPM ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21145A0442021-04-13013 April 2021 Operating Test Outline Submittal Letter ML21145A0362021-04-13013 April 2021 ES-201-2 ML21145A0402021-04-13013 April 2021 ES-301-5 2023-09-15
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301
@
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. RCIC / Task 331001.04 / Manually Startup RCIC System / JPM204 A, D, P, EN, 2 217000 A4.04 3.6/3.6 L, S
- b. Reactor/Turbine Pressure Regulating System / Task 381201.01 A, M, S 3 Turbine On Line Tests (AP) / JPM517 / 241000 A4.19 3.5/3.4
- c. Main and Reheat Steam System / Task 441109.01 / Equalize Around D, L, S 4 and Open MSIVs per CPS 4411.09 / JPM 436 / 239001 A4.01 4.2/4.0
- d. Plant Ventilation Systems / Task 340801.36 / Startup CCP in Filtered N, S 9 Mode / JPM518 / 288000 A4.01 3.1/2.9
- e. Auxiliary Power / Task 350101.23 / Transfer 6900V Bus 1A and 1B From A, D, S 6 Main To Reserve Source (Alternate Path) / JPM 521 / 262001 A4.01 3.4/3.7
- f. RPS / Task 903116.01 / Perform a Manual Scram Functional/SDV Hi N, S 7 Level Bypass Test / JPM519 / 212000 A4.02 3.6/3.7
- g. Instrument Air System / Task 310101.08 / Restore ADS Air Supply To A, D, S 8 Normal Source / JPM 427 / 300000 A4.01 2.6/2.7
- h. PCIS/NSSS / Task 400102.99 / Verify Group 15 Automatic Isolation / A, EN, L, N, 5 JPM520 / 223002 A4.06 3.6/3.7 S
- i. SCRAM Condition Present and Reactor Power above Downscale or D, R, E 1 Unknown / Task 441108.01 / Defeat ATWS Interlocks / JPM 283 /
295037 A1.03 4.1/4.1
- j. High Suppression Pool Water Level / Task 441105.01 / High Containment D, R, E 5 Level Protective Actions / JPM 222 / 295029 2.4.35 3.8/4.0
- k. DC Distribution / Task 350301.17 / Cross Connect DC Distribution Panels D, R 6 1E and 1F / JPM 065 / 263000 2.1.30 4.4/4.0
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301
@
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. RCIC / Task 331001.04 / Manually Startup RCIC System / JPM204 A, D, P, EN, 2 217000 A4.04 3.6/3.6 L, S
- b. Reactor/Turbine Pressure Regulating System / Task 381201.01 A, M, S 3 Turbine On Line Tests (AP) / JPM517 / 241000 A4.19 3.5/3.4
- c. Main and Reheat Steam System / Task 441109.01 / Equalize Around D, L, S 4 and Open MSIVs per CPS 4411.09 / JPM 436 / 239001 A4.01 4.2/4.0
- e. Auxiliary Power / Task 350101.23 / Transfer 6900V Bus 1A and 1B From A, D, S 6 Main To Reserve Source (Alternate Path) / JPM 521 / 262001 A4.01 3.4/3.7
- f. RPS / Task 903116.01 / Perform a Manual Scram Functional/SDV Hi N, S 7 Level Bypass Test / JPM519 / 212000 A4.02 3.6/3.7
- g. Instrument Air System / Task 310101.08 / Restore ADS Air Supply To A, D, S 8 Normal Source / JPM 427 / 300000 A4.01 2.6/2.7
- h. PCIS/NSSS / Task 400102.99 / Verify Group 15 Automatic Isolation / A, EN, L, N, 5 JPM520 / 223002 A4.06 3.6/3.7 S
- i. SCRAM Condition Present and Reactor Power above Downscale or D, R, E 1 Unknown / Task 441108.01 / Defeat ATWS Interlocks / JPM 283 /
295037 A1.03 4.1/4.1
- j. High Suppression Pool Water Level / Task 441105.01 / High Containment D, R, E 5 Level Protective Actions / JPM 222 / 295029 2.4.35 3.8/4.0
- k. DC Distribution / Task 350301.17 / Cross Connect DC Distribution Panels D, R 6 1E and 1F / JPM 065 / 263000 2.1.30 4.4/4.0
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301
@
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. RCIC / Task 331001.04 / Manually Startup RCIC System / JPM204 A, D, P, EN, 2 217000 A4.04 3.6/3.6 L, S
- g. Instrument Air System / Task 310101.08 / Restore ADS Air Supply To A, D, S 8 Normal Source / JPM 427 / 300000 A4.01 2.6/2.7
- h. PCIS/NSSS / Task 400102.99 / Verify Group 15 Automatic Isolation / A, EN, L, N, 5 JPM520 / 223002 A4.06 3.6/3.7 S
- i. SCRAM Condition Present and Reactor Power above Downscale or D, R, E 1 Unknown / Task 441108.01 / Defeat ATWS Interlocks / JPM 283 /
295037 A1.03 4.1/4.1
- k. DC Distribution / Task 350301.17 / Cross Connect DC Distribution Panels D, R 6 1E and 1F / JPM 065 / 263000 2.1.30 4.4/4.0
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator