MONTHYEARML24228A1922024-07-29029 July 2024 Request for Additional Information Response Due Date Extension E-Mail String ML24192A3642024-06-21021 June 2024 State Rad Health Reply Email Re Draft Environmental Assessment for the Three Mile Island Unit 2 ML24011A2332024-01-11011 January 2024 Request for Additional Information - License Amendment Request (ML23058A064) (EPID L-2023-LLA-0026 - Three Mile Island, U2: Amendment Historic and Cultural Resources) ML24130A2692023-08-30030 August 2023 TMI-2 Consultation Invitation Letter PSA Reply ML24130A2652023-08-21021 August 2023 TMI-2 Consultation Invitation Letter Reply from CAP ML23187A0202023-06-29029 June 2023 TMI Unit 2 – RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23135A3992023-05-12012 May 2023 (External_Sender) Section 106 Consultation - NRC NHPA for Three Mile Island Unit 2 ML23159A1642023-05-11011 May 2023 Email TMI-2 Pol Am. 67 SE Minor Discrepancies ML23107A2232023-04-14014 April 2023 – Response Re State Consultation-TMI-2 Solutions - Draft EA Fonsi Criticality Exemption Request ML23094A1482023-03-30030 March 2023 TMI-2 TS 6.0 Draft Wording Agreement ML23090A2142023-03-30030 March 2023 Asnyder, NRC Email from Tdevik, Energysolutions, Three Mile Island, Unit 2 -Response Regarding MC&A TS Change, Modification ML23094A0602023-03-30030 March 2023 TMI-2 Response on Draft TS Wording ML23068A4682023-03-0909 March 2023 – Response Re State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23057A0062023-02-24024 February 2023 State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23051A0412023-02-15015 February 2023 Email from TMI-2 Solutions Regarding Commitment Date, Dated 02/15/2023 ML22364A1942022-12-30030 December 2022 Email Mitigation for Hydrogen Concerns Commitment, Dated December 30, 2022 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22321A0072022-11-16016 November 2022 Material Control and Accounting RAI Response Clarification Call Docket No 50-320 ML23069A1582022-09-22022 September 2022 – NRC Response TMI-2 Solutions Exemption Question ML22214A0482022-08-0101 August 2022 TMI-2 Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan - Revised Modified License Condition 2.C(2) ML22208A0492022-07-21021 July 2022 State Consultation Response: License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22199A2762022-07-18018 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PDEP, Regarding State Consultation Proposed Conforming Amendment Related to Proposed Exemption Request from Certain Record Retention Requirements ML22199A2772022-07-15015 July 2022 E-mail Attachment: Federal Register Notice - Volume 87 ML22189A2032022-07-0808 July 2022 E-mail from A. Snyder, NRC, to B. Werner, PA Department of Environment Protection - Three Mile Island, Unit 2 - State Consultation - License Amendment Request TMI-2 Solutions Physical Materials Security Plan ML22189A2042022-06-28028 June 2022 NRC-2022-0131-0001_Content - Federal Register Vol. 87, No. 123 ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22131A1382022-05-10010 May 2022 E-mail from T. Devik, Energysolutions TMI-2, to A. Snyder, NRC, Physical Security Plan May 9 Submittal Typo Correction ML22125A0162022-05-0303 May 2022 Email from T Devik to a Snyder: Three Mile Island 2 - Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - May 3, 2022 Response Courtesy Copy ML22125A0102022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania Response ML22125A0092022-05-0303 May 2022 Proposed Action- Proposed Fonsi for TMI-1 Exemption Request from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Notification of Commonwealth of Pennsylvania ML22125A0132022-04-28028 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition - Partial Response ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0212022-04-19019 April 2022 Security Plan Proposed Revision License Condition 2.C.(2) (EPID: L-2021-LLA-0103) Proposed License Condition ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22102A3062022-03-31031 March 2022 Email from T. Divik, Energy Solutions, to A. Snyder Clarification of Security License Condition Amendment Request ML22094A1812022-03-22022 March 2022 Licensee High Confidence Dates for Submittals ML22108A1022022-03-18018 March 2022 Email from A. Snyder, NRC to G. Van Noordennen, Energy Solutions, Clarification Request - September 21, 2021 Supplement- TMI-2 Physical Security Plan LAR ML22090A0142022-03-17017 March 2022 TMI, Unit 1 - Commonwealth of PA Response to Request for Consultation on the Proposed Revision to the License and the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Sp ML22070A1202022-03-10010 March 2022 E-mail from S. Acker, PADEP, to A. Snyder, NRC - Three Mile Island Unit 1, State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License Amendment Request ML22068A1792022-03-0909 March 2022 Email from a Snyder to Acker State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Emergency Plan and Emergency Action Level Scheme ML22068A1672022-03-0909 March 2022 Email from a Snyder to Acker State Consultation - License Amendment Request TMI-1 in Support of the ISFSI Only Security Plan License ML22068A1462022-03-0909 March 2022 Email from a Snyder to Acker Three Mile Island Unit 1, State Consultation- License Amendment Request TMI-1 in Support of the ISFSI Only Tech Spec License Amendment Request ML22090A0232022-03-0909 March 2022 Email from A. Snyder, NRC to Craig Smith, Constellation Energy Generation, License Amendment Request - Proposed ISFSI-Only Technical Specifications, Dated March 9, 2022 ML22047A2392022-02-16016 February 2022 E-mail from D. Kenney to A. Snyder Dated 2/16/2022 TMI Unit 1 Typo Correction to February 8, 2022 Submittal ML22038A9352022-02-0707 February 2022 TMI-2 Pdms LAR Email Dated 2/7/2022 from T. Smith, NRC to G. Van Noordennen ML22034A6702022-02-0303 February 2022 LTR-22-0020 Eric Epstein, E-mail Follow-up on Decommissioning and Tax Question from December 8, 2021 on TMI Cleanup Funding, Docket Id NRC-2021-0230 - Region I Response ML22343A1612021-11-0909 November 2021 SHPO Email 11-9-2021 Alowery to Gvannoordennen and Hpell ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21230A3812021-08-18018 August 2021 TMI-1 ISFSI-Only Security Plan License Amendment Request 2024-07-29
[Table view] |
Text
Tiffi Do ug From: Dacus,,Eugene Sent: Monday, November 23, 2009 9:41 AM To: Tifft, Doug
Subject:
-
RE: TMI update Doug --what update can we provided for congress?
We're getting inquires about updates.From: Tifft, Doug Sent: Monday. November 23, 2009 7:56 AM To: Powellr, Amy;,;Dacus, Eugene; Weil, Jenny SubjectýVFW:
TMI update FYI: Here is the latest. Came just after I. sent my previous email...Note:it is marked as, INTERNAL ONLY information.
Give me a call if you have any questions.-Doug Regional state Liaison Officer Office: ,-610-337-6L18 Cell: 484791;9-2198 From: Clifford, James '-Sent: Monday, November 23, 2009 7:52 AM To: Collins, Sam Cc: Barber, Scott; White, John; Roberts, Darrell; Nimitz, Ronald; Bellamy, Ronald; Tifft, Doug; Screnci, Diane; Sheehan, Neil
Subject:
TMI update Sam, An update from the resident staff from last night. After we received this information, Bill Noll updated Dave Lew with additional information that the-licensee was proceeding with limited outage work inside containment, beyond surveys and decontamination.
We passed this on last night to Dave Spindler to ensure he maintained cognizance-of any significant activities.
Ourrnext.steps remain following thetlicensee's actions to determine the root cause(s) of the contamination, and followup ohnthe licensee's evaluation of the personnel contaminations.
Jim Note: This.is INTERNAL Preliminary Background Information.
Status will be updated in the morning.As of, 1930 on November 22, 2009.Updates in Bold 2 ftf ISSUE
SUMMARY
Three Mile Island airborne contamination results in workers being contaminated and requiring decontamination.
BACKGROUND At about 1600 Saturday Nov 21, TMI experienced alarms inside the containment due to high airborne contamination levels. TMI is shutdown and replacing their steam generators.
The containment was evacuated of approximately 175 workers. 144 workers were processed through a whole body counter with 19 of these workers > 10mrem (16 were between 10 and 20 mrem, 2 were between 20 and 30 mrem, and 1 was between 30 and 40 mrem). Work had been stopped inside containment.
Radiation protection has surveyed the containment and surface contamination from the event has been identified.
Currently, the only work allowed in containment is encapsulating the "A" Steam Generator and decontamination activities associated with the steam generator replacement.
The licensee is performing a root cause evaluation for this event.Cutting was being performed to support removal of the "B" steam generator along with some welding. The "A SG, although cut and off its pedastel, remains fully inside the containment, although there is a cut of the containment to support SG movement which had a plastic covering.
The inside side of the plastic tarp was contaminated and is currently in the process of being replaced.
Surveys for contamination at the containment cut and just outside the cut have shown no levels of contamination.
A call through the HOO was held (- 2130 11/21) to understand our next steps (licensee outage manager provided us an update). Diane Screnci is available to respond to media calls, Nancy McNamara has reached out to Pennsylvania, and the HOO is making contact with DHS, indicating no need for a federal reaction.
There has been media interest and calls from other federal agencies.
Next steps include Ron Nimitz assessing possible specialist support onsite. Dave Spindler will assist Javier Brand in regulatory oversight for the week.LICENSEE ACTIONS 1. Restrict work activities in containment until an apparent cause has been determined.
- 2. The licensee will ensure that the containment be maintained at a negative pressure with respect to atmosphere.
Currently the Exhaust fans are on and the Supply fans are off and the containment is being maintained in a negative pressure.3. The licensee is in the process of replacing the plastic tarp over the maintenance opening.4. Encapsulate the "A" steam generator contamination from the airborne contamination.
- 5. Perform a root cause to understand what actually occurred.a. Currently there are 4 suspected scenarios, 1. A wet vacuum cleaner caused the release 2.Failure of a separate HEPA filter in containment
- 3. Welding activities on the "B" Steam Generator cold leg drain 4. Changes in ventilation caused contamination to be stirred and become airborne 6. Perform follow-up dose measurements on the 19 contaminated individuals.
NRC'S ACTIONS 1. Region I PAO (Diane Screnci), DRS Branch Chief (John White) and a Senior Health Physicist (Ron Nimitz)visit the site and perform a press briefing.
Completed 2. Senior Health Physicist to monitor licensee performance on site.3. Resident Inspectors to monitor licensee remaining outage activities.
- 4. Review licensee root cause evaluation
- 5. Continue public outreach activities and to inform news media as necessary OBSERVATIONS
- 1. The licensee is performing minimal work in the containment until the event is fully understood.
3
- 2. The licensee still does not understand what actually caused the airborne and is continuing to evaluate.
This is key before allowing most work to resume in containment.
4