ML15182A038

From kanterella
Revision as of 20:23, 20 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
DTE Supplemental Disclosures July 2015
ML15182A038
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/01/2015
From: Christinidis J, Reddick D, Tanya Smith
DTE Electric Company, Winston & Strawn, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-341-LR, ASLBP 14-933-01-LR-BD01, RAS 28000
Download: ML15182A038 (6)


Text

July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )

)

)

) Docket No. 50-341-LR APPLICANT'S SUPPLEMENTAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336, the Joint Motion on Mandatory Disclosures dated February 23, 2015, and the Licensing Board's Order, dated February 27, 2015, DTE Electric Company ("DTE" or "Applicant"), hereby supplements its disclosures with respect to the admitted contentions.

1. Testifying Witnesses DTE has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), DTE will supplement this disclosu re after testifying witnesses are identified. 2. Documents and Data Collections A description by category of all non-privileged documents and data compilations in the possession, custody, or control of DTE that are relevant to the admitted contentions and subject to disclosure under the parties' disclosure agreement is provided in Attachment A. DTE did not identify any proprietary documents that are relevant to the admitted contentions and

subject to disclosure under the parties' disclosure agreement.

2 3. Tangible Things Other than documents provided or listed, no relevant tangible things have been identified.

Respectfully submitted,

/s/ signed electronically by Tyson R. Smith Darani M. Reddick Winston & Strawn LLP

1700 K Street, NW

Washington, DC 20006 Jon P. Christinidis DTE Electric Company

One Energy Plaza

Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015

DC:775605.1 Fermi2LicenseRenewal DTESupplementalDisclosuresJuly2015PUBLIC AttachmentA DocIDDateAuthorRecipientDescriptionContentionDTE005505/14/2015MichaelJKoenemannRandallDWestmorelandRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005515/28/2015 NRC SummaryofMarch27,2015conferencecallbetweenNRCandDTE JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005525/8/2015DTENRCDTEReponsetoSAMARAIs JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005535/14/2015AngelaRudolph RandallWestmoreland;MichaelLake;MichaelKoenemannRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005545/5/2015Enercon Fermi2WinMACCSAssessmentofSevereAccidentConsequences,Rev.1 JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005555/5/2015DTE DTE RAIResponseReviewandApprovalRecordCRAFT 8-SAMAPopulations July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )

)

)

) Docket No. 50-341-LR CERTIFICATION OF SUPPLEMENTAL DISCLOSURES I, Jon P. Christinidis do hereby state as follows:

1. I am employed as Expert Attorney - Regulatory and Nuclear for DTE Electric Company. Working with other attorneys for the Applicant, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336.
2. A search was conducted of documents, data compilations, and tangible things under the custody and control of the Applicant for the types of information specified in 10 C.F.R. § 2.336(a). The search was based on information and documents reasonably available to the Applicant. The searches encompassed both electronic and paper documents.
3. I hereby certify that to the best of my knowledge, information, and belief all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(a) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of May 30, 2015.
4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.

2 Executed in accord with 10 C.F.R. § 2.304(d), /s/ signed electronically by Jon P. Christinidis DTE Electric Company

One Energy Plaza

Detroit, Michigan 48226 Dated at Detroit, Michigan

this 1st day of July 2015

DC:775606.1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )

)

)

) Docket No. 50-341-LR CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing "APPLICANT'S SUPPLEMENTAL DISCLOSURES" and "CERTIFICATION OF SUPPLEMENTAL DISCLOSURES" have been served via the Electronic Information Exchange ("EIE") this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.

Respectfully submitted,

/s/ signed electronically by Darani M. Reddick Winston & Strawn LLP

1700 K Street, NW

Washington, DC 20006 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015