ML15182A038
ML15182A038 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 07/01/2015 |
From: | Christinidis J, Reddick D, Tanya Smith DTE Electric Company, Winston & Strawn, LLP |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-341-LR, ASLBP 14-933-01-LR-BD01, RAS 28000 | |
Download: ML15182A038 (6) | |
Text
July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
APPLICANTS SUPPLEMENTAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336, the Joint Motion on Mandatory Disclosures dated February 23, 2015, and the Licensing Boards Order, dated February 27, 2015, DTE Electric Company (DTE or Applicant), hereby supplements its disclosures with respect to the admitted contentions.
- 1. Testifying Witnesses DTE has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), DTE will supplement this disclosure after testifying witnesses are identified.
- 2. Documents and Data Collections A description by category of all non-privileged documents and data compilations in the possession, custody, or control of DTE that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement is provided in Attachment A. DTE did not identify any proprietary documents that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement.
- 3. Tangible Things Other than documents provided or listed, no relevant tangible things have been identified.
Respectfully submitted,
/s/ signed electronically by Tyson R. Smith Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015 2
DC:775605.1
Fermi 2 License Renewal Attachment A DTE Supplemental Disclosures July 2015 PUBLIC Doc ID Date Author Recipient Description Contention DTE00550 5/14/2015 Michael J Koenemann Randall D Westmoreland Revised Calculation and RAI Response CRAFT8 - SAMA Populations Summary of March 27, 2015 conference call JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00551 5/28/2015 NRC between NRC and DTE Populations JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00552 5/8/2015 DTE NRC DTE Reponse to SAMA RAIs Populations Randall Westmoreland; Michael Lake; Michael DTE00553 5/14/2015 Angela Rudolph Koenemann Revised Calculation and RAI Response CRAFT8 - SAMA Populations Fermi 2 WinMACCS Assessment of Severe JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00554 5/5/2015 Enercon Accident Consequences, Rev. 1 Populations DTE00555 5/5/2015 DTE DTE RAI Response Review and Approval Record CRAFT8 - SAMA Populations
July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
CERTIFICATION OF SUPPLEMENTAL DISCLOSURES I, Jon P. Christinidis do hereby state as follows:
- 1. I am employed as Expert Attorney - Regulatory and Nuclear for DTE Electric Company. Working with other attorneys for the Applicant, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336.
- 2. A search was conducted of documents, data compilations, and tangible things under the custody and control of the Applicant for the types of information specified in 10 C.F.R. § 2.336(a). The search was based on information and documents reasonably available to the Applicant. The searches encompassed both electronic and paper documents.
- 3. I hereby certify that to the best of my knowledge, information, and belief all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(a) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of May 30, 2015.
- 4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.
Executed in accord with 10 C.F.R. § 2.304(d),
/s/ signed electronically by Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 Dated at Detroit, Michigan this 1st day of July 2015 2
DC:775606.1
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing APPLICANTS SUPPLEMENTAL DISCLOSURES and CERTIFICATION OF SUPPLEMENTAL DISCLOSURES have been served via the Electronic Information Exchange (EIE) this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.
Respectfully submitted,
/s/ signed electronically by Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015