ML15152A467
ML15152A467 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 06/01/2015 |
From: | Christinidis J, Reddick D, Tanya Smith DTE Electric Company, Winston & Strawn, LLP |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-341-LR, ASLBP 14-933-01-LR-BD01, RAS 27876 | |
Download: ML15152A467 (7) | |
Text
June 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
APPLICANTS SUPPLEMENTAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336, the Joint Motion on Mandatory Disclosures dated February 23, 2015, and the Licensing Boards Order, dated February 27, 2015, DTE Electric Company (DTE or Applicant), hereby supplements its disclosures with respect to the admitted contentions.
- 1. Testifying Witnesses DTE has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), DTE will supplement this disclosure after testifying witnesses are identified.
- 2. Documents and Data Collections A description by category of all non-privileged documents and data compilations in the possession, custody, or control of DTE that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement is provided in Attachment A. DTE did not identify any proprietary documents that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement.
- 3. Tangible Things Other than documents provided or listed, no relevant tangible things have been identified.
Respectfully submitted,
/s/ signed electronically by Tyson R. Smith Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of June 2015 2
DC:774308.1
Fermi 2 License Renewal DTE Supplemental Disclosures June 2015 PUBLIC Doc ID Date Author Recipient Description Contention Fermi 2 2014 Annual Radioactive Effluent DTE00474 DTE Release Report CRAFT2 Walpole DTE00475 4/23/2015 Joe Lavelline Michael Lake Conversation about SAMA with Gary CRAFT8 - SAMA Populations DTE00476 4/24/2015 Michael A Lake Michael J Koenemann Fw: Conversation about SAMA with Gary CRAFT8 - SAMA Populations JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00477 4/13/2015 DTE NRC RAI Responses SAMAs Populations DTE00478 4/22/2015 M. Koenemann CRAFT8 - SAMA Populations Permanent, Transient, and Total Population DTE00479 4/14/2015 Enercon DTE Porjection in Sectors CRAFT8 - SAMA Populations DRAFT Fermi 2 WinMACCS Assessment of DTE00480 4/1/2015 Enercon DTE Severe Accident Consequences Rev. 1 CRAFT8 - SAMA Populations DRAFT Fermi 2 WinMACCS Assessment of DTE00481 4/1/2015 Enercon DTE Severe Accident Consequences CRAFT8 - SAMA Populations Michael A Lake; Michael J Koenemann; Lynne S JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00482 5/6/2015 Randall D Westmoreland Goodman; Angela Rudolph Revised Calculation and RAI Response Populations Fermi 2 WinMACCS Assessment of Severe JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00483 5/5/2015 Enercon DTE Accident Consquences Populations DTE00484 5/5/2015 DTE NRC Fermi Round 3 RAI Response RAI 3 CRAFT8 - SAMA Populations DTE00485 4/2/2015 Randall D Westmoreland Gary Smith; Lynne S Goodman SAMA Responses CRAFT8 - SAMA Populations Chad Cramer; Gary Smith; Brian Norman; Marvin Morris; Angela Rudolph; Lynne S DTE00486 4/6/2015 Randall D Westmoreland Goodman Estimated Delivery of SAMA responses CRAFT8 - SAMA Populations JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00487 4/9/2015 NRC DTE NRC Request for Additional Information Populations DTE00488 DTE Fermi 2 NPDES WATER TREATMENT ADDITIVES CRAFT2 Walpole DTE00489 4/20/2015 Michael J Koenemann Randall D Westmoreland; Lynne S Goodman Fermi 2 SAMA RAI Responses CRAFT8 - SAMA Populations DTE00490 4/20/2015 Lynne S Goodman Michael J Koenemann; Michael A Lake Fermi 2 SAMA RAI Responses CRAFT8 - SAMA Populations DTE00491 4/22/2015 Chad Cramer Lynne S Goodman; Gary Smith; Marvin Morris RAI Question 3 Response CRAFT8 - SAMA Populations RAI Response Review and Approval Record DTE00492 4/22/2015 Round 3 RAIs DTE00493 4/22/2015 Lynne S Goodman Chad Cramer RAI Question 3 Response CRAFT8 - SAMA Populations Lynne S Goodman; Randall Westmoreland; Gary DTE00494 4/29/2015 Chad Cramer Smith; Marvin Morris DRAFT RAI Response to Question 3 CRAFT8 - SAMA Populations DTE00495 4/22/2015 M. Koenemann DRAFT Response to RAI Round 3 CRAFT8 - SAMA Populations Angela Rudolph; Randall D Westmoreland; DTE00496 4/22/2015 Lynne S Goodman Kevin P Lynn DRAFT RAI Question 3 Response CRAFT8 - SAMA Populations Randall D Westmoreland; Lynne S Goodman; DTE00497 5/5/2015 Chad Cramer Gary Smith; Marvin Morris; Dave Mosby Revised Calculation and RAI Response CRAFT8 - SAMA Populations JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00498 5/1/2015 DTE DRAFT Response to RAIs Round 3 Populations DTE00499 5/5/2015 Randall D Westmoreland Angela Rudolph; Kevin P Lynn SAMA DATA for CDs CRAFT8 - SAMA Populations DTE00500 4/1/2015 DTE Fermi 2 316(b) application requirements CRAFT2 Walpole DTE00502 4/29/2015 Randall D Westmoreland Kevin P Lynn DRAFT RAI Response to Question 3 CRAFT8 - SAMA Populations JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00504 4/9/2015 NRC DTE NRC SAMA RAIs Populations 1 of 2
Fermi 2 License Renewal DTE Supplemental Disclosures June 2015 PUBLIC JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00506 5/1/2015 DTE DRAFT Response to NRC RAIs Populations 2 of 2
June 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
CERTIFICATION OF SUPPLEMENTAL DISCLOSURES I, Jon P. Christinidis do hereby state as follows:
- 1. I am employed as Expert Attorney - Regulatory and Nuclear for DTE Electric Company. Working with other attorneys for the Applicant, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336.
- 2. A search was conducted of documents, data compilations, and tangible things under the custody and control of the Applicant for the types of information specified in 10 C.F.R. § 2.336(a). The search was based on information and documents reasonably available to the Applicant. The searches encompassed both electronic and paper documents.
- 3. I hereby certify that to the best of my knowledge, information, and belief all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(a) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of April 30, 2015.
- 4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.
Executed in accord with 10 C.F.R. § 2.304(d),
/s/ signed electronically by Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 Dated at Detroit, Michigan this 1st day of June 2015 2
DC:774310.1
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing APPLICANTS SUPPLEMENTAL DISCLOSURES and CERTIFICATION OF SUPPLEMENTAL DISCLOSURES have been served via the Electronic Information Exchange (EIE) this 1st day of June 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.
Respectfully submitted,
/s/ signed electronically by Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of June 2015