MONTHYEARML18344A4142018-12-10010 December 2018 LER 1979-037-00 for Palisades Nuclear Plant, Two Manual Three Inch Containment Isolation Valves in Bypass Line Were Discovered to Be Locked Open 05000255/LER-2017-0022017-07-17017 July 2017 Reactor Protection System Actuation While the Reactor was Shutdown, LER 17-002-00 for Palisades Regarding Reactor Protection System Actuation While the Reactor was Shutdown 05000255/LER-2017-0012017-05-24024 May 2017 Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions, LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions PNP 2014-100, Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations2014-11-19019 November 2014 Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations PNP 2011-009, Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor2011-02-10010 February 2011 Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor ML0726101822007-09-14014 September 2007 Cancellation of Licensee Event Report 07-003, Potential for Reduced Component Cooling Water Cooling Capability ML0609002832006-03-30030 March 2006 Cancellation of Licensee Event Report 05-006, Inoperable Containment Due to Containment Air Cooler Through-Wall Flaws ML18347B2971998-05-19019 May 1998 Submit, NPDES Notification Report, Incident No. Pal-98-05-NC138 for NPDES Permit No MI0001457 Re Difference from Daily Maximum Effluent Limitation for Facility ML18348A9021989-02-0707 February 1989 LER 1988-005-01 for Palisades, Inadequate Procedure Results in Valve Testing During Prohibited Conditions ML18346A2471981-06-19019 June 1981 LER 1981-020-00 for Palisades Nuclear Plant, Pcs Unidentified Leakage Greater than 1.0 Gpm ML18346A2481981-05-13013 May 1981 LER 1981-015-00 for Palisades Nuclear Plant, Safety Injection Tank Boron Concentration ML18346A2491981-02-20020 February 1981 LER 1981-005-00 for Palisades Nuclear Plant, Update - Inoperable Diesel Generator ML18346A2501981-02-19019 February 1981 LER 1981-007-00 for Palisades Nuclear Plant, Inoperable Auxiliary Feedwater Pump ML18346A2511981-01-26026 January 1981 LER 1981-002-00 for Palisades Nuclear Plant, Inadequate Mounting of DC Distribution Panel ML18346A2521981-01-16016 January 1981 LER 1981-001-00 for Palisades Nuclear Plant, During Charging of Station Batteries, Output Breakers of Both Batteries Were Inadvertently Opened for Approximately One Hour ML18346A2531981-01-14014 January 1981 LER 1980-046-00 for Palisades Nuclear Plant, Hydraulic Snubber Failure ML18346A2541981-01-0707 January 1981 LER 1980-045-00 for Palisades Nuclear Plant, Low Condensate Makeup Inventory ML18347A8141980-10-10010 October 1980 LER 1980-037-00 for Palisades Nuclear Plant, Pipe Support Sway Struts Identified to Have the Potential of the Bushing Becoming Loose And/Or Disengaged from the Clamp End of the Sway Strut ML18347A8461980-08-27027 August 1980 License Event Report 1980-027-00 Re Gaseous Release, Extended Due Date of Reporting by Region III on 8/26/1980 ML18347A8471980-08-12012 August 1980 License Event Report 1980-024-00 Re Containment High Radiation Monitor ML18347A8481980-08-0808 August 1980 License Event Report 1980-023-00 Re Containment High Radiation Monitor ML18347A8491980-08-0808 August 1980 License Event Report 1980-022-00 Re Inoperable Nuclear Instrumentation ML18347A8501980-08-0606 August 1980 License Event Report 1980-021-00 Re Misaligned Containment Sump Valve ML18347A8521980-07-29029 July 1980 License Event Report 1980-020-00 Re Misaligned Control Rod ML18347B2071980-06-19019 June 1980 Licensee Event Report 80-018 Regarding Oil Level in Snubber No. 2 Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2081980-06-13013 June 1980 Licensee Event Reports 80-014, 80-015, and 80-016 Regarding Oil Level in Snubbers No. 5, 9, and 7 Were Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2091980-05-15015 May 1980 Licensee Event Report 80-012 Regarding Bottom Half of the Barrier for Fire Penetration HO-12 Was Missing During Inspection of Fire Barriers ML18347B2101980-05-14014 May 1980 License Event Report 1980-011-00 Re Improper Return-to-Service of Porv'S ML18348A9071980-05-12012 May 1980 Submittal of LER 1980-006-00 Purge Valve T-Ring Air Supplies ML18348A9051980-05-12012 May 1980 Submittal of LER 1980-008-00 Update of Valve Leakage ML18347B1411978-09-0606 September 1978 LER 1978-029-00 for Palisades Plant Re Lower Level of Hydrazine in Iodine Removal Tank Due to Approximately 6% of Drainage from the Tank T-102 ML18347B1421978-08-18018 August 1978 LER 1978-028-00 for Palisades Plant Re Containment Building Purge Valve T-Ring in CV-1806 Was Not Pressurized ML18347B1441978-08-11011 August 1978 LER 1978-022-00 for Palisades Plant Re Four Incore Alarms Following Reactor Start-up ML18347B1451978-08-10010 August 1978 LER 1978-021-00 for Palisades Nuclear Plant, Containment Purge Supply Valve CV-1808 Failed to Open During Monthly Test ML18347B1491978-07-20020 July 1978 LER 1978-024-00 & LER 1978-025-00 for Palisades Nuclear Plant, Steam Generator Ph Dropped to 8.02 & One of Two Heaters for T-53B (Concentrated Boric Acid Tank) Failed ML18347B1781978-04-28028 April 1978 License Event Report LER-78-000-00 Re Out-of-Sequence Rod Withdrawal ML18347B1801978-04-19019 April 1978 License Event Report 78-008: Cycle 2 Core Axial Power Distribution Limits of TS 3.10.3 Were Exceeded by Approximately 12% for Steady State Operation During Cycle 2 ML18347B1811978-03-27027 March 1978 License Event Report 1978-007-00 Relates to Electrical Connectors Inside of Containment ML18347B1841978-03-13013 March 1978 Two Updated License Event Reports, LER-78-004 & LER-78-006 ML18348A1951978-03-0202 March 1978 License Event Report 1978-006-00 Re Shipping Cask Movement ML18347B1851978-03-0202 March 1978 License Event Report 1978-005-00 Re Steam Generator Level Instrumentation ML18348A1961978-03-0101 March 1978 License Event Report 1978-004-00 Re Steam Generator Pressure Instrumentation ML18348A1981978-02-0101 February 1978 License Event Report 1978-003-00 Re CV-3025 Failed Closed ML18348A1971978-02-0101 February 1978 License Event Report 1977-065-00 Re Operation in a Degraded Mode Permitted by a Limiting Condition for Operation ML18348A1991978-01-20020 January 1978 LER 1977-063-00 Re Iodine Removal System Hydrazene Tank, LER 1978-001-00 Re Containment Door Interlock Failure & LER 1978-002-00 Re Setpoints of Five Valves Were Outside Band ML18348A2001978-01-0606 January 1978 License Event Report 1977-062-00 Re Iodine Removal System Naoh Tank (T-103) ML18348A2011978-01-0606 January 1978 License Event Report 1977-064-00 Re HPSI Pump P-66B ML18348A2021977-12-21021 December 1977 LER 1977-054-00 Re Four Coincident In-Core Alarms, LER 1977-057-00 Re Pressure Set Point for Channel C, & LER 1977-058-00 Re De-Energized R Bus ML18348A2031977-12-16016 December 1977 License Event Report 1977-055-00 Re Loss of Off-Site Power and Plant Trip ML18348A2041977-12-12012 December 1977 License Event Report 1977-056-00 Re Gaseous Waste Discharge 2018-12-10
[Table view] |
Text
Attachment to Licensee Event Report 79-037 Consumers Pover Company Palisades Uuclear Plant Docket 50-255 Event Descrintion On September 11, 1979, during performance of a local leak test *of Containment Building (CB) penetration 4a {CB exhaust valves bypass*), the tvo manual inch containment isolation valves in the bypass line were discovered to be locked open. At the time of discovery, the reactor was in a cold shutdown condition.
A preliminary investigation was performed, and on September 14, it was determined that contrary to the requirements of Technical Specification 3.6.l, containment integrity had been breached during power operation.
Accordingly, *on September 14, 1979, this occurrence was deemed reportable per Technical Specification 6.9.2.a.(3) (abnormal degradation of the containment boundary).
Chronology of Events/Cause Descrintion On April 5, 1978, the HEPA filter in the CB exhaust valves bypass line was changed. In order to demonstrate the operability of the replacement filter, it vas functionally tested in accordance vith an approved test procedure.
Opening of the two three-inch manual isolation valves was required in order to obtain adequate flow through the filter. At the time the valves w-ere opened on April 6, 1978, the reactor was in a refueling shutdown condition, and containment integrity require!?lents vere satisfied.
At the conclusion of the test; however, the valves were apparently not closed, and the subsequent plant start-up took place with containment integrity requirements not met. The following elements a.re considered to be key factors related to this occ'...lrrence:
- The surveillance procedure governing the filter testing activities did not *have adequate provisions for returning the system to normal .
- The tvo valves in question were not on the valve.line-up sheet vhich vas used to verify containment integrity prior to the plant start-up at the end of the refueling outage. No evidence of an administrative review of the completed test procedure exists. An administrative review would have provided an opportunity to address system status, and might have led to discoverJ of the improper valve line-up prior to returning to power. Corrective Actions
- Upon discovery, the affected valves were closed and locked in that position *
- The surveillance procedure which governs the filter testing will be revised such that return to se!"V'ice require!Jlents a!"e adequately addressed.
In addition, all surveillance, cperating and other procedures vhich could impact on contai:::iment integrity will be reviewed and revised as necessary to assure that containment integrity requirements are satisfied.
- Also referred to in the FSAR as the post-accident hydrogen purge line. (over) l ...___________
_____ _ 2
- The manual valves in the CB exhaust valves bn:>ass line will be added to the containment integrity valve line-up checklist.
In addition, prints will be reviewed to verify all containment integrity isolation valves are included on the checklist, and a valkdown of all piping vhich penetrates the containment building will be made to verify print and checklist accuracy *
- This occur:-ence will be reviewed 'With atrolicable plant personnel.
The requi:r:-ement to rigorously' follow procedures (ie, obtain administrative revievs when required) will be stressed.
- The fU!lction of the CB exhaust valves bypa.Ss 'Will be evaluated, and if possible, the line will be capped. Probable Conseauences An evaluation of the consequences of this occurrence is still in progress * . The major elE:!!lents
'Will be investigated:
- The magnitude of the actual release to the main stack will be either calculated o:-estimated
- The of:-site ef:ects during a postulated loss of coolant accident,will be estimated.
To do this, consideration
'Will be given to the operation of the hydrogen purge regulating valve (CV-1804) and the downstream HEPA filter *