ENS 40855
ENS Event | |
---|---|
21:00 Jul 7, 2004 | |
Title | Nrc Bulletin 91-01 - 4 Hour Report |
Event Description | The following was submitted via email:
Reason for Notification A canvas lined cart was found in the UF6 [Uranium Hexafluoride] bay. The cart dimensions met the criteria for a non favorable geometry [NFG] container however slits had been cut into the bottom of the cart. The presence of the slits makes it questionable as to whether or not this is a true NFG. Taking a conservative approach and assuming that the cart is an NFG, its presence in the Chemical area is prohibited by SNM-1107, Section 6.1.4 without a nuclear criticality safety analysis. In accordance with Westinghouse Operating License (SNM-1107), paragraph 3.7.3 (b.2), this event satisfies the criteria for a 4-hour notification. Specifically, any determination that a criticality safety analysis or evaluation was deficient, or that a particular system was not previously analyzed; and that less than two unlikely, independent, and concurrent changes in process conditions would be required before a criticality accident would be possible. As Found Condition An NCS [Nuclear Criticality Safety] Engineer was notified by a member of the EH&S [Environmental Health and Safety] Department that a canvas cart was in the UF6 bay. The canvas cart had several slits approximately five inches in length cut in the bottom that would preclude the build-up of liquid materials. There was no process equipment in the general area where the cart was located. There was no SNM [Special Nuclear Material] in the cart and the cart was not a part of any existing process. Summary of Activity -The cart was dismantled immediately. -NCS notified NRC Region II of the cart. Conclusions -This particular system was not previously analyzed for criticality safety. -There was no SNM involved. -At no time was the health or safety to any employee or member of the public in jeopardy. No exposure to hazardous material was involved. -The Incident Review Committee (IRC) has determined that this is a safety significant incident in accordance with governing procedures. -A causal analysis will be performed. The Licensee notified Region 2 (Ayres, Crespo). |
Where | |
---|---|
Westinghouse Electric Corporation Columbia, South Carolina (NRC Region 2) | |
License number: | Snm-1107 |
Reporting | |
Response | |
Time - Person (Reporting Time:+-1.88 h-0.0783 days <br />-0.0112 weeks <br />-0.00258 months <br />) | |
Opened: | C. Snyder 19:07 Jul 7, 2004 |
NRC Officer: | John Mackinnon |
Last Updated: | Jul 7, 2004 |
40855 - NRC Website | |
Westinghouse Electric Corporation with Response | |
WEEKMONTHYEARENS 419332005-08-19T19:30:00019 August 2005 19:30:00
[Table view]Response Nrc Bulletin 91-01 Violation of Criticality Spacing Requirements ENS 417232005-05-20T22:40:00020 May 2005 22:40:00 Response, Part 70 App A (B)(5) Deviation from Integrated Safety Analysis, and a 24 Hour Notification - Bulletin 91-01 Criticality Control ENS 414182005-02-17T17:00:00017 February 2005 17:00:00 Response, Part 70 App A (B)(1) 24 Hour 91-01 Response Bulletin and Part 70 App a Unanalyzed Condition ENS 413722005-02-04T14:00:0004 February 2005 14:00:00 Response 24-Hour Notification-Bulletin 91-01 Criticality Control ENS 409852004-08-24T14:05:00024 August 2004 14:05:00 Response 24 Hour 91-01 Response Bulletin ENS 408882004-07-21T13:00:00021 July 2004 13:00:00 Response 4-Hour 91-01 Nrc Bulletin Notification Due to Adu in Non-Favorable Geometry Nitrogen Accumulator Tank ENS 408552004-07-07T21:00:0007 July 2004 21:00:00 Response Nrc Bulletin 91-01 - 4 Hour Report ENS 407932004-06-04T22:00:0004 June 2004 22:00:00 Response Licensee Reported a 4 Hour 91-01 Response Bulletin ENS 405672004-03-04T20:00:0004 March 2004 20:00:00 Response 24-Hour Notification - Bulletin 91-01 Criticality Control ENS 404402004-01-12T20:45:00012 January 2004 20:45:00 Response 24 Hour Notification Bulletin 91-01 Criticality Control ENS 402552003-10-16T19:30:00016 October 2003 19:30:00 Response 24 Hour Bulletin 91-01 Notification from Westinghouse Columbia Fuel Facility ENS 402462003-10-14T11:30:00014 October 2003 11:30:00 Response 24-Hour Nrc 91-01 Bulletin Report Involving Improper Mass Control ENS 401522003-09-12T14:32:00012 September 2003 14:32:00 Response Improper Scanning of Lead Rods for the Product Engineering Laboratory 2005-08-19T19:30:00 | |