ML061180349 | |
Person / Time | |
---|---|
Site: | Kewaunee ![]() |
Issue date: | 04/28/2006 |
From: | Louden P L Division of Nuclear Materials Safety III |
To: | |
References | |
PNO-III-06-012 | |
Download: ML061180349 (1) | |
Similar Documents at Kewaunee | |
---|---|
Category:NRC Preliminary Notification of Event/Occurrence
MONTHYEARPNO-III-12-013, Planned Shutdown and Decommissioning of Kewaunee Power Station2012-10-23023 October 2012
[Table view]PNO-III-12-013: Planned Shutdown and Decommissioning of Kewaunee Power Station PNO-III-09-002, Kewaunee Unplanned Shutdown Due to Main Steam Pressure Instruments Not Calibrated as Required2009-04-20020 April 2009 PNO-III-09-002 - Kewaunee Unplanned Shutdown Due to Main Steam Pressure Instruments Not Calibrated as Required PNO-III-07-004, A - Kewaunee Reactor Shutdown (Update)2007-03-12012 March 2007 PNO-III-07-004A - Kewaunee Reactor Shutdown (Update) ML0706004812007-03-0101 March 2007 PNO-III-07-004: Kewaunee Reactor Shutdown PNO-III-06-022, Kewaunee Reactor Shutdown and Startup2006-11-14014 November 2006 PNO-III-06-022: Kewaunee Reactor Shutdown and Startup PNO-III-06-019, Kewaunee: Tritium Detected in Groundwater Beneath Plant Buildings2006-08-14014 August 2006 PNO-III-06-019 Kewaunee: Tritium Detected in Groundwater Beneath Plant Buildings PNO-III-06-014, Kewaunee, Procedure Adherence Problems During Reactor Startup2006-05-23023 May 2006 PNO-III-06-014, Kewaunee, Procedure Adherence Problems During Reactor Startup PNO-III-06-012, A: Kewaunee: Manual Reactor Shutdown Following Feedwater Pump Trip (Update)2006-05-17017 May 2006 PNO-III-06-012A: Kewaunee: Manual Reactor Shutdown Following Feedwater Pump Trip (Update) ML0611803492006-04-28028 April 2006 PNO-III-06-012: Kewaunee, Manual Reactor Shutdown Following Feedwater Pump Trip PNO-III-05-003, Kewaunee Shutdown in Excess of 72 Hours Due to Auxiliary Feedwater System Declared Inoperable Due to High Energy Line Break Concerns2005-02-23023 February 2005 PNO-III-05-003: Kewaunee Shutdown in Excess of 72 Hours Due to Auxiliary Feedwater System Declared Inoperable Due to High Energy Line Break Concerns PNO-III-04-001, Kewaunee: Plant Shutdown Greater than 72 Hours and Initiation of NRC Special Inspection to Look Into Plant Shutdown Due to Both Trains of Safety Injection System Declared Inoperable2004-01-20020 January 2004 PNO-III-04-001 Kewaunee: Plant Shutdown Greater than 72 Hours and Initiation of NRC Special Inspection to Look Into Plant Shutdown Due to Both Trains of Safety Injection System Declared Inoperable PNO-III-02-022, Shutdown to Repair Component Cooling Heat Exchanger2002-05-0707 May 2002 PNO-III-02-022 - Shutdown to Repair Component Cooling Heat Exchanger 2012-10-23 |